Hollygrove

9221 Forshey Street is in Hollygrove, zoned HU-RD2 (Older neighborhoods, two-family homes mixed with single-family homes). The city has 3 permits on record here; the most recent, a renovation (non-structural) permit, was filed in March 2004. 3 are still open. A demolition permit was filed in March 2004. There were 3 past code enforcement cases, the latest in April 2009, all closed. On this block in the past year: 2 requests to 311 and 9 calls to police.

Zoning
HU-RD2
Historic district
None
Council district
A
Ward
17
Lot size
3,250 sq ft
Parcel
41029370

Everything on record here

6 records, newest first · 3 open

  1. Code enforcement Case ENVHADJ-20015298P Closed

    A hearing was held on 04/10/2009 with a result of "Found Guilty". The case was subsequently closed.

    1. Inspection: Inspection Complete
    2. Hearing: Initial Hearing Found Guilty
  2. Code enforcement Case ENVHADJ-2002678HB Closed

    The property was inspected on 09/04/2001 with a finding of "Complete". The file was subsequently closed.

    1. Inspection: Inspection Complete
  3. Code enforcement Case ENVHADJ-20032726HB Closed

    A hearing was held on 04/10/2009 with a result of "Found Guilty". The case was subsequently closed.

    1. Inspection: Inspection Complete
    2. Hearing: Initial Hearing Found Guilty
  4. Permit Renovation (Non-Structural) Application Acceptance - Approved No Review

    GENERAL RENOVATIONS TO EXISTING SINGLE. NO INCREASE IN FOOTPRINT.

    Permit
    04BLD-00236
    Type
    Renovation (Non-Structural)
    Work
    Renovation (Non-Structural)
    Estimated cost (applicant’s figure)
    $15,000
    Fees
    $125
    Days from application to issue
    5
  5. Permit Demolition Application Acceptance - Approved No Review

    DEMOLISH VACANT SINGLE TO GRADE. DECLARED IMMINENT DANGER BY HOUSING AND NEIGHBORHOOD DEVELOPMENT. ANY FURTHER USE SHALL REQUIRE A SEPARATE PERMIT.

    Permit
    04BLD-00196
    Type
    Demolition
    Work
    Demolition
    Estimated cost (applicant’s figure)
    $2,350
    Fees
    $90
    Days from application to issue
    5
  6. Permit Building

    GENERAL REPAIRS SINGLE-FAMILY DWELLING REMOVE ALL DEBRIS,TRASH,OLD APPLIANCES INORDER TO SECURE BUILDING.EXT.WALLS TO REMAIN,INSIDE OF THE HCDRC DIST.PLANS TO FOLLOW BEFORE CONSTRUCTION.APPRVL NEEDED

    Permit
    B01002271
    Type
    Building
    Days from application to issue
    0