Lakeview
808 Allen Toussaint Boulevard is in Lakeview, zoned S-LRS1 (Lake area single-family homes). The city has 6 permits on record here; the most recent, a general mechanical permit, was filed in August 2010. 6 are still open. A demolition permit was filed in February 2007. On this block in the past year: 8 requests to 311 and 3 calls to police.
- Zoning
- S-LRS1
- Historic district
- None
- Council district
- A
- Ward
- 4
- Lot size
- 6,399 sq ft
- Parcel
- 41013155
Everything on record here
6 records, newest first · 6 open
-
Permit General Mechanical Inspection - Completed
new gasline; gas w/heater; loglighter; roy ; ck#16290.
- Permit
- 10MCH-07409
- Type
- General Mechanical
- Work
- General Mechanical
- Estimated cost (applicant’s figure)
- $0
- Fees
- $55
- Contractor
- A-1 Airco Inc.
- Days from application to issue
- 5
-
Permit General Mechanical Inspection - Completed
gas waf/4ton ac unit/ john ; ck#6697.
- Permit
- 10MCH-07261
- Type
- General Mechanical
- Work
- General Mechanical
- Estimated cost (applicant’s figure)
- $0
- Fees
- $73
- Contractor
- City Wide A/C Htg
- Days from application to issue
- 5
-
Permit Electrical Service / Circuit / Feeder Permit Issuance - Active
REWIRE- 10BLD-01492
- Permit
- 10ELC-05102
- Type
- Electrical Service / Circuit / Feeder
- Work
- Service-Circuits-Feeders
- Estimated cost (applicant’s figure)
- $0
- Fees
- $163
- Contractor
- Tom Delbert Electrical
- Days from application to issue
- 0
-
Permit Electrical Permit Issuance Active
TEMP POLE- 10BLD-01492
- Permit
- 10ELC-03261
- Type
- Electrical
- Work
- Construction Loop
- Estimated cost (applicant’s figure)
- $0
- Fees
- $40
-
Permit New Construction Certificate of Occupancy - Issued w/Meter
build single family dwelling as per plans. elevation 17.93 navd
- Permit
- 10BLD-01492
- Type
- New Construction
- Work
- New
- Estimated cost (applicant’s figure)
- $135,000
- Fees
- $870
- Days from application to issue
- 0
-
Permit Demolition Inspection - Completed No Requirements
Demolition of hurricane damaged single residential unit. Contractor to remove and dispose of all debris within 72 hours, and to have a final inspection of the site. A licensed plumber must secure a separate permit from the Sewage and Water Board to cap off sewer lines and remove water meters prior to demolition.
- Permit
- 07BLD-00896
- Type
- Demolition
- Work
- Demolition
- Estimated cost (applicant’s figure)
- $15,124
- Fees
- $155
- Contractor
- New Orleans Demolition
- Days from application to issue
- 5