Central Business District
124 Baronne Street is in Central Business District, zoned CBD-2 (Downtown historic buildings and mixed-use streets). The city has 2 permits on record here; the most recent, a renovation (non-structural) permit, was filed in May 2010. 2 are still open. There is 1 open code enforcement case. On this block in the past year: 8 requests to 311 and 56 calls to police.
- Zoning
- CBD-2
- Historic district
- None
- National Register
- Lower Central Business District
- Council district
- B
- Ward
- 3
- Lot size
- 5,717 sq ft
- Parcel
- 41033671
Everything on record here
4 records, newest first · 3 open
-
Code enforcement Case 23-07710-MPM Title Research
The property was inspected on 11/07/2023 with a finding of "Violation: No WIP". The file is now awaiting title research before it can be set for a hearing.
- Inspection
- Title Research
- Hearing
- Judgment
- In Compliance
- Inspection: Inspection Violation: No WIP
- Violation: 165 Defacement of Property
- Violation: 174 Decorative Features
- Inspection: Reinspection Violation: No WIP
- Violation: 165 Defacement of Property
- Violation: 168 Premises Identification
- Violation: 174 Decorative Features
- Violation: 179 Windows
-
Code enforcement Case 23-01752-MPM Closed
The property was inspected on 05/20/2023 with a finding of "No Violation". The file was subsequently closed.
- Inspection: Inspection No Violation
The city links this case to permit 23-24976-SPMA.
-
Permit Renovation (Non-Structural) Electrical Approval - Approved Meter Required
Painting the exterior of building the same existing color.
- Permit
- 10COM-00715
- Type
- Renovation (Non-Structural)
- Work
- NA
- Estimated cost (applicant’s figure)
- $25,000
- Fees
- $185
- Days from application to issue
- 5
-
Permit Electrical Repair / Replacement / Addition Application Acceptance - Approved
REPAIRS
- Permit
- 09ELC-08810
- Type
- Electrical Repair / Replacement / Addition
- Work
- Repair-Replacement-Addition
- Estimated cost (applicant’s figure)
- $0
- Fees
- $30
- Contractor
- Dan Peters Electric
- Days from application to issue
- 10