Lakeview
6209 West End Boulevard is in Lakeview, zoned S-LRS1 (Lake area single-family homes). The city has 5 permits on record here; the most recent, a change of use permit, was filed in September 2007. 5 are still open. On this block in the past year: 6 requests to 311 and 9 calls to police.
- Zoning
- S-LRS1
- Historic district
- None
- Council district
- A
- Ward
- 4
- Lot size
- 6,015 sq ft
- Parcel
- 41011806
Everything on record here
5 records, newest first · 5 open
-
Permit Change of Use Application Acceptance - Approved No Review
Converting from two family dwelling to one
- Permit
- 07BLD-09365
- Type
- Change of Use
- Work
- Change of Use
- Estimated cost (applicant’s figure)
- $2,000
- Fees
- $60
- Days from application to issue
- 5
-
Permit Electrical Service / Circuit / Feeder Application Acceptance - Approved
REWIRE
- Permit
- 07ELC-20825
- Type
- Electrical Service / Circuit / Feeder
- Work
- Service-Circuits-Feeders
- Estimated cost (applicant’s figure)
- $0
- Fees
- $171
- Contractor
- Rick's Electric
- Days from application to issue
- 10
-
Permit Electrical Repair / Replacement / Addition Application Acceptance - Approved
reconnect
- Permit
- 06ELC-06688
- Type
- Electrical Repair / Replacement / Addition
- Work
- Repair-Replacement-Addition
- Estimated cost (applicant’s figure)
- $0
- Fees
- $30
- Contractor
- Power Electrical M
- Days from application to issue
- 10
-
Permit Electrical Repair / Replacement / Addition Application Acceptance - Approved
reconnect
- Permit
- 06ELC-06689
- Type
- Electrical Repair / Replacement / Addition
- Work
- Repair-Replacement-Addition
- Estimated cost (applicant’s figure)
- $0
- Fees
- $30
- Contractor
- Power Electrical M
- Days from application to issue
- 10
-
Permit Emergency Permit Certificate of Occupancy - Issued No Meter
REPAIR DAMAGES FROM HURRICANES: REMOVE REPLACE DRYWALL, CABINETS; REWIRE ELECTRICAL; REPAIR HVAC
- Permit
- 05BLD-05375
- Type
- Emergency Permit
- Work
- Emergency Permit
- Estimated cost (applicant’s figure)
- $65,000
- Fees
- $375
- Days from application to issue
- 28