Mid-City
648 South Gayoso Street is in Mid-City, zoned MU-2 (High-intensity mixed use, walkable centers with homes, offices and shops). It is in the Mid-City historic district under partial HDLC control, where demolition needs HDLC review. The city has 9 permits on record here; the most recent, a mechanical fuel gas permit, was filed in October 2018. 2 are still open. There were 8 past code enforcement cases, the latest in September 2014, all closed. On this block in the past year: 1 request to 311 and 9 calls to police.
- Zoning
- MU-2
- Historic district
- Mid-City (Partial control)
- National Register
- Mid-City Historic District
- Council district
- B
- Ward
- 3
- Lot size
- 3,368 sq ft
- Parcel
- 41035914
Everything on record here
17 records, newest first · 2 open
-
Permit Mechanical Fuel Gas Permit Finaled
Install a 30 gallon hot water heater
- Permit
- 18-32457-FGAS
- Type
- Mechanical Fuel Gas
- Work
- Mechanical Fuel Gas
- Estimated cost (applicant’s figure)
- $300
- Fees
- $20
- Days from application to issue
- 1
- Expires
- Apr 2, 2019
- Application submitted
- Application review
- Permit approved
- Issue date
- First inspection
-
Permit Mechanical Fuel Gas Permit Finaled
install 60 feet gas line 4 outlets Oscar Holmes
- Permit
- 18-23345-FGAS
- Type
- Mechanical Fuel Gas
- Work
- Mechanical Fuel Gas
- Estimated cost (applicant’s figure)
- $1,500
- Fees
- $15
- Days from application to issue
- 1
- Expires
- Jan 17, 2019
- Application submitted
- Application review
- Permit approved
- Issue date
- First inspection
-
Permit Mechanical HVAC Permit Finaled
Install air handler and condenser Oscar Holmes
- Permit
- 18-22462-HVAC
- Type
- Mechanical HVAC
- Work
- Mechanical HVAC
- Estimated cost (applicant’s figure)
- $2,000
- Fees
- $65
- Days from application to issue
- 10
- Expires
- Jan 16, 2019
- Application submitted
- Application review
- Permit approved
- Issue date
- First inspection
-
Permit Electrical Service / Circuit / Feeder Permit Finaled
Rough - In.
- Permit
- 18-22361-SERV
- Type
- Electrical Service / Circuit / Feeder
- Work
- Electrical Service / Circuit / Feeder
- Estimated cost (applicant’s figure)
- $0
- Fees
- $123
- Contractor
- Juan Jose Arriago-Moreno
- Days from application to issue
- 0
- Expires
- Jan 5, 2019
- Application submitted
- Application review
- Permit approved
- Issue date
- First inspection
-
Permit Construction Loop Permit Finaled
Temp Pole 18-16046
- Permit
- 18-19588-LOOP
- Type
- Construction Loop
- Work
- Construction Loop
- Estimated cost (applicant’s figure)
- $0
- Fees
- $40
- Contractor
- Juan Jose Arriago-Moreno
- Days from application to issue
- 0
- Expires
- Dec 12, 2018
- Application submitted
- Application review
- Permit approved
- Issue date
- First inspection
-
Permit Lead-Based Paint Form Permit Issued
Removal of exterior paint providing containment or using an approved HEPA vacuum system.
- Permit
- 18-16489-LEAD
- Type
- Lead-Based Paint Form
- Work
- Lead-Based Paint Form
- Estimated cost (applicant’s figure)
- $0
- Fees
- $0
- Days from application to issue
- 0
- Expires
- Nov 16, 2018
- Application submitted
- Issue date
-
Permit Change of Address Permit Issued
Convert double to single. Remove: 650 S Gayoso St. Related Permit: 18-16046-RNVN. Keep: 648 S Gayoso St.
- Permit
- 18-16052-ECOA
- Type
- Change of Address
- Work
- Change of Address
- Estimated cost (applicant’s figure)
- $0
- Fees
- $0
- Days from application to issue
- 0
- Expires
- Nov 11, 2018
- Application submitted
- Permit approved
- Issue date
-
Permit Renovation (Non-Structural) Occupancy
Convert 2-family dwelling to a single family as per sketch. Repairs include electrical, plumbing fixtures, A/C, drywall, painting, floors, and cabinets. No demolition of any walls.(648 & 650 S Gayoso St)
- Permit
- 18-16046-RNVN
- Type
- Renovation (Non-Structural)
- Work
- Renovation (Non-Structural)
- Estimated cost (applicant’s figure)
- $35,000
- Fees
- $295
- Days from application to issue
- 12
- Expires
- Nov 23, 2018
- Application submitted
- Application review
- Zoning review
- Plan review
- Permit approved
- Issue date
- First inspection
-
Code enforcement Case 14-07965-MPM Closed
The property was inspected on 10/21/2014 with a finding of "Violation: No WIP". The file was subsequently closed.
- Inspection: Inspection Violation: No WIP
- Violation: 167 Exterior Surfaces
- Violation: 167 Paint or Protective Treatment
- Violation: 168 Premises Identification
- Violation: 174 Decorative Features
- Violation: 176 Stairways
- Violation: 176 Decks Porches and Balconies
-
Permit New Construction Certificate of Occupancy - Issued No Meter
CONSTRUCT NEW FOUNDATION TO RECEIVE RELOCATED SINGLE FAMILY DWELLING AS PER PLANS: FY AVERAGE 6-8FT. FROM 2528 CONTI ST. ADDITIONAL RENOVATIONS REQUIRE A SEPARATE PERMIT.
- Permit
- 11BLD-01273
- Type
- New Construction
- Work
- New
- Estimated cost (applicant’s figure)
- $8,000
- Fees
- $160
- Days from application to issue
- 6
-
Code enforcement Case ENVHADJ-981550 Closed
A hearing was held on 04/10/2009 with a result of "Found Guilty". The case was subsequently closed.
- Inspection: Inspection Complete
- Hearing: Initial Hearing Found Guilty
-
Code enforcement Case ENVHADJ-982060HB Closed
A hearing was held on 04/10/2009 with a result of "Found Guilty". The case was subsequently closed.
- Inspection: Inspection Complete
- Hearing: Initial Hearing Found Guilty
-
Code enforcement Case ENVHADJ-993750HB Closed
A hearing was held on 04/10/2009 with a result of "Found Guilty". The case was subsequently closed.
- Inspection: Inspection Complete
- Hearing: Initial Hearing Found Guilty
-
Code enforcement Case ENVHADJ-2000446EH Closed
A hearing was held on 04/10/2009 with a result of "Found Guilty". The case was subsequently closed.
- Inspection: Inspection Complete
- Hearing: Initial Hearing Found Guilty
-
Code enforcement Case ENVHADJ-20013895PB Closed
A hearing was held on 04/10/2009 with a result of "Found Guilty". The case was subsequently closed.
- Inspection: Inspection Complete
- Hearing: Initial Hearing Found Guilty
-
Code enforcement Case ENVHADJ-20052775PR Closed
A hearing was held on 05/12/2012 but the result of the hearing is still pending.
- Inspection: Inspection Complete
- Hearing: Initial Hearing Result Pending
-
Code enforcement Case ENVHADJ-2007882P Closed
A hearing was held on 04/10/2009 with a result of "Found Guilty". The case was subsequently closed.
- Inspection: Inspection Complete
- Hearing: Initial Hearing Found Guilty