Lakeshore - Lake Vista

748 Amethyst Street is in Lakeshore - Lake Vista, zoned S-LRS2 (Lake area single-family homes). The city has 3 permits on record here; the most recent, a permanent generator permit, was filed in April 2024. 2 are still open. On this block in the past year: 4 requests to 311 and 3 calls to police.

Zoning
S-LRS2
Historic district
None
Council district
D
Ward
4
Lot size
9,165 sq ft
Parcel
41011183

Everything on record here

3 records, newest first · 2 open

  1. Permit Permanent Generator Permit Issued

    Installing a 24kW Generac generator with a 200amp transfer switch for emergency backup power.

    Permit
    24-11922-EGEN
    Type
    Permanent Generator
    Work
    Permanent Generator
    Estimated cost (applicant’s figure)
    $16,400
    Fees
    $103
    Contractor
    Jeremiah Alexander Johnson
    Days from application to issue
    8
    Expires
    Nov 2, 2024
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date

    See this permit on One Stop

  2. Permit Mechanical Fuel Gas Permit Finaled

    Installing a 24kW Generac generator with a 200amp transfer switch for emergency backup power.

    Permit
    24-11912-FGAS
    Type
    Mechanical Fuel Gas
    Work
    Mechanical Fuel Gas
    Estimated cost (applicant’s figure)
    $16,400
    Fees
    $50
    Contractor
    Jeremiah Alexander Johnson
    Days from application to issue
    0
    Expires
    Oct 24, 2024
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  3. Permit Accessory Structure Permit Issued

    Installing a 24kW Generac generator with a 200amp transfer switch for emergency backup power.

    Permit
    24-10548-ACCS
    Type
    Accessory Structure
    Work
    Accessory Structure
    Estimated cost (applicant’s figure)
    $16,400
    Fees
    $205
    Contractor
    Jeremiah Alexander Johnson
    Days from application to issue
    13
    Expires
    Oct 23, 2024
    1. Application submitted
    2. Application review
    3. Zoning review
    4. Plan review
    5. Permit approved
    6. Issue date

    See this permit on One Stop