Central Business District

840 Baronne Street is in Central Business District, zoned CBD-5 (Downtown neighborhood, lower-intensity mixed use around Lafayette Square). It is in the Lafayette Square historic district under full HDLC control, so most exterior changes need approval first. The city has 7 permits on record here; the most recent, an electrical service / circuit / feeder permit, was filed in March 2026. 1 is still open. There was 1 past code enforcement case, the latest in September 2023, all closed. On this block in the past year: 11 requests to 311 and 98 calls to police.

Zoning
CBD-5
Historic district
Lafayette Square (Full control)
National Register
Upper Central Business District
Council district
B
Ward
2
Lot size
8,314 sq ft
Parcel
41034208

Everything on record here

8 records, newest first · 1 open

  1. Permit Electrical Service / Circuit / Feeder Permit Finaled

    Pelican Electrical is requesting a permit to install exit signs and exterior lighting to the property. Pelican will do all work per current code. Thank you.

    Permit
    26-09684-SERV
    Type
    Electrical Service / Circuit / Feeder
    Work
    Electrical Service / Circuit / Feeder
    Estimated cost (applicant’s figure)
    $2,300
    Fees
    $40
    Days from application to issue
    37
    Expires
    Nov 6, 2026
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  2. Permit Change of Address Other

    Owner Initiated. CHANGE 840 Baronne St New Orleans, LA 70113 to 844 Baronne St New Orleans, LA 70113 (AM12527799, 97349572) (Address of Record)

    Permit
    25-25252-ECOA
    Type
    Change of Address
    Work
    Change of Address
    Estimated cost (applicant’s figure)
    $0
    Fees
    $0
    Days from application to issue
    0
    Expires
    Feb 19, 2026
    1. Application submitted
    2. Permit approved
    3. Issue date

    See this permit on One Stop

    Placed here by an address range from “840-844 Baronne St”.

  3. Permit HDLC COA Other

    Installation of additional exterior entrance and exit, installation of exterior lighting for adjacent parking lot, furnishing electrical power for exterior signage, exterior painting, miscellaneous minor interior renovations. **INDOOR AMUSEMENT FACILITY**

    Permit
    24-19766-HDLC
    Type
    HDLC COA
    Work
    HDLC COA
    Estimated cost (applicant’s figure)
    $0
    Fees
    $0
    Days from application to issue
    14
    Expires
    Feb 26, 2025

    See this permit on One Stop

  4. Permit Renovation (Non-Structural) Other

    Installation of additional exterior entrance and exit, installation of exterior lighting for adjacent parking lot, furnishing electrical power for exterior signage, exterior painting, miscellaneous minor interior renovations. **INDOOR AMUSEMENT FACILITY**

    Permit
    24-19766-RNVN
    Type
    Renovation (Non-Structural)
    Work
    Renovation (Non-Structural)
    Estimated cost (applicant’s figure)
    $18,090
    Fees
    $323
    Contractor
    Premier Construction Residential & Commercial, LLC
    Days from application to issue
    415
    Expires
    Mar 10, 2026
    1. Application submitted
    2. Zoning review
    3. Application review
    4. Plan review
    5. Permit approved
    6. Issue date
    7. First inspection

    See this permit on One Stop

  5. Permit HDLC COA Other

    Fabricate and install aluminum constructed front lit channel letters and logo set with acrylic faces as per proposed drawing

    Permit
    24-18855-HDLC
    Type
    HDLC COA
    Work
    HDLC COA
    Estimated cost (applicant’s figure)
    $0
    Fees
    $0
    Days from application to issue
    469
    Expires
    Apr 2, 2026

    See this permit on One Stop

  6. Permit Attached Sign Permit Issued

    Fabricate and install aluminum constructed front lit channel letters and logo set with acrylic faces as per proposed drawing

    Permit
    24-18855-SATT
    Type
    Attached Sign
    Work
    Attached Sign
    Estimated cost (applicant’s figure)
    $0
    Fees
    $318
    Days from application to issue
    481
    Expires
    Apr 13, 2026
    1. Application submitted
    2. Application review
    3. Zoning review
    4. Plan review
    5. Permit approved
    6. Issue date
    7. First inspection

    See this permit on One Stop

  7. Code enforcement Case 23-05327-MPM Closed

    A hearing was held on 10/23/2025 with a result of "Guilty".

    1. Inspection: Inspection Violation: No WIP
    2. Violation: 165 Defacement of Property
    3. Violation: 168 Premises Identification
    4. Violation: 179 Windows
    5. Inspection: Reinspection Violation: No WIP
    6. Inspection: Inspection Violation: No WIP
    7. Inspection: Posting of Hearing Notice Violation: No WIP
    8. Hearing: Initial Hearing Guilty

    The city links this case to permit 25-25252-ECOA.

  8. Permit Street Cut Inspection Phase

    Upgrade systems, provide service

    Permit
    19-23647-RSTC
    Type
    Street Cut
    Work
    Street Cut
    Estimated cost (applicant’s figure)
    $0
    Fees
    $378
    Days from application to issue
    24
    Expires
    Feb 22, 2020