Central City
3818 Second Street is in Central City, zoned HU-RD2 (Older neighborhoods, two-family homes mixed with single-family homes). The city has 4 permits on record here; the most recent, a mechanical HVAC permit, was filed in June 2015. 1 is still open. A demolition permit was filed in October 2006. There were 2 past code enforcement cases, the latest in April 2009, all closed. On this block in the past year: 1 request to 311 and 1 call to police.
- Zoning
- HU-RD2
- Historic district
- None
- Council district
- B
- Ward
- 11
- Lot size
- 4,014 sq ft
- Parcel
- 41040052
Everything on record here
6 records, newest first · 1 open
-
Permit Mechanical HVAC Permit Finaled
rll-p-toye-840-9961-1-ac-1-elec-waf-ck-12307
- Permit
- 15-17625-HVAC
- Type
- Mechanical HVAC
- Work
- Mechanical HVAC
- Estimated cost (applicant’s figure)
- $0
- Fees
- $65
- Contractor
- Paul Toye
- Days from application to issue
- 5
- Expires
- Dec 16, 2015
-
Permit Electrical Service / Circuit / Feeder Permit Issued
modular home 15-11221-NEWC
- Permit
- 15-16638-SERV
- Type
- Electrical Service / Circuit / Feeder
- Work
- Electrical Service / Circuit / Feeder
- Estimated cost (applicant’s figure)
- $0
- Fees
- $103
- Contractor
- Micah John Matherne
- Days from application to issue
- 20
- Expires
- Dec 23, 2015
-
Permit New Construction Occupancy
New 1040 sf modular home as per plans. Electrical, framing, hvac, roofing; windows and trim.
- Permit
- 15-11221-NEWC
- Type
- New Construction
- Work
- New Construction
- Estimated cost (applicant’s figure)
- $92,245
- Fees
- $618
- Contractor
- Nationwide Housing Systems Lp, Jerry Helms
- Days from application to issue
- 14
- Expires
- Oct 29, 2015
-
Code enforcement Case ENVHADJ-20041519SN Closed
A hearing was held on 04/10/2009 with a result of "Found Guilty". The case was subsequently closed.
- Inspection: Inspection Complete
- Hearing: Initial Hearing Found Guilty
The city links this case to permit 15-17625-HVAC.
-
Code enforcement Case ENVHADJ-2004420SN Closed
A hearing was held on 04/10/2009 with a result of "Found Guilty". The case was subsequently closed.
- Inspection: Inspection Complete
- Hearing: Initial Hearing Found Guilty
The city links this case to permit 15-17625-HVAC.
-
Permit Demolition Certificate of Occupancy - Issued No Meter
Demolish Structure to grade. All permits issued for demolition require the Contractor to remove and dispose of all debris within 72 hours and to have a final inspection of the site. Proof of proper disposal of the debris required at the time of final inspection.
- Permit
- 06BLD-10273
- Type
- Demolition
- Work
- Demolition
- Estimated cost (applicant’s figure)
- $10,000
- Fees
- $125