Mid-City
201 South Cortez Street is in Mid-City, zoned HU-RD2 (Older neighborhoods, two-family homes mixed with single-family homes). It is in the Mid-City historic district under partial HDLC control, where demolition needs HDLC review. The city has 10 permits on record here; the most recent, a sidewalk repair permit, was filed in April 2022. There was 1 past code enforcement case, the latest in June 2016, all closed. On this block in the past year: 31 requests to 311 and 13 calls to police.
- Zoning
- HU-RD2
- Historic district
- Mid-City (Partial control)
- National Register
- Mid-City Historic District
- Council district
- A
- Ward
- 3
- Lot size
- 3,189 sq ft
- Parcel
- 41035349
Everything on record here
11 records, newest first
-
Permit Sidewalk Repair Other
New construction residence is being built, sidewalk is being repaired as needed.
- Permit
- 22-11111-RSWR
- Type
- Sidewalk Repair
- Work
- Sidewalk Repair
- Estimated cost (applicant’s figure)
- $0
- Fees
- $100
- Contractor
- C3NOLA INVESTMENT GROUP LLC
- Days from application to issue
- 37
- Expires
- Nov 20, 2022
-
Permit Mechanical HVAC Permit Finaled
complete installation of 2) 2.5 ac with Air Handlers with 7KW Heat, (Air Handlers in attic). all flex duct, Condensers on sdie of hvac Rham/T2 Equipment
- Permit
- 21-25678-HVAC
- Type
- Mechanical HVAC
- Work
- Mechanical HVAC
- Estimated cost (applicant’s figure)
- $0
- Fees
- $100
- Contractor
- Steven Spiers
- Days from application to issue
- 0
- Expires
- Mar 13, 2022
- Application submitted
- Application review
- Permit approved
- Issue date
- First inspection
-
Permit Mechanical Fuel Gas Permit Finaled
Gas line for Tankless water heater, Gas lamp and fireplace
- Permit
- 21-25026-FGAS
- Type
- Mechanical Fuel Gas
- Work
- Mechanical Fuel Gas
- Estimated cost (applicant’s figure)
- $3,235
- Fees
- $80
- Contractor
- C3NOLA INVESTMENT GROUP LLC
- Days from application to issue
- 1
- Expires
- Feb 26, 2022
- Application submitted
- Application review
- Permit approved
- Issue date
- First inspection
-
Permit Electrical Service / Circuit / Feeder Permit Finaled
New construction. Install electrical service, circuits, feeders.
- Permit
- 21-24121-SERV
- Type
- Electrical Service / Circuit / Feeder
- Work
- Electrical Service / Circuit / Feeder
- Estimated cost (applicant’s figure)
- $18,000
- Fees
- $157
- Contractor
- David P Quatrocci
- Days from application to issue
- 0
- Expires
- Feb 17, 2022
- Application submitted
- Application review
- Permit approved
- Issue date
- First inspection
-
Permit Dumpster/Construction Zone Other
We are seeking authorization to block parking along Cleveland during construction. We are unable to get material deliveries with cars parked here. We attempted to have our lumber package delivered today, unsuccessfully, due to cars being parked here. Building permit 21-0091-NEWC has already been obtained in relation to this single family residence.
- Permit
- 21-16319-RCZD
- Type
- Dumpster/Construction Zone
- Work
- Dumpster/Construction Zone
- Estimated cost (applicant’s figure)
- $0
- Fees
- $870
- Contractor
- C3NOLA INVESTMENT GROUP LLC
- Days from application to issue
- 3
- Expires
- Dec 10, 2021
-
Permit Construction Loop Permit Finaled
Construction loop.
- Permit
- 21-12659-LOOP
- Type
- Construction Loop
- Work
- Construction Loop
- Estimated cost (applicant’s figure)
- $18,214
- Fees
- $40
- Contractor
- David P Quatrocci
- Days from application to issue
- 0
- Expires
- Nov 3, 2021
- Application submitted
- Application review
- Permit approved
- Issue date
- First inspection
-
Permit Accessory Structure Occupancy
A carport to be constructed at the rear of the property, in conjunction with the new construction single residence under permitting (Permit 21-00911-NEWC)
- Permit
- 21-06161-ACCS
- Type
- Accessory Structure
- Work
- Accessory Structure
- Estimated cost (applicant’s figure)
- $11,950
- Fees
- $120
- Days from application to issue
- 46
- Expires
- Oct 19, 2021
- Application submitted
- Application review
- Zoning review
- Plan review
- Permit approved
- Issue date
- First inspection
-
Permit Driveway/ Curb Cut and Restoration Inspection Phase
Curb cut at new construction single family residence for entrance to single car carport.
- Permit
- 21-06080-RDRV
- Type
- Driveway/ Curb Cut and Restoration
- Work
- Driveway/ Curb Cut and Restoration
- Estimated cost (applicant’s figure)
- $0
- Fees
- $100
- Contractor
- C3nola Investment Group LLC
- Days from application to issue
- 15
- Expires
- Sep 19, 2021
-
Permit New Construction Occupancy
New Construction Two (2) Story single residence.
- Permit
- 21-00911-NEWC
- Type
- New Construction
- Work
- New Construction
- Estimated cost (applicant’s figure)
- $386,975
- Fees
- $2,382
- Contractor
- C3nola Investment Group LLC
- Days from application to issue
- 69
- Expires
- Sep 22, 2021
- Application submitted
- Application review
- Zoning review
- Plan review
- Permit approved
- Issue date
- First inspection
-
Code enforcement Case 16-05391-MPM Closed
The property was inspected on 08/08/2016 with a finding of "No Violation". The file was subsequently closed.
- Inspection: Inspection No Violation
The city links this case to permit 22-11111-RSWR.
-
Permit New Construction Other
Construction of a 2520 sq ft 2-story single family residence as per plans.
- Permit
- 16-08138-NEWC
- Type
- New Construction
- Work
- New Construction
- Estimated cost (applicant’s figure)
- $120,000
- Fees
- $780
- Contractor
- Butterbean Development Group LLC, Alex Bruno