Lakeview
977 Florida Avenue is in Lakeview, zoned S-LB2 (Lake area neighborhood business). The city has 12 permits on record here; the most recent, a change of address permit, was filed in April 2025. 6 are still open.
- Zoning
- S-LB2
- Historic district
- None
- Council district
- A
- Ward
- 4
- Lot size
- 67,711 sq ft
- Parcel
- 41014075
Everything on record here
12 records, newest first · 6 open
-
Permit Change of Address Other
25-10024-NEWC Business Use ADD 5750 Orleans Ave (Address of Record)
- Permit
- 25-10479-ECOA
- Type
- Change of Address
- Work
- Change of Address
- Estimated cost (applicant’s figure)
- $0
- Fees
- $0
- Days from application to issue
- 0
- Expires
- Oct 4, 2025
- Application submitted
- Permit approved
- Issue date
-
Permit New Construction Permit Cancelled
Construction of a new secured parking lot. No building structures are proposed on the site. Only flatwork, gates, fencing, & electrical. Please note that the property is located at 977 Florida Boulevard NOLA 70124. Please note that the property is located at 977 Florida Boulevard NOLA 70124. Please note that the property is located at 977 Florida Boulevard NOLA 70124. 977 Florida Boulevard did not show up in the pulldown menu. Permit has been relocated to the address 5750 Orleans Ave. -JT
- Permit
- 25-10024-NEWC
- Type
- New Construction
- Work
- New Construction
- Estimated cost (applicant’s figure)
- $150,000
- Fees
- $960
- Contractor
- Marsiglia Construction Co
- Application submitted
-
Permit Permanent Generator Permit Finaled
Replace existing backup generator.
- Permit
- 23-05456-EGEN
- Type
- Permanent Generator
- Work
- Permanent Generator
- Estimated cost (applicant’s figure)
- $9,675
- Fees
- $100
- Contractor
- Timothy Jason Carman
- Days from application to issue
- 7
- Expires
- Sep 7, 2023
- Application submitted
- Application review
- Permit approved
- Issue date
- First inspection
-
Permit Renovation (Structural) Permit Issued
ATC 304890 - TMOBILE NO00039A - Generator Swap/Upgrade 977 Florida BLVD New Orleans LA - Removing (1) Existing Generator, and (1) Existing Generator Platform. Installing (1) proposed 25kw Diesel Generator, (1) proposed 4'x9' concrete generator pad, (1) 120/240V 1o ATS, and (1) 120/240V Emergency Shut-Off Switch.
- Permit
- 21-23139-RNVS
- Type
- Renovation (Structural)
- Work
- Renovation (Structural)
- Estimated cost (applicant’s figure)
- $40,000
- Fees
- $320
- Contractor
- Eastex Towers, LLC, Mastec Network Solutions, LLC
- Days from application to issue
- 562
- Expires
- Aug 22, 2023
- Application submitted
- Zoning review
- Plan review
- Application review
- Permit approved
- Issue date
-
Permit Renovation (Non-Structural) Permit Issued
ATC 304890 - NO00039A - T-Mobile Upgrade to existing cell tower including (3) ANTENNA(s), (1) RRU PENDANT AND (1) HCS 2.0 HYBRID TRUNK. (2) AMIA(S), (1) HCS 2.0 JUNCTION BOX, (2) ASIK, (1) ASIB, (6) ABIC, (3) AMIA, (1) HCS 2.0 HYBRID TRUNK AND (1) PLATFORM MOUNTED H-FRAME. and removing (1) AIRSCALE RACK, (1) AMOB, (1) ASIK, AND (2) ABIA(S). and relocating (1) COVP AND (1) FSMF TO PROPOSED H-FRAME. See plans for details.
- Permit
- 21-13970-RNVN
- Type
- Renovation (Non-Structural)
- Work
- Renovation (Non-Structural)
- Estimated cost (applicant’s figure)
- $15,000
- Fees
- $135
- Contractor
- SAC Wireless
- Days from application to issue
- 21
- Expires
- Dec 4, 2021
- Application submitted
- Application review
- Zoning review
- Plan review
- Permit approved
- Issue date
-
Permit Renovation (Non-Structural) Other
ATC 304890 - TMO NO00039A - Removing (9) antennas and installing (3) antennas and other radio equipment on the existing cell tower.
- Permit
- 20-40719-RNVN
- Type
- Renovation (Non-Structural)
- Work
- Renovation (Non-Structural)
- Estimated cost (applicant’s figure)
- $15,000
- Fees
- $135
- Contractor
- American Tower
- Days from application to issue
- 8
- Expires
- Mar 24, 2021
- Application submitted
- Application review
- Zoning review
- Plan review
- Permit approved
- Issue date
-
Permit Renovation (Non-Structural) Other
304890 - T-Mobile. Cell tower upgrade, adding 3 antennas.
- Permit
- 18-35653-RNVN
- Type
- Renovation (Non-Structural)
- Work
- Renovation (Non-Structural)
- Estimated cost (applicant’s figure)
- $18,000
- Fees
- $210
- Contractor
- American Tower Asset Sub LLC
- Days from application to issue
- 14
- Expires
- May 9, 2019
- Application submitted
- Application review
- Zoning review
- Plan review
- Permit approved
- Issue date
-
Permit Renovation (Non-Structural) Occupancy
Update antenna equipment for existing monopole - Add 3 new T-Mobile antennas and add additional equipment as per attached drawings.
- Permit
- 16-36232-RNVN
- Type
- Renovation (Non-Structural)
- Work
- Renovation (Non-Structural)
- Estimated cost (applicant’s figure)
- $7,500
- Fees
- $100
- Contractor
- Mastec Network Solutions LLC
- Days from application to issue
- 0
- Expires
- May 1, 2017
-
Permit Electrical Repair / Replacement / Addition Permit Issued
PLANNED OUTAGE RECONNECT
- Permit
- 13-41882-ERPR
- Type
- Electrical Repair / Replacement / Addition
- Work
- Electrical Repair / Replacement / Addition
- Estimated cost (applicant’s figure)
- $0
- Fees
- $40
- Contractor
- Benjiman Dewey Allen
- Days from application to issue
- 0
- Expires
- Apr 22, 2014
-
Permit Renovation (Structural) Plan Review - Completed
Emergency generator for cell tower as per plans
- Permit
- 08COM-01693
- Type
- Renovation (Structural)
- Work
- NA
- Estimated cost (applicant’s figure)
- $18,100
- Fees
- $195
- Contractor
- Brian Quinn
- Days from application to issue
- 86
-
Permit Electrical
NEW CONSTRUCTION PROJECT ANTENNA BEN ALLEN
- Permit
- E01005209
- Type
- Electrical
- Days from application to issue
- 0
Placed here by its tax bill number from “977 FLORIDA BL”.
-
Permit Building
NEW CONSTRUCTION PROJECT ANTENNA INSTALLATION OF ANTENNA AND SUPPORT EQUIPMENT ON EXISTING TOWER AS PER PLANS
- Permit
- B01002937
- Type
- Building
- Days from application to issue
- 32