Mid-City

101 North Salcedo Street is in Mid-City, zoned HU-MU (Older neighborhoods, walkable mix of shops with homes above). It is in the Mid-City historic district under partial HDLC control, where demolition needs HDLC review. The city has 1 permit on record here; the most recent, a dumpster/construction zone permit, was filed in June 2016. There were 3 past code enforcement cases, the latest in September 2011, all closed.

Zoning
HU-MU
Historic district
Mid-City (Partial control)
National Register
Mid-City Historic District
Council district
B
Ward
4
Lot size
2,685 sq ft
Parcel
41020407

Everything on record here

4 records, newest first

  1. Permit Dumpster/Construction Zone Other

    Permit allows for the placement of a dumpster curbside on N. Salcedo Street along side of 3101 Canal Street at least 20 feet from the corner. (Dumpster for sidewalkwork under 16-15248 per sketch.)

    Permit
    16-21423-RCZD
    Type
    Dumpster/Construction Zone
    Work
    Dumpster/Construction Zone
    Estimated cost (applicant’s figure)
    $0
    Fees
    $70
    Days from application to issue
    0
    Expires
    Dec 29, 2016

    See this permit on One Stop

  2. Code enforcement Case CEHB-11-7183 Closed

    The property was inspected on 09/22/2011 with a finding of "Violation Unoccupied". The file was subsequently closed.

    1. Inspection: Inspection Violation Unoccupied

    The city links this case to permit 16-21423-RCZD.

  3. Code enforcement Case HCEC-11-03668 Closed

    The case was filed on 09/15/2011 but has since been closed without further action.

    The city links this case to permit 16-21423-RCZD.

  4. Code enforcement Case ENVHADJ-200832P Closed

    The property was inspected on 08/17/2007 with a finding of "Complete". The file was subsequently closed.

    1. Inspection: Inspection Complete

    The city links this case to permit 16-21423-RCZD.