Central City

2031 Second Street is in Central City, zoned HU-RM1 (Older neighborhoods, low-density multi-family housing up to three stories). The city has 12 permits on record here; the most recent, an electrical vacancy permit, was filed in May 2023. 4 are still open. There were 2 past code enforcement cases, the latest in April 2015, all closed. On this block in the past year: 8 requests to 311 and 10 calls to police.

Zoning
HU-RM1
Historic district
None
National Register
Central City Historic District
Council district
B
Ward
11
Lot size
3,320 sq ft
Parcel
41037946

Everything on record here

14 records, newest first · 4 open

  1. Permit Electrical Vacancy Permit Cancelled

    Permit department requested a open permit. Intial permit had expired and client not able to get hold of initial electrician.

    Permit
    23-13700-EVAC
    Type
    Electrical Vacancy
    Work
    Electrical Vacancy
    Estimated cost (applicant’s figure)
    $100
    Fees
    $40
    Contractor
    WILLIAM HOWARD MERCIER, JR.
    1. Application submitted
    2. Application review

    See this permit on One Stop

  2. Permit Mechanical HVAC Permit Finaled

    Install (1) 1.5 Ton Complete Ameristar Electric Systems. Install (1) 2.5 Complete Ameristar Electric Systems.

    Permit
    22-04081-HVAC
    Type
    Mechanical HVAC
    Work
    Mechanical HVAC
    Estimated cost (applicant’s figure)
    $11,500
    Fees
    $100
    Days from application to issue
    8
    Expires
    Aug 18, 2022
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  3. Permit Electrical Service / Circuit / Feeder Permit Finaled

    200A, 13 circuits

    Permit
    22-04183-SERV
    Type
    Electrical Service / Circuit / Feeder
    Work
    Electrical Service / Circuit / Feeder
    Estimated cost (applicant’s figure)
    $4,200
    Fees
    $139
    Contractor
    Elbred Malone Jr.
    Days from application to issue
    6
    Expires
    Aug 16, 2022
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  4. Permit Construction Loop Permit Finaled

    Construction loop

    Permit
    21-29294-LOOP
    Type
    Construction Loop
    Work
    Construction Loop
    Estimated cost (applicant’s figure)
    $400
    Fees
    $40
    Contractor
    WILLIAM HOWARD MERCIER, JR.
    Days from application to issue
    2
    Expires
    Apr 22, 2022
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  5. Permit Dumpster/Construction Zone Permit Finaled

    Dumpster for Interior demolition and siding associated with Permit #ZP4WSN. There is no driveway so the Dumpster will be in the street. What is the maximum size dumpster allowed for that location?

    Permit
    21-26825-RCZD
    Type
    Dumpster/Construction Zone
    Work
    Dumpster/Construction Zone
    Estimated cost (applicant’s figure)
    $0
    Fees
    $490
    Contractor
    Choice Home Team Inc
    Days from application to issue
    21
    Expires
    Apr 15, 2022

    See this permit on One Stop

  6. Permit Renovation (Non-Structural) Permit Issued

    Scope of work: Electrical, plumbing hvac, flooring, insulation, painting, sheetrock, siding, cabinets and countertop, doors and carpentry

    Permit
    21-16681-RNVN
    Type
    Renovation (Non-Structural)
    Estimated cost (applicant’s figure)
    $100,534
    Fees
    $565
    Days from application to issue
    107
  7. Permit Renovation (Structural) Occupancy

    Scope of work: Electrical, plumbing hvac, flooring, insulation, painting, sheetrock, siding, cabinets and countertop, doors and carpentry Extend (3) 180 day periods to December 7, 2023.

    Permit
    21-16681-RNVS
    Type
    Renovation (Structural)
    Work
    Renovation (Structural)
    Estimated cost (applicant’s figure)
    $100,534
    Fees
    $861
    Contractor
    Choice Home Team Inc
    Days from application to issue
    107
    Expires
    Mar 24, 2022
    1. Application submitted
    2. Application review
    3. Zoning review
    4. Plan review
    5. Permit approved
    6. Issue date
    7. First inspection

    See this permit on One Stop

  8. Permit Construction Loop Permit Finaled

    Install electrical temporary pole (construction loop)

    Permit
    18-33241-LOOP
    Type
    Construction Loop
    Work
    Construction Loop
    Estimated cost (applicant’s figure)
    $250
    Fees
    $40
    Contractor
    Neil Charles Verges
    Days from application to issue
    9
    Expires
    Apr 16, 2019
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  9. Permit Renovation (Non-Structural) Other

    Upgrade plumbing, electrical, and HVAC. Drywall, paint, and flooring.

    Permit
    18-00938-RNVN
    Type
    Renovation (Non-Structural)
    Work
    Renovation (Non-Structural)
    Estimated cost (applicant’s figure)
    $25,000
    Fees
    $245
    Days from application to issue
    38
    Expires
    Aug 16, 2018
    1. Application submitted
    2. Application review
    3. Zoning review
    4. Plan review
    5. Permit approved
    6. Issue date

    See this permit on One Stop

  10. Code enforcement Case 15-03186-MPM Closed

    The case was filed on 04/27/2015 but has since been closed without further action.

    The city links this case to permit 23-13700-EVAC.

  11. Code enforcement Case 13-08474-MPM Closed

    A hearing was held on 07/13/2015 with a result of "Guilty".

    1. Inspection: Inspection Violation: No WIP
    2. Violation: 160 Weeds and Plant Growth
    3. Violation: 167 Exterior Surfaces
    4. Violation: 167 Paint or Protective Treatment
    5. Violation: 174 Decorative Features
    6. Inspection: Posting of Hearing Notice Violation: WIP
    7. Hearing: Initial Hearing Reset: Work In Progress
    8. Inspection: Reinspection Violation: No WIP
    9. Hearing: Reset Hearing Guilty
    10. Inspection: Posting of Judgment Violation: WIP

    The city links this case to permit 23-13700-EVAC.

  12. Permit Electrical Permit Issuance Active

    TEMP POLE ( 10BLD-01636)

    Permit
    11ELC-11115
    Type
    Electrical
    Work
    Construction Loop
    Estimated cost (applicant’s figure)
    $0
    Fees
    $40
  13. Permit Change of Use Application Acceptance - Approved No Review

    Converting a double into a single,(1) meter and kitchen to remain. Electrical,Hvac,Plumbing;Sheetrocking;Painting and others to make livable.

    Permit
    10BLD-01636
    Type
    Change of Use
    Work
    Change of Use
    Estimated cost (applicant’s figure)
    $25,000
    Fees
    $185
    Days from application to issue
    5
  14. Permit Electrical Service / Circuit / Feeder Application Acceptance - Approved

    REWIRE

    Permit
    08ELC-18336
    Type
    Electrical Service / Circuit / Feeder
    Work
    Service-Circuits-Feeders
    Estimated cost (applicant’s figure)
    $0
    Fees
    $77
    Contractor
    Herman L. Mcclain Jr.
    Days from application to issue
    10