Central City

2714 Danneel Street is in Central City, zoned HU-RM1 (Older neighborhoods, low-density multi-family housing up to three stories). The city has 5 permits on record here; the most recent, an electrical service / circuit / feeder permit, was filed in February 2009. 5 are still open. A demolition permit was filed in November 2008. There were 2 past code enforcement cases, the latest in April 2009, all closed. On this block in the past year: 2 requests to 311 and 2 calls to police.

Zoning
HU-RM1
Historic district
None
National Register
Central City Historic District
Council district
B
Ward
11
Lot size
1,933 sq ft
Parcel
41039050

Everything on record here

7 records, newest first · 5 open

  1. Code enforcement Case ENVHADJ-991920HB Closed

    The property was inspected on 12/14/1998 with a finding of "Complete". The file was subsequently closed.

    1. Inspection: Inspection Complete

    The city links this case to permit 09ELC-03449.

  2. Code enforcement Case ENVHADJ-20023357HB Closed

    The property was inspected on 03/26/2002 with a finding of "Complete". The file was subsequently closed.

    1. Inspection: Inspection Complete

    The city links this case to permit 09ELC-03449.

  3. Permit Electrical Service / Circuit / Feeder Application Acceptance - Approved

    MODULAR- PICTURES OF INSIDE PANEL PROVIDED AT TIME OF FILING. SEE ATTACHED.

    Permit
    09ELC-03449
    Type
    Electrical Service / Circuit / Feeder
    Work
    Service-Circuits-Feeders
    Estimated cost (applicant’s figure)
    $0
    Fees
    $93
    Contractor
    Jahangir Z Salmassi
    Days from application to issue
    10
  4. Permit New Construction Inspection - Completed

    ERECT A 1-STORY MODULAR SINGLE FAMILY DWELLING AS PER PLANS AND BZA DKT #276-08.

    Permit
    08BLD-08480
    Type
    New Construction
    Estimated cost (applicant’s figure)
    $120,000
    Fees
    $960
  5. Permit Demolition Application Acceptance - Approved No Review

    DEMOLISH TWO FAMILY HOUSE TO GRADE. CONTRACTOR SHALL REMOVE AND DISPOSE OF ALL DEBRIS WITHIN 72 HOURS OF COMPLETION. PROOF OF DISPOSAL REQUIRED AT TIME OF FINAL INSPECTION. SEPARATE PERMIT REQUIRED FROM SEWERAGE AND WATER BOARD TO CAP SEWER LINES AND REMOVE WATER METERS. NCDC APPROVED WORK ORDER 1605.

    Permit
    08BLD-07864
    Type
    Demolition
    Work
    Demolition
    Estimated cost (applicant’s figure)
    $10,000
    Fees
    $125
    Contractor
    Drc Emergency Servces,Llc, Drc Emergency Servces,Llc
    Days from application to issue
    5
  6. Permit Demolition Application Acceptance - Approved No Review

    Demolition.All permits issued for demolition require the contractor to remove and dispose of all debris within 72 hours and to have a final inspection of the site. Proof of proper disposal of the debris required at the time of final inspection. (Weigh tickets or invoice from an approved landfill will meet this requirement.) It is unlawful to leave debris, Section 103.20.2; City of New Orleans IBC Building Code)

    Permit
    08BLD-06979
    Type
    Demolition
    Work
    Demolition
    Estimated cost (applicant’s figure)
    $2,500
    Fees
    $90
    Days from application to issue
    5
  7. Permit Residential APPROVAL

    repai plumbing; rewire electrical; remove replace drywall all damaged by hurricanes

    Permit
    ACCELA-2595
    Type
    Residential
    Work
    Repair
    Estimated cost (applicant’s figure)