Navarre
923 Navarre Street is in Navarre, zoned S-LRS1 (Lake area single-family homes). The city has 5 permits on record here; the most recent, a mechanical fuel gas permit, was filed in December 2021. 4 are still open. On this block in the past year: 11 requests to 311 and 0 calls to police.
- Zoning
- S-LRS1
- Historic district
- None
- Council district
- A
- Ward
- 4
- Lot size
- 5,981 sq ft
- Parcel
- 41014325
Everything on record here
5 records, newest first · 4 open
-
Permit Mechanical Fuel Gas Permit Issued
6 month gas inspection. Everything to code. Another company installed a gas water heater, pumped up and tested line. It drops rapidly. Went under house and found old line (2) with regulator, and it is leaking. Will remove and cap off. If no other leaks, will file an inspection.
- Permit
- 21-33839-FGAS
- Type
- Mechanical Fuel Gas
- Work
- Mechanical Fuel Gas
- Estimated cost (applicant’s figure)
- $2,584
- Fees
- $30
- Contractor
- Gary Greenwald
- Days from application to issue
- 7
- Expires
- Jun 13, 2022
- Application submitted
- Application review
- Permit approved
- Issue date
-
Permit Street Cut Other
Install fiber optics.
- Permit
- 17-39717-RSTC
- Type
- Street Cut
- Work
- Street Cut
- Estimated cost (applicant’s figure)
- $0
- Fees
- $0
- Contractor
- Southern Light LLC
- Days from application to issue
- 8
- Expires
- May 29, 2018
Placed here by its tax bill number from “950 Navarre St”.
-
Permit Residential APPROVAL
single house
- Permit
- ACCELA-89544
- Type
- Residential
- Work
- Repair
- Estimated cost (applicant’s figure)
- $25,000
-
Permit Electrical Repair / Replacement / Addition Application Acceptance - Approved
RECONNECT
- Permit
- 06ELC-23057
- Type
- Electrical Repair / Replacement / Addition
- Work
- Repair-Replacement-Addition
- Estimated cost (applicant’s figure)
- $0
- Fees
- $30
- Contractor
- Zapalowski Electric
- Days from application to issue
- 10
-
Permit Construction Loop Application Acceptance - Approved
RECONNECT
- Permit
- 06ELC-01727
- Type
- Construction Loop
- Work
- Construction Loop
- Estimated cost (applicant’s figure)
- $0
- Fees
- $30
- Contractor
- Zapalowski Electric
- Days from application to issue
- 10