Behrman
1414 Sumner Street is in Behrman, zoned HU-RD2 (Older neighborhoods, two-family homes mixed with single-family homes). The city has 5 permits on record here; the most recent, an electrical service / circuit / feeder permit, was filed in July 2008. 5 are still open. A demolition permit was filed in April 2008. There were 5 past code enforcement cases, the latest in April 2009, all closed. On this block in the past year: 4 requests to 311 and 6 calls to police.
- Zoning
- HU-RD2
- Historic district
- None
- Council district
- C
- Ward
- 15
- Lot size
- 4,679 sq ft
- Parcel
- 41002691
Everything on record here
11 records, newest first · 5 open
-
Short-term rental Short Term Rental license application Denied
- Type
- Short Term Rental
- Operator
- Ronald K Davis
-
Code enforcement Case ENVHADJ-982918 Closed
A hearing was held on 04/10/2009 with a result of "Found Guilty". The case was subsequently closed.
- Inspection: Inspection Complete
- Hearing: Initial Hearing Found Guilty
The city links this case to permit 08ELC-16557.
-
Code enforcement Case ENVHADJ-99127HB Closed
A hearing was held on 04/10/2009 with a result of "Found Guilty". The case was subsequently closed.
- Inspection: Inspection Complete
- Hearing: Initial Hearing Found Guilty
The city links this case to permit 08ELC-16557.
-
Code enforcement Case ENVHADJ-20021955EH Closed
A hearing was held on 04/10/2009 with a result of "Found Guilty". The case was subsequently closed.
- Inspection: Inspection Complete
- Hearing: Initial Hearing Found Guilty
The city links this case to permit 08ELC-16557.
-
Code enforcement Case ENVHADJ-20032414EH Closed
A hearing was held on 04/10/2009 with a result of "Found Guilty". The case was subsequently closed.
- Inspection: Inspection Complete
- Hearing: Initial Hearing Found Guilty
The city links this case to permit 08ELC-16557.
-
Code enforcement Case ENVHADJ-972141 Closed
A hearing was held on 04/10/2009 with a result of "Found Guilty". The case was subsequently closed.
- Inspection: Inspection Complete
- Hearing: Initial Hearing Found Guilty
The city links this case to permit 08ELC-16557.
-
Permit Electrical Service / Circuit / Feeder Application Acceptance - Approved
MODULAR HOME 3RD PARTY INSPECTION PAPERS SUBMITTED AT TIME APPLICATION
- Permit
- 08ELC-16535
- Type
- Electrical Service / Circuit / Feeder
- Work
- Service-Circuits-Feeders
- Estimated cost (applicant’s figure)
- $0
- Fees
- $138
- Contractor
- Posey Electrical Service
- Days from application to issue
- 10
-
Permit Electrical Service / Circuit / Feeder Application Acceptance - Approved
MODULAR HOME 3RD PARTY INSPECTION PAPERS SUBMITTED AT TIME OF APPLICATION
- Permit
- 08ELC-16557
- Type
- Electrical Service / Circuit / Feeder
- Work
- Service-Circuits-Feeders
- Estimated cost (applicant’s figure)
- $0
- Fees
- $138
- Contractor
- Posey Electrical Service
- Days from application to issue
- 10
-
Permit Demolition Application Acceptance - Approved No Review
DEMOLISH SINGLE-FAMILY HOUSE TO GRADE. CONTRACTORS SHALL REMOVE AND DISPOSE OF ALL DEBRIS WITHIN 72 HOURS OF COMPLETION. PROOF OF DISPOSAL REQUIRED AT TIME OF FINAL INSPECTION. SEPARATE PERMIT REQUIRED FROM SEWERAGE AND WATER BOARD TO CAP SEWER LINES AND REMOVE WATER METERS.
- Permit
- 08BLD-02736
- Type
- Demolition
- Work
- Demolition
- Estimated cost (applicant’s figure)
- $10,000
- Fees
- $125
- Contractor
- Drc Emergency Servces,Llc
- Days from application to issue
- 6
-
Permit New Construction Certificate of Occupancy - Issued No Meter
NEW CONSTRUCTION OF A MODULAR SINGLE-STORY, TWO-FAMILY DWELLING AS PER PLANS
- Permit
- 08BLD-02277
- Type
- New Construction
- Work
- New
- Estimated cost (applicant’s figure)
- $102,000
- Fees
- $662
- Contractor
- Dietrich Kindl
- Days from application to issue
- 13
-
Permit Demolition Application Acceptance - Approved No Review
DEMOLISH VACANT RESIDENCE AND/OR SLAB TO GRADE AS PER OWNERS REQUEST AND HAUL AWAY DEBRIS WITHIN 72 HOURS OF DEMOLITION. ANY FURTHER CONSTRUCTION WILL REQUIRE A SEPARATE PERMIT.
- Permit
- 08BLD-02240
- Type
- Demolition
- Work
- Demolition
- Estimated cost (applicant’s figure)
- $5,000
- Fees
- $100
- Days from application to issue
- 5