Mid-City

651 South Pierce Street is in Mid-City, zoned MU-1 (Medium-intensity mixed use, walkable centers with homes and shops). It is in the Mid-City historic district under partial HDLC control, where demolition needs HDLC review. The city has 9 permits on record here; the most recent, a construction loop permit, was filed in August 2022. 3 are still open. A demolition permit was filed in October 2018. There is 1 open code enforcement case. On this block in the past year: 11 requests to 311 and 37 calls to police.

Zoning
MU-1
Historic district
Mid-City (Partial control)
National Register
Mid-City Historic District
Council district
A
Ward
3
Lot size
10,730 sq ft
Parcel
41033146

Everything on record here

14 records, newest first · 4 open

  1. Permit Construction Loop Permit Finaled

    electrical services for construction, temporary and emergency lighting only does not include build outs

    Permit
    22-24906-LOOP
    Type
    Construction Loop
    Work
    Construction Loop
    Estimated cost (applicant’s figure)
    $50,250
    Fees
    $124
    Contractor
    Kenneth G Verdin
    Days from application to issue
    81
    Expires
    May 7, 2023
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  2. Code enforcement Case 21-05235-MPM Judgment

    A hearing was held on 03/03/2022 with a result of "Guilty".

    1. Inspection
    2. Title Research
    3. Hearing
    4. Judgment
    5. In Compliance
    1. Violation: 160 Weeds and Plant Growth
    2. Violation: 161 Rodent Harborage
    3. Violation: 165 Defacement of Property
    4. Violation: 167 Paint or Protective Treatment
    5. Inspection: Inspection Violation: No WIP
    6. Inspection: Posting of Hearing Notice No Violation
    7. Hearing: Initial Hearing Guilty
  3. Permit Street Cut Other
    Permit
    20-47207-RSTC
    Type
    Street Cut
    Work
    Street Cut
    Estimated cost (applicant’s figure)
    $0
    Fees
    $175
    Days from application to issue
    21
    Expires
    Jun 10, 2021

    See this permit on One Stop

  4. Permit Construction Loop Permit Cancelled

    Temp pole for construction

    Permit
    19-34590-LOOP
    Type
    Construction Loop
    Work
    Construction Loop
    Estimated cost (applicant’s figure)
    $600
    Fees
    $40
    Contractor
    Kenneth G Verdin
    1. Application submitted

    See this permit on One Stop

  5. Permit New Construction Permit Issued

    Construct new commercial strip mall. Shell only. Tenants will fill out their own future permits. Applicant requests SWMP exemption due to impervious surfaces being less the 5,000 SF througn the use of Pervious Concrete for all hard surfaces outside the building envelope. Changed his mind with resubmittal. Etend permit 6 months to 9/10/21. Extend permit (3) 180 days to March 4, 2023.

    Permit
    18-33009-NEWC
    Type
    New Construction
    Work
    New Construction
    Estimated cost (applicant’s figure)
    $541,931
    Fees
    $3,572
    Contractor
    Glenn Snyder
    Days from application to issue
    390
    Expires
    Apr 29, 2020
    1. Application submitted
    2. Application review
    3. Zoning review
    4. Plan review
    5. Permit approved
    6. Issue date
    7. First inspection

    See this permit on One Stop

  6. Permit Demolition Permit Issued

    Demo of existing office

    Permit
    18-32989-DEMO
    Type
    Demolition
    Work
    Demolition
    Estimated cost (applicant’s figure)
    $0
    Fees
    $158
    Days from application to issue
    0
    Expires
    Apr 4, 2019
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date

    See this permit on One Stop

  7. Permit HDLC COA Permit Issued

    Demo of existing office

    Permit
    18-32989-HDLC
    Type
    HDLC COA
    Work
    HDLC COA
    Estimated cost (applicant’s figure)
    $0
    Fees
    $0
    Days from application to issue
    0
    Expires
    Apr 4, 2019

    See this permit on One Stop

  8. Code enforcement Case 15-08463-MPM Closed

    The property was inspected on 09/21/2015 with a finding of "No Violation". The file was subsequently closed.

    1. Inspection: Inspection No Violation

    The city links this case to permit 06BLD-08728.

  9. Code enforcement Case 15-08455-MPM Closed

    The property was inspected on 09/21/2015 with a finding of "Violation: No WIP". The file was subsequently closed.

    1. Inspection: Inspection Violation: No WIP
    2. Violation: 164 Motor Vehicles
  10. Code enforcement Case 15-08447-MPM Closed

    The property was inspected on 09/21/2015 with a finding of "No Violation". The file was subsequently closed.

    1. Inspection: Inspection No Violation

    The city links this case to permit 22-24906-LOOP.

  11. Permit Electrical Repair / Replacement / Addition Permit Finaled

    REMOVE WIRING AND INSTALL 2 CIRCUITS 15-01125-RNVN

    Permit
    15-01918-ERPR
    Type
    Electrical Repair / Replacement / Addition
    Work
    Electrical Repair / Replacement / Addition
    Estimated cost (applicant’s figure)
    $0
    Fees
    $91
    Contractor
    Torriono Neal Kelly
    Days from application to issue
    0
    Expires
    Jul 21, 2015

    See this permit on One Stop

  12. Permit Renovation (Non-Structural) Occupancy

    General repairs to existing office at existing used car lot as per State Fire Marshal - light electrical, construct ramp and other miscellaneous repairs. Permit is extended for 6 months until 01/13/17.

    Permit
    15-01125-RNVN
    Type
    Renovation (Non-Structural)
    Work
    Renovation (Non-Structural)
    Estimated cost (applicant’s figure)
    $2,500
    Fees
    $140
    Contractor
    Torriono Neal Kelly
    Days from application to issue
    0
    Expires
    Jul 13, 2015

    See this permit on One Stop

  13. Code enforcement Case ENVHADJ-2000216 Closed

    A hearing was held on 04/10/2009 with a result of "Found Guilty". The case was subsequently closed.

    1. Inspection: Inspection Complete
    2. Hearing: Initial Hearing Found Guilty

    The city links this case to permit 06BLD-08728.

  14. Permit Demolition Inspection - Completed No Requirements

    Demolition of hurricane damaged single residential unit. Contractor to remove and dispose of all debris within 72 hours and to have a final inspection of the site. A licensed plumber must secure a separate permit from the Sewage and Water Board to cap off sewer lines and remove water meters prior to demolition.651-53 S PIERCE ST

    Permit
    06BLD-08728
    Type
    Demolition
    Work
    Demolition
    Estimated cost (applicant’s figure)
    $30,000
    Fees
    $225
    Days from application to issue
    4