137 North Solomon Street is in Mid-City, zoned HU-RD2 (Older neighborhoods, two-family homes mixed with single-family homes). It is in the Mid-City historic district under partial HDLC control, where demolition needs HDLC review. The city has 3 permits on record here; the most recent, an electrical repair / replacement / addition permit, was filed in December 2005. 3 are still open. There was 1 past code enforcement case, the latest in April 2009, all closed. On this block in the past year: 7 requests to 311 and 4 calls to police.
- Zoning
- HU-RD2
- Historic district
- Mid-City (Partial control)
- National Register
- Mid-City Historic District
- Council district
- A
- Ward
- 4
- Lot size
- 4,243 sq ft
- Parcel
- 41015902
Everything on record here
4 records, newest first · 3 open
-
Code enforcement Case ENVHADJ-2000673SN Closed
A hearing was held on 04/10/2009 with a result of "Found Guilty". The case was subsequently closed.
- Inspection: Inspection Complete
- Hearing: Initial Hearing Found Guilty
The city links this case to permit 18-37065-SLBN.
-
Permit Electrical Repair / Replacement / Addition Application Acceptance - Approved
reconnect
- Permit
- 05ELC-12550
- Type
- Electrical Repair / Replacement / Addition
- Work
- Repair-Replacement-Addition
- Estimated cost (applicant’s figure)
- $0
- Fees
- $30
- Contractor
- Cambas Electric Inc
- Days from application to issue
- 10
-
Permit Electrical Repair / Replacement / Addition Application Acceptance - Approved
reconnect
- Permit
- 05ELC-12551
- Type
- Electrical Repair / Replacement / Addition
- Work
- Repair-Replacement-Addition
- Estimated cost (applicant’s figure)
- $0
- Fees
- $30
- Contractor
- Cambas Electric Inc
- Days from application to issue
- 10
-
Permit Electrical Repair / Replacement / Addition Application Acceptance - Approved
reconnect
- Permit
- 05ELC-12552
- Type
- Electrical Repair / Replacement / Addition
- Work
- Repair-Replacement-Addition
- Estimated cost (applicant’s figure)
- $0
- Fees
- $30
- Contractor
- Cambas Electric Inc
- Days from application to issue
- 10