Treme - Lafitte
2430 Barracks Street is in Treme - Lafitte, zoned HU-RD2 (Older neighborhoods, two-family homes mixed with single-family homes). It is in the Tremé historic district under partial HDLC control, where demolition needs HDLC review. The city has 4 permits on record here; the most recent, a mechanical fuel gas permit, was filed in February 2026. There were 2 past code enforcement cases, the latest in March 2013, all closed. On this block in the past year: 7 requests to 311 and 0 calls to police.
- Zoning
- HU-RD2
- Historic district
- Tremé (Partial control)
- National Register
- Esplanade Ridge Historic District
- Council district
- C
- Ward
- 6
- Lot size
- 2,818 sq ft
- Parcel
- 41016383
Everything on record here
6 records, newest first
-
Permit Mechanical Fuel Gas Other
Gas Inspection-Out over 6 months-run gas line (40ft.) for four (4) outlets water heater, oven, stove and dryer
- Permit
- 26-03811-FGAS
- Type
- Mechanical Fuel Gas
- Work
- Mechanical Fuel Gas
- Estimated cost (applicant’s figure)
- $2,650
- Fees
- $65
- Days from application to issue
- 5
- Expires
- Aug 11, 2026
- Application submitted
- Application review
- Permit approved
- Issue date
- First inspection
-
Permit Electrical Vacancy Other
Electrical Vacancy, Power has been turned off for more than 6 months, Need Meter Release to Entergy
- Permit
- 25-24869-EVAC
- Type
- Electrical Vacancy
- Work
- Electrical Vacancy
- Estimated cost (applicant’s figure)
- $510
- Fees
- $40
- Contractor
- WILLIAM Floyd Schell III
- Days from application to issue
- 8
- Expires
- Feb 28, 2026
- Application submitted
- Application review
- Permit approved
- Issue date
- First inspection
-
Permit Electrical Service / Circuit / Feeder Permit Issued
Demo out the entire service including meter cans, stem and panel. Install a 100 amp double meter can with a 2" stem to the front corner of the house with 2/0 copper feeder wires. Recrimp "Hot" service drop to restore power. Upgrade main ground system with a #4 ground rod, intersystem ground bar and 2 - 8' ground rods. Install 1 - 100 amp main breaker 22 circuit Eaton Cutler Hammer CH series panels and breakers. Breakers will be correctly sized for the branch wire size at the panel.
- Permit
- 18-28309-SERV
- Type
- Electrical Service / Circuit / Feeder
- Work
- Electrical Service / Circuit / Feeder
- Estimated cost (applicant’s figure)
- $2,275
- Fees
- $70
- Contractor
- WILLIAM Floyd Schell III
- Days from application to issue
- 1
- Expires
- Feb 28, 2019
- Application submitted
- Application review
- Permit approved
- Issue date
- First inspection
-
Permit Electrical Service / Circuit / Feeder Permit Issued
Demo out the entire service including meter cans, stem and panel. Install a 100 amp double meter can with a 2" stem to the front corner of the house with 2/0 copper feeder wires. Recrimp "Hot" service drop to restore power. Upgrade main ground system with a #4 ground rod, intersystem ground bar and 2 - 8' ground rods. Install 1 - 100 amp main breaker 22 circuit Eaton Cutler Hammer CH series panels and breakers. Breakers will be correctly sized for the branch wire size at the panel.
- Permit
- 18-28307-SERV
- Type
- Electrical Service / Circuit / Feeder
- Work
- Electrical Service / Circuit / Feeder
- Estimated cost (applicant’s figure)
- $2,275
- Fees
- $70
- Contractor
- WILLIAM Floyd Schell III
- Days from application to issue
- 1
- Expires
- Feb 28, 2019
- Application submitted
- Application review
- Permit approved
- Issue date
- First inspection
-
Code enforcement Case 13-01477-PNBL Closed
The property was inspected on 03/18/2013 with a finding of "No Violation". The file was subsequently closed.
- Inspection: Inspection No Violation
The city links this case to permit 26-03811-FGAS.
-
Code enforcement Case ENVHADJ-20033875SN Closed
A hearing was held on 04/10/2009 with a result of "Found Guilty". The case was subsequently closed.
- Inspection: Inspection Complete
- Hearing: Initial Hearing Found Guilty
The city links this case to permit 18-28309-SERV.