Central City
2431 Philip Street is in Central City, zoned HU-RD2 (Older neighborhoods, two-family homes mixed with single-family homes). The city has 2 permits on record here; the most recent, a demolition permit, was filed in August 2023. 1 is still open. A demolition permit was filed in October 2023. There are 3 open code enforcement cases. On this block in the past year: 5 requests to 311 and 8 calls to police.
- Zoning
- HU-RD2
- Historic district
- None
- National Register
- Central City Historic District
- Council district
- B
- Ward
- 10
- Lot size
- 2,714 sq ft
- Parcel
- 41039155
Everything on record here
10 records, newest first · 4 open
-
Code enforcement Case 25-05642-MPM Closed
The case was filed on 05/16/2025 but has since been closed without further action.
The city links this case to permit 23-21599-DEMO.
-
Code enforcement Case 25-05640-MPM Judgment
A hearing was held on 10/23/2025 with a result of "Guilty: Abated".
- Inspection
- Title Research
- Hearing
- Judgment
- In Compliance
- Inspection: Inspection Violation: No WIP
- Violation: 157 Sanitation
- Violation: 160 Weeds and Plant Growth
- Inspection: Posting of Hearing Notice Violation: WIP
- Hearing: Initial Hearing Guilty: Abated
The city links this case to permit 23-21599-DEMO.
-
Permit Demolition Permit Finaled
Strategic Demolition issued by City of New Orleans
- Permit
- 23-21599-DEMO
- Type
- Demolition
- Work
- Demolition
- Estimated cost (applicant’s figure)
- $0
- Fees
- $145
- Contractor
- Durr Heavy Construction, LLC
- Days from application to issue
- 65
- Expires
- Apr 11, 2024
- Application submitted
- Application review
- Permit approved
- Issue date
- First inspection
-
Code enforcement Case 22-06605-MPM Closed
The case was filed on 11/09/2022 but has since been closed without further action.
The city links this case to permit 23-21599-DEMO.
-
Code enforcement Case 22-00554-MPM Judgment
A hearing was held on 02/14/2023 with a result of "Guilty".
- Inspection
- Title Research
- Hearing
- Judgment
- In Compliance
- Inspection: Inspection Violation: No WIP
- Violation: 157 Sanitation
- Violation: 159 Driveways
- Violation: 159 Sidewalks
- Violation: 160 Weeds and Plant Growth
- Violation: 161 Rodent Harborage
- Violation: 167 Exterior Surfaces
- Violation: 167 Paint or Protective Treatment
- Violation: 169 Structure
- Violation: 171 Weatherboards
- Violation: 171 Exterior Walls
- Violation: 172 Roofs
- Violation: 174 Decorative Features
- Inspection: Posting of Hearing Notice Violation: No WIP
- Hearing: Initial Hearing Guilty
- Inspection: Posting of Notice of Daily Fines Hearing Violation: No WIP
- Hearing: Reset Hearing Guilty
The city links this case to permit 23-21599-DEMO.
-
Code enforcement Case 20-22824-MPM Closed
The case was filed on 11/18/2020 but has since been closed without further action.
The city links this case to permit 23-21599-DEMO.
-
Permit Renovation (Structural) Permit Issued
Roof repairs, install 2 doors, paint, repair sills, repair exterior walls and windows, etc as per estimate.
- Permit
- 16-36656-RNVS
- Type
- Renovation (Structural)
- Work
- Renovation (Structural)
- Estimated cost (applicant’s figure)
- $28,000
- Fees
- $200
- Contractor
- Big Herc Electric LLC
- Days from application to issue
- 25
- Expires
- May 28, 2017
-
Code enforcement Case 16-08202-MPM Judgment
A hearing was held on 12/12/2016 with a result of "Guilty".
- Inspection
- Title Research
- Hearing
- Judgment
- In Compliance
- Inspection: Inspection Violation: No WIP
- Violation: 157 Sanitation
- Violation: 160 Weeds and Plant Growth
- Violation: 167 Paint or Protective Treatment
- Violation: 169 Upright Boards/Framing
- Violation: 169 Studs
- Violation: 170 Foundation
- Violation: 171 Exterior Walls
- Violation: 171 Weatherboards
- Violation: 172 Gutters and Downspouts
- Violation: 172 Roofs
- Violation: 179 Windows
- Violation: 181 Doors
- Hearing: Initial Hearing Reset: Not Re-Inspected
- Inspection: Reinspection Violation: No WIP
- Hearing: Reset Hearing Guilty
- Inspection: Posting of Judgment Violation: No WIP
The city links this case to permit 23-21599-DEMO.
-
Code enforcement Case 16-04369-MPM Closed
The case was filed on 05/25/2016 but has since been closed without further action.
-
Code enforcement Case 15-01245-MPM Closed
The property was inspected on 02/25/2015 with a finding of "Violation: No WIP". The file was subsequently closed.
- Inspection: Inspection Violation: No WIP
- Violation: 167 Exterior Surfaces
- Violation: 167 Paint or Protective Treatment
- Violation: 169 Studs
- Violation: 169 Structure
- Violation: 169 Upright Boards/Framing
- Violation: 170 Foundation
- Violation: 171 Exterior Walls
- Violation: 171 Weatherboards
- Violation: 172 Gutters and Downspouts
- Violation: 172 Roofs
- Violation: 174 Decorative Features
- Violation: 179 Windows
- Violation: 181 Doors
The city links this case to permit 23-21599-DEMO.