Mid-City
101 North Salcedo Street is in Mid-City, zoned HU-MU (Older neighborhoods, walkable mix of shops with homes above). It is in the Mid-City historic district under partial HDLC control, where demolition needs HDLC review. The city has 1 permit on record here; the most recent, a dumpster/construction zone permit, was filed in June 2016. There were 3 past code enforcement cases, the latest in September 2011, all closed.
- Zoning
- HU-MU
- Historic district
- Mid-City (Partial control)
- National Register
- Mid-City Historic District
- Council district
- B
- Ward
- 4
- Lot size
- 2,685 sq ft
- Parcel
- 41020407
Everything on record here
4 records, newest first
-
Permit Dumpster/Construction Zone Other
Permit allows for the placement of a dumpster curbside on N. Salcedo Street along side of 3101 Canal Street at least 20 feet from the corner. (Dumpster for sidewalkwork under 16-15248 per sketch.)
- Permit
- 16-21423-RCZD
- Type
- Dumpster/Construction Zone
- Work
- Dumpster/Construction Zone
- Estimated cost (applicant’s figure)
- $0
- Fees
- $70
- Days from application to issue
- 0
- Expires
- Dec 29, 2016
-
Code enforcement Case CEHB-11-7183 Closed
The property was inspected on 09/22/2011 with a finding of "Violation Unoccupied". The file was subsequently closed.
- Inspection: Inspection Violation Unoccupied
The city links this case to permit 16-21423-RCZD.
-
Code enforcement Case HCEC-11-03668 Closed
The case was filed on 09/15/2011 but has since been closed without further action.
The city links this case to permit 16-21423-RCZD.
-
Code enforcement Case ENVHADJ-200832P Closed
The property was inspected on 08/17/2007 with a finding of "Complete". The file was subsequently closed.
- Inspection: Inspection Complete
The city links this case to permit 16-21423-RCZD.