Lakeview

6216 Milne Boulevard is in Lakeview, zoned S-LRS1 (Lake area single-family homes). The city has 4 permits on record here; the most recent, an electrical service / circuit / feeder permit, was filed in January 2008. 4 are still open. A demolition permit was filed in October 2006. There was 1 past code enforcement case, the latest in April 2009, all closed. On this block in the past year: 7 requests to 311 and 8 calls to police.

Zoning
S-LRS1
Historic district
None
Council district
A
Ward
4
Lot size
5,705 sq ft
Parcel
41011513

Everything on record here

5 records, newest first · 4 open

  1. Code enforcement Case ENVHADJ-2007333EH Closed

    A hearing was held on 05/12/2012 but the result of the hearing is still pending.

    1. Inspection: Inspection Complete
    2. Hearing: Initial Hearing Result Pending

    The city links this case to permit 08ELC-02202.

  2. Permit Electrical Service / Circuit / Feeder Application Acceptance - Approved

    MODULAR HOME- 3RD PARTY INSPECTION CERTIFICATE PROVIDED AT TIME OF FILING. SEE ATTACHED.

    Permit
    08ELC-02200
    Type
    Electrical Service / Circuit / Feeder
    Work
    Service-Circuits-Feeders
    Estimated cost (applicant’s figure)
    $0
    Fees
    $78
    Contractor
    Nick Ciaccio
    Days from application to issue
    10
  3. Permit General Mechanical Application Acceptance - Approved

    AJM311, CK 9038, MATT, , 1 WAF AND 1 AC,

    Permit
    08MCH-01559
    Type
    General Mechanical
    Work
    General Mechanical
    Estimated cost (applicant’s figure)
    $0
    Fees
    $62
    Contractor
    Haydels Heating & A/C
    Days from application to issue
    5
  4. Permit New Construction Inspection - Completed No Requirements

    CONSTRUCTION TO A NEW TWO FAMILY, SINGLE STORY MODULAR HOME PER SKETCH. 6219-18 MILNE BLVD.

    Permit
    07BLD-10630
    Type
    New Construction
    Work
    New
    Estimated cost (applicant’s figure)
    $140,000
    Fees
    $750
    Days from application to issue
    5
  5. Permit Demolition Certificate of Occupancy - Issued No Meter

    Demolition of hurricane damaged DOUBLE. Contractor to remove and dispose of all debris within 72 hours and to have a final inspection of the site. A licensed plumber must secure a separate permit from the Sewage and Water Board to cap off sewer lines and remove water meters prior to demolition.

    Permit
    06BLD-09013
    Type
    Demolition
    Work
    Demolition
    Estimated cost (applicant’s figure)
    $5,000
    Fees
    $100
    Days from application to issue
    5