2023 Jackson Avenue is in Central City, zoned HU-RM1 (Older neighborhoods, low-density multi-family housing up to three stories). The city has 6 permits on record here; the most recent, an electrical vacancy permit, was filed in August 2022. 3 are still open. There is 1 open code enforcement case. On this block in the past year: 12 requests to 311 and 68 calls to police.

Zoning
HU-RM1
Historic district
None
National Register
Central City Historic District
Council district
B
Ward
10
Lot size
2,980 sq ft
Parcel
41038660

Everything on record here

12 records, newest first · 4 open

  1. Code enforcement Case 26-01859-MPM Hearing

    The file has been researched and is awaiting Quality Assurance review before being set for a hearing.

    1. Inspection
    2. Title Research
    3. Hearing
    4. Judgment
    5. In Compliance
    1. Inspection: Inspection Violation: No WIP
    2. Violation: 178 Handrails and Guardrails

    The city links this case to permit 22-23002-RNVN.

  2. Permit Electrical Vacancy Permit Finaled

    Electrical Vacancy

    Permit
    22-25667-EVAC
    Type
    Electrical Vacancy
    Work
    Electrical Vacancy
    Estimated cost (applicant’s figure)
    $450
    Fees
    $40
    Contractor
    Troy Anthony Kelley
    Days from application to issue
    36
    Expires
    Mar 29, 2023
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  3. Permit Renovation (Non-Structural) Permit Issued

    The Scope of Work for kitchen upgrade; install custom cabinets with accessories; install countertops and backsplash; installing flooring. Remodel of bathroom (vanity, Toilet, sink, Bathroom Fan, Shower etc.) Permit extended (2) 180 day periods to March 17, 2027

    Permit
    22-23002-RNVN
    Type
    Renovation (Non-Structural)
    Work
    Renovation (Non-Structural)
    Estimated cost (applicant’s figure)
    $12,400
    Fees
    $315
    Days from application to issue
    57
    Expires
    Mar 27, 2023
    1. Application submitted
    2. Zoning review
    3. Application review
    4. Plan review
    5. Permit approved
    6. Issue date

    See this permit on One Stop

  4. Permit Electrical Repair / Replacement / Addition Permit Finaled

    Install stem due to Ida replace service head install ground wire

    Permit
    21-29143-ERPR
    Type
    Electrical Repair / Replacement / Addition
    Work
    Electrical Repair / Replacement / Addition
    Estimated cost (applicant’s figure)
    $450
    Fees
    $40
    Contractor
    Troy Anthony Kelley
    Days from application to issue
    8
    Expires
    Apr 26, 2022
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  5. Permit Renovation (Non-Structural) Occupancy

    Bath and Kitchen renovation and painting. Extend permit (2) 180 day periods to November 3, 2022.

    Permit
    21-11074-RNVN
    Type
    Renovation (Non-Structural)
    Work
    Renovation (Non-Structural)
    Estimated cost (applicant’s figure)
    $7,000
    Fees
    $225
    Days from application to issue
    23
    Expires
    Nov 12, 2021
    1. Application submitted
    2. Application review
    3. Zoning review
    4. Plan review
    5. Permit approved
    6. Issue date
    7. First inspection

    See this permit on One Stop

  6. Code enforcement Case 14-10865-MPM Closed

    A hearing was held on 03/09/2015 with a result of "Guilty".

    1. Inspection: Inspection Violation: No WIP
    2. Violation: 163 Fences and Walls
    3. Violation: 167 Siding and Masonry
    4. Violation: 169 Studs
    5. Violation: 174 Decorative Features
    6. Inspection: Posting of Hearing Notice Violation: No WIP
    7. Hearing: Initial Hearing Reset: Work In Progress
    8. Inspection: Reinspection Violation: No WIP
    9. Hearing: Reset Hearing Guilty

    The city links this case to permit 22-23002-RNVN.

  7. Code enforcement Case ENVHADJ-20012915EH Closed

    A hearing was held on 04/10/2009 with a result of "Dismissed". The case was subsequently closed.

    1. Inspection: Inspection Complete
    2. Hearing: Initial Hearing Dismissed

    The city links this case to permit 22-25667-EVAC.

  8. Code enforcement Case ENVHADJ-20015053EH Closed

    A hearing was held on 04/10/2009 with a result of "Found Guilty". The case was subsequently closed.

    1. Inspection: Inspection Complete
    2. Hearing: Initial Hearing Found Guilty

    The city links this case to permit 22-25667-EVAC.

  9. Code enforcement Case ENVHADJ-20045297EH Closed

    A hearing was held on 04/10/2009 with a result of "Found Guilty". The case was subsequently closed.

    1. Inspection: Inspection Complete
    2. Hearing: Initial Hearing Found Guilty

    The city links this case to permit 22-25667-EVAC.

  10. Code enforcement Case ENVHADJ-953876 Closed

    A hearing was held on 04/10/2009 with a result of "Found Guilty". The case was subsequently closed.

    1. Inspection: Inspection Complete
    2. Hearing: Initial Hearing Found Guilty

    The city links this case to permit 22-25667-EVAC.

  11. Permit Electrical Service / Circuit / Feeder Application Acceptance - Approved

    REPAIRS

    Permit
    07ELC-33762
    Type
    Electrical Service / Circuit / Feeder
    Work
    Service-Circuits-Feeders
    Estimated cost (applicant’s figure)
    $0
    Fees
    $60
    Contractor
    Charles Pierson Electric
    Days from application to issue
    10
  12. Permit Emergency Permit Application Acceptance - Approved No Review

    KATRINA REPAIRS TO INC: SHEETROCK, ELEC, FLOORING, CABINETS, REP ROOF, AND OTHER HURRICANE REPAIRS.

    Permit
    06BLD-12327
    Type
    Emergency Permit
    Work
    Emergency Permit
    Estimated cost (applicant’s figure)
    $30,000
    Fees
    $200
    Days from application to issue
    5