Central City
2319 Josephine Street is in Central City, zoned HU-RD2 (Older neighborhoods, two-family homes mixed with single-family homes). The city has 7 permits on record here; the most recent, an electrical service / circuit / feeder permit, was filed in September 2022. 1 is still open. There are 2 open code enforcement cases. On this block in the past year: 0 requests to 311 and 2 calls to police.
- Zoning
- HU-RD2
- Historic district
- None
- National Register
- Central City Historic District
- Council district
- B
- Ward
- 10
- Lot size
- 2,582 sq ft
- Parcel
- 41039781
Everything on record here
11 records, newest first · 3 open
-
Permit Electrical Service / Circuit / Feeder Permit Issued
Renovation, take over electrical Rough-In and OK to close wall inspection completed by others permit, E-1 to trim out, build service, Final job
- Permit
- 22-27128-SERV
- Type
- Electrical Service / Circuit / Feeder
- Work
- Electrical Service / Circuit / Feeder
- Estimated cost (applicant’s figure)
- $3,500
- Fees
- $130
- Contractor
- Eugene J Lawrence Jr.
- Days from application to issue
- 23
- Expires
- Apr 5, 2023
- Application submitted
- Application review
- Permit approved
- Issue date
- First inspection
-
Permit Mechanical HVAC Permit Finaled
INSTALL A NEW 3 TON GAS INDOOR AND OUTDOOR UNIT.
- Permit
- 22-26797-HVAC
- Type
- Mechanical HVAC
- Work
- Mechanical HVAC
- Estimated cost (applicant’s figure)
- $6,000
- Fees
- $65
- Days from application to issue
- 3
- Expires
- Mar 9, 2023
- Application submitted
- Application review
- Permit approved
- Issue date
- First inspection
-
Permit Mechanical Fuel Gas Permit Finaled
INSTALL NEW GAS LINE 4 OUTLETS AND 40 GALLON GAS WATER HEATER.
- Permit
- 22-26796-FGAS
- Type
- Mechanical Fuel Gas
- Work
- Mechanical Fuel Gas
- Estimated cost (applicant’s figure)
- $3,000
- Fees
- $35
- Days from application to issue
- 3
- Expires
- Mar 9, 2023
- Application submitted
- Application review
- Permit approved
- Issue date
- First inspection
-
Permit Electrical Service / Circuit / Feeder Permit Issued
install 150 amp with 15 circuit
- Permit
- 22-08809-SERV
- Type
- Electrical Service / Circuit / Feeder
- Work
- Electrical Service / Circuit / Feeder
- Estimated cost (applicant’s figure)
- $4,898
- Fees
- $780
- Contractor
- Dean Walters
- Days from application to issue
- 76
- Expires
- Dec 8, 2022
- Application submitted
- Application review
- Permit approved
- Issue date
- First inspection
-
Permit Mechanical HVAC Permit Cancelled
install 3 ton system gas
- Permit
- 22-08808-HVAC
- Type
- Mechanical HVAC
- Work
- Mechanical HVAC
- Estimated cost (applicant’s figure)
- $6,345
- Fees
- $65
- Application submitted
-
Permit Mechanical Fuel Gas Permit Cancelled
install new gas line to supply stove dryer,furnace,water heater and will install 30 gallon water heater gas
- Permit
- 22-08806-FGAS
- Type
- Mechanical Fuel Gas
- Work
- Mechanical Fuel Gas
- Estimated cost (applicant’s figure)
- $2,758
- Fees
- $35
- Application submitted
-
Permit Renovation (Non-Structural) Permit Issued
Interior renovations, plumbing, electrical and air conditioning repairs, sheetrock repairs, painting, new kitchen cabinets, new finished flooring, new interior and exterior door.
- Permit
- 21-21461-RNVN
- Type
- Renovation (Non-Structural)
- Work
- Renovation (Non-Structural)
- Estimated cost (applicant’s figure)
- $33,000
- Fees
- $675
- Contractor
- A-Cubed Corporation
- Days from application to issue
- 228
- Expires
- Sep 11, 2022
- Application submitted
- Application review
- Zoning review
- Plan review
- Permit approved
- Issue date
- First inspection
-
Code enforcement Case 20-23214-MPM Closed
The property was inspected on 12/27/2020 with a finding of "Violation: No WIP". The file was subsequently closed.
- Inspection: Inspection Violation: No WIP
- Violation: 157 Sanitation
- Violation: 160 Weeds and Plant Growth
- Violation: 161 Rodent Harborage
- Violation: 163 Fences and Walls
- Violation: 167 Paint or Protective Treatment
- Inspection: Inspection No Violation
-
Code enforcement Case 19-09925-MPM Judgment
A hearing was held on 12/03/2019 with a result of "Guilty".
- Inspection
- Title Research
- Hearing
- Judgment
- In Compliance
- Inspection: Inspection Violation: No WIP
- Violation: 157 Sanitation
- Violation: 160 Weeds and Plant Growth
- Violation: 161 Rodent Harborage
- Violation: 167 Exterior Surfaces
- Violation: 167 Paint or Protective Treatment
- Violation: 167 Metal Surfaces
- Violation: 172 Roofs
- Violation: 179 Windows
- Violation: 181 Doors
- Inspection: Posting of Hearing Notice Violation: No WIP
- Hearing: Initial Hearing Guilty
- Inspection: Posting of Judgment No Violation
-
Code enforcement Case 16-00823-MPM Judgment
A hearing was held on 05/16/2017 with a result of "Guilty".
- Inspection
- Title Research
- Hearing
- Judgment
- In Compliance
- Inspection: Inspection Violation: No WIP
- Violation: 160 Weeds and Plant Growth
- Violation: 167 Paint or Protective Treatment
- Violation: 167 Siding and Masonry
- Violation: 168 Premises Identification
- Violation: 172 Gutters and Downspouts
- Violation: 172 Roofs
- Violation: 174 Decorative Features
- Inspection: Posting of Hearing Notice Violation: No WIP
- Hearing: Initial Hearing Guilty
- Inspection: Posting of Judgment Violation: No WIP
-
Code enforcement Case 15-05434-MPM Closed
The property was inspected on 06/18/2015 with a finding of "Violation: No WIP". The file was subsequently closed.
- Inspection: Inspection Violation: No WIP
- Violation: 160 Weeds and Plant Growth
- Violation: 167 Exterior Surfaces
- Violation: 167 Siding and Masonry
- Violation: 168 Premises Identification
- Violation: 172 Roofs
- Violation: 179 Windows
The city links this case to permit 22-27128-SERV.