Central City

3026 First Street is in Central City, zoned HU-MU (Older neighborhoods, walkable mix of shops with homes above). The city has 2 permits on record here; the most recent, a demolition permit, was filed in April 2008. 2 are still open. A demolition permit was filed in May 2008. There were 3 past code enforcement cases, the latest in January 2015, all closed. On this block in the past year: 12 requests to 311 and 15 calls to police.

Zoning
HU-MU
Historic district
None
Council district
B
Ward
11
Lot size
2,113 sq ft
Parcel
41039833

Everything on record here

5 records, newest first · 2 open

  1. Code enforcement Case 15-00514-MPM Closed

    A hearing was held on 05/19/2016 with a result of "Dismissed Wrong Location". The case was subsequently closed.

    1. Violation: 157 Sanitation
    2. Violation: 167 Exterior Surfaces
    3. Violation: 167 Paint or Protective Treatment
    4. Violation: 169 Rafters
    5. Violation: 174 Decorative Features
    6. Violation: 176 Stairways
    7. Violation: 181 Doors
    8. Inspection: Inspection Violation: No WIP
    9. Hearing: Initial Hearing Dismissed Wrong Location

    The city links this case to permit 08BLD-03087.

  2. Code enforcement Case ENVHADJ-20041723EH Closed

    A hearing was held on 04/10/2009 with a result of "Found Guilty". The case was subsequently closed.

    1. Inspection: Inspection Complete
    2. Hearing: Initial Hearing Found Guilty

    The city links this case to permit 08BLD-03087.

  3. Code enforcement Case ENVHADJ-20043662EH Closed

    A hearing was held on 04/10/2009 with a result of "Found Guilty". The case was subsequently closed.

    1. Inspection: Inspection Complete
    2. Hearing: Initial Hearing Found Guilty

    The city links this case to permit 08BLD-03087.

  4. Permit Demolition Application Acceptance - Approved No Review

    DEMOLISH SINGLE FAMILY HOUSE TO GRADE. (HOUSE IS IN INNIMENT DANGER OF COLLASPE PER JOHNNY ODOM). CONTRACTOR SHALL REMOVE AND DISPOSE OF ALL DEBRIS WITHIN 72 HOURS OF COMPLETION. PROOF OF DISPOSAL REQUIRED AT TIME OF FINAL INSPECTION. SEPARATE PERMIT REQUIRED FROM SEWAGE AND WATER BOARD TO CAP SEWER LINES AND REMOVE WATER METERS.

    Permit
    08BLD-03087
    Type
    Demolition
    Work
    Demolition
    Estimated cost (applicant’s figure)
    $2,200
    Fees
    $90
    Days from application to issue
    5
  5. Permit Electrical Repair / Replacement / Addition Application Acceptance - Approved

    RECONNECT

    Permit
    06ELC-22988
    Type
    Electrical Repair / Replacement / Addition
    Work
    Repair-Replacement-Addition
    Estimated cost (applicant’s figure)
    $0
    Fees
    $30
    Contractor
    La-Mac Electric
    Days from application to issue
    10