Navarre

5615 General Haig Street is in Navarre, zoned S-LRS1 (Lake area single-family homes). The city has 7 permits on record here; the most recent, a small cell installation permit, was filed in June 2020. 1 is still open. A demolition permit was filed in December 2006. There were 7 past code enforcement cases, the latest in April 2018, all closed. On this block in the past year: 7 requests to 311 and 1 call to police.

Zoning
S-LRS1
Historic district
None
Council district
A
Ward
4
Lot size
5,071 sq ft
Parcel
41015607

Everything on record here

14 records, newest first · 1 open

  1. Permit Small Cell Installation Other

    Replace existing wood utility pole with wood pole E side Common Pl.

    Permit
    20-30986-SMCL
    Type
    Small Cell Installation
    Work
    Small Cell Installation
    Estimated cost (applicant’s figure)
    $0
    Fees
    $1,000
    Days from application to issue
    160
    Expires
    May 17, 2021
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date

    See this permit on One Stop

    Placed here by its map location from “5619 General Haig St”.

  2. Permit Mechanical HVAC Permit Finaled

    Installed two New systems one 2-ton gas and one 3-ton gas system all New duct work and all related equipment and materials.

    Permit
    18-30446-HVAC
    Type
    Mechanical HVAC
    Work
    Mechanical HVAC
    Estimated cost (applicant’s figure)
    $9,000
    Fees
    $110
    Days from application to issue
    1
    Expires
    Mar 14, 2019
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  3. Permit Mechanical Fuel Gas Permit Finaled

    New Construction. 7670

    Permit
    18-25025-FGAS
    Type
    Mechanical Fuel Gas
    Work
    Mechanical Fuel Gas
    Estimated cost (applicant’s figure)
    $0
    Fees
    $40
    Contractor
    Jeremy Ferret
    Days from application to issue
    0
    Expires
    Jan 27, 2019
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  4. Permit Construction Loop Permit Finaled

    Temporary Pole

    Permit
    18-18174-LOOP
    Type
    Construction Loop
    Work
    Construction Loop
    Estimated cost (applicant’s figure)
    $3,500
    Fees
    $40
    Contractor
    Sidney A Ippolito
    Days from application to issue
    0
    Expires
    Nov 30, 2018
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  5. Permit Electrical Service / Circuit / Feeder Permit Finaled

    New service, 100amp service, ground system properly. Install 20 circuits for total new wiring job.

    Permit
    18-18166-SERV
    Type
    Electrical Service / Circuit / Feeder
    Work
    Electrical Service / Circuit / Feeder
    Estimated cost (applicant’s figure)
    $12,500
    Fees
    $130
    Contractor
    Sidney A Ippolito
    Days from application to issue
    0
    Expires
    Nov 30, 2018
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  6. Code enforcement Case 18-02713-MPM Closed

    The property was inspected on 05/10/2018 with a finding of "Violation: WIP". The file was subsequently closed.

    1. Inspection: Inspection Violation: WIP

    The city links this case to permit 18-30446-HVAC.

  7. Permit New Construction Occupancy

    Cosntruct 1567 sq ft 2-story single-family dwelling as per plans.

    Permit
    18-02272-NEWC
    Type
    New Construction
    Work
    New Construction
    Estimated cost (applicant’s figure)
    $259,260
    Fees
    $1,620
    Contractor
    Dragan Segvic LLC dba Dragan Segvic, Andrew Liles
    Days from application to issue
    76
    Expires
    Oct 9, 2018
    1. Application submitted
    2. Application review
    3. Zoning review
    4. Plan review
    5. Permit approved
    6. Issue date
    7. First inspection

    See this permit on One Stop

  8. Code enforcement Case 16-06040-MPM Closed

    The property was inspected on 07/26/2016 with a finding of "Violation: No WIP". The file was subsequently closed.

    1. Inspection: Inspection Violation: No WIP
    2. Violation: 160 Weeds and Plant Growth
    3. Violation: 161 Rodent Harborage

    The city links this case to permit 18-30446-HVAC.

  9. Code enforcement Case 14-08366-MPM Closed

    The property was inspected on 05/20/2015 with a finding of "No Violation". The file was subsequently closed.

    1. Inspection: Inspection No Violation

    The city links this case to permit 18-30446-HVAC.

  10. Code enforcement Case CEHB-11-7853 Closed

    The case was filed on 10/19/2011 but has since been closed without further action.

    The city links this case to permit 18-30446-HVAC.

  11. Code enforcement Case CEHB-11-3473 Closed

    The case was filed on 05/26/2011 but has since been closed without further action.

    1. Inspection: Inspection Violation Posted No WIP

    The city links this case to permit 18-30446-HVAC.

  12. Code enforcement Case HCEC-11-01071 Closed

    The property was inspected on 05/26/2011 with a finding of "Violation Unoccupied". The file was subsequently closed.

    1. Inspection: Inspection Violation Unoccupied
  13. Code enforcement Case ENVHADJ-09-03405 Closed

    The property was inspected on 10/02/2009 with a finding of "Adjudication Fast Track". The file was subsequently closed.

    1. Inspection: Inspection Adjudication Fast Track

    The city links this case to permit 18-30446-HVAC.

  14. Permit Demolition Certificate of Occupancy - Issued No Meter

    DEMOLISH SINGLE FAMILY HOUSE TO GRADE. CONTRACTOR SHALL REMOVE AND DISPOSE OF ALL DEBRIS WITHIN 72 HOURS OF COMPLETION. PROOF OF DISPOSAL REUQIRED AT TIME OF FINAL INSPECTION. SEPARATE PERMIT REQUIRED FROM SEWAGE AND WATER BOARD TO CAP SEWER LINES AND REMOVE WATER METERS.

    Permit
    06BLD-11808
    Type
    Demolition
    Work
    Demolition
    Estimated cost (applicant’s figure)
    $10,000
    Fees
    $125
    Days from application to issue
    5