5571 Milne Street is in Navarre, zoned S-LRS1 (Lake area single-family homes). The city has 6 permits on record here; the most recent, an electrical service / circuit / feeder permit, was filed in March 2018. 1 is still open. A demolition permit was filed in March 2007. There were 4 past code enforcement cases, the latest in December 2013, all closed. On this block in the past year: 5 requests to 311 and 0 calls to police.

Zoning
S-LRS1
Historic district
None
Council district
A
Ward
4
Lot size
6,990 sq ft
Parcel
41014200

Everything on record here

10 records, newest first · 1 open

  1. Permit Electrical Service / Circuit / Feeder Permit Finaled

    FURNISH AND INSTALL WIRE FOR NRE CONSTRUCTION HOME

    Permit
    18-08369-SERV
    Type
    Electrical Service / Circuit / Feeder
    Work
    Electrical Service / Circuit / Feeder
    Estimated cost (applicant’s figure)
    $10,000
    Fees
    $190
    Contractor
    David Laporte Jr
    Days from application to issue
    0
    Expires
    Sep 12, 2018
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  2. Permit Mechanical Fuel Gas Permit Finaled

    New construction. One gas tankless water heater, freestanding stove, dryer, gas light, two outdoor outlets. Total BTU 550,000 Dauterive Plumbing

    Permit
    18-06919-FGAS
    Type
    Mechanical Fuel Gas
    Work
    Mechanical Fuel Gas
    Estimated cost (applicant’s figure)
    $3,500
    Fees
    $41
    Days from application to issue
    1
    Expires
    Aug 28, 2018
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  3. Permit Mechanical HVAC Permit Finaled

    Installing two electric systems and ductwork.

    Permit
    18-04272-HVAC
    Type
    Mechanical HVAC
    Work
    Mechanical HVAC
    Estimated cost (applicant’s figure)
    $0
    Fees
    $103
    Contractor
    Boudreaux Builders
    Days from application to issue
    0
    Expires
    Aug 6, 2018
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  4. Permit Construction Loop Permit Finaled

    TEMP POLE

    Permit
    17-37301-LOOP
    Type
    Construction Loop
    Work
    Construction Loop
    Estimated cost (applicant’s figure)
    $250
    Fees
    $40
    Days from application to issue
    9
    Expires
    May 10, 2018

    See this permit on One Stop

  5. Permit New Construction Occupancy

    Construct 2990 sq foot 2-story single-family dwelling as per plans.

    Permit
    17-29234-NEWC
    Type
    New Construction
    Work
    New Construction
    Estimated cost (applicant’s figure)
    $494,124
    Fees
    $3,030
    Contractor
    Boudreaux Builders, Stephen Cali
    Days from application to issue
    33
    Expires
    Apr 24, 2018

    See this permit on One Stop

  6. Code enforcement Case 13-10425-MPM Closed

    A hearing was held on 01/23/2014 with a result of "Guilty".

    1. Inspection: Inspection Violation: No WIP
    2. Violation: 160 Weeds and Plant Growth
    3. Violation: 161 Rodent Harborage
    4. Inspection: Posting of Hearing Notice Violation: No WIP
    5. Hearing: Initial Hearing Guilty
  7. Code enforcement Case CEHB-12-1597 Closed

    A hearing was held on 11/07/2012 with a result of "In Compliance Fees Due".

    1. Inspection: Inspection Violation Posted No WIP
    2. Inspection: Posting of Hearing Notice No Violation
    3. Hearing: Initial Hearing In Compliance Fees Due
  8. Code enforcement Case HCEVU-11-02350 Closed

    The property was inspected on 03/25/2011 with a finding of "Violation Unoccupied". The file was subsequently closed.

    1. Inspection: Inspection Violation Unoccupied
  9. Code enforcement Case HCEC-11-00947 Closed

    The property was inspected on 03/25/2011 with a finding of "Violation Unoccupied". The file was subsequently closed.

  10. Permit Demolition Application Acceptance - Approved No Review

    DEMOLISH VACANT RESIDENCE TO GRADE PER OWNERS REQUEST AND DEBRIS REMOVAL WITHIN 72 HOURS OF THE DEMOLITION. OUTSIDE OF THE HCDRC. A FINAL INSPECTION IS REQUIRED. A LICENSED PLUMBER MUST SECURE A SEPARATE PERMIT FROM THE SEWERAGE AND WATER BOARD TO CAP OFF SEWER LINES AND REMOVE WATER METERS PRIOR TO DEMOLITION. ANY FURTHER CONSTRUCTION WILL REQUIRE A SEPARATE PERMIT.

    Permit
    07BLD-02562
    Type
    Demolition
    Work
    Demolition
    Estimated cost (applicant’s figure)
    $800
    Fees
    $80
    Days from application to issue
    5