Gert Town

955 South Telemachus Street is in Gert Town, zoned HU-RD1 (Older neighborhoods, two-family homes on smaller lots). The city has 5 permits on record here; the most recent, an electrical service / circuit / feeder permit, was filed in June 2009. 5 are still open. A demolition permit was filed in July 2007. On this block in the past year: 14 requests to 311 and 10 calls to police.

Zoning
HU-RD1
Historic district
None
Council district
B
Ward
2
Lot size
4,779 sq ft
Parcel
41034339

Everything on record here

5 records, newest first · 5 open

  1. Permit Electrical Service / Circuit / Feeder Application Acceptance - Approved

    rewire

    Permit
    09ELC-09882
    Type
    Electrical Service / Circuit / Feeder
    Work
    Service-Circuits-Feeders
    Estimated cost (applicant’s figure)
    $0
    Fees
    $119
    Contractor
    Air Phase Gen Const.
    Days from application to issue
    10
  2. Permit General Mechanical Inspection - Completed

    rll-k-tillery-782-8376-reconnect-1-wh-1-ac-1-waf-ck-1273

    Permit
    09MCH-05618
    Type
    General Mechanical
    Work
    General Mechanical
    Estimated cost (applicant’s figure)
    $0
    Fees
    $120
    Contractor
    Tillery Ref./Ac & Htg.
    Days from application to issue
    5
  3. Permit Construction Loop Application Acceptance - Approved

    contruction loop

    Permit
    08ELC-26327
    Type
    Construction Loop
    Work
    Construction Loop
    Estimated cost (applicant’s figure)
    $0
    Fees
    $30
    Days from application to issue
    10
  4. Permit New Construction Electrical Approval - Approved Meter Required

    Construct a 1992 sq ft 1-story single family dwelling as per plans

    Permit
    08BLD-07244
    Type
    New Construction
    Work
    New
    Estimated cost (applicant’s figure)
    $120,000
    Fees
    $770
    Contractor
    Gene Brian Engineering, Vulcan Investments
    Days from application to issue
    22
  5. Permit Demolition Inspection - Completed

    DEMOLITION OF HURRICANE DAMEAGE SINGLE RESIDENTIAL UNIT. THE CONTRACTOR TO REMOVE AND DISPOSE OF ALL DEBRIS WITHIN 72 HOURS AND HAVE FINAL INSPECTION OF THE SITE. A LICENSED PLUMBER MUST SECURE A SEPARATE PERMIT FROM THE SEWAGE AND WATER BOARD TO CAP OFF SEWER LINES AND REMOVE WATER METER PRIOR TO DEMOLITION.

    Permit
    07BLD-06451
    Type
    Demolition
    Work
    Demolition
    Estimated cost (applicant’s figure)
    $10,212
    Fees
    $130
    Days from application to issue
    23