Central City
2609 Fourth Street is in Central City, zoned HU-RD2 (Older neighborhoods, two-family homes mixed with single-family homes). The city has 10 permits on record here; the most recent, a mechanical fuel gas permit, was filed in June 2022. 1 is still open. There were 3 past code enforcement cases, the latest in September 2013, all closed. On this block in the past year: 1 request to 311 and 5 calls to police.
- Zoning
- HU-RD2
- Historic district
- None
- National Register
- Central City Historic District
- Council district
- B
- Ward
- 11
- Lot size
- 2,369 sq ft
- Parcel
- 41040221
Everything on record here
13 records, newest first · 1 open
-
Permit Mechanical Fuel Gas Permit Finaled
New gas lines and gas tankless water heater
- Permit
- 22-18263-FGAS
- Type
- Mechanical Fuel Gas
- Work
- Mechanical Fuel Gas
- Estimated cost (applicant’s figure)
- $500
- Fees
- $40
- Days from application to issue
- 5
- Expires
- Dec 22, 2022
- Application submitted
- Application review
- Permit approved
- Issue date
- First inspection
-
Permit Mechanical HVAC Permit Finaled
2- 2.5 ton Electric Systems installed
- Permit
- 22-18261-HVAC
- Type
- Mechanical HVAC
- Work
- Mechanical HVAC
- Estimated cost (applicant’s figure)
- $2,000
- Fees
- $105
- Days from application to issue
- 6
- Expires
- Dec 23, 2022
- Application submitted
- Application review
- Permit approved
- First inspection
- Issue date
-
Permit Construction Loop Permit Finaled
Temp Pole/ Construction Loop
- Permit
- 21-30866-LOOP
- Type
- Construction Loop
- Work
- Construction Loop
- Estimated cost (applicant’s figure)
- $0
- Fees
- $40
- Contractor
- Juan Jose Arriago-Moreno
- Days from application to issue
- 0
- Expires
- May 3, 2022
- Application submitted
- Application review
- Permit approved
- Issue date
- First inspection
-
Permit Electrical Service / Circuit / Feeder Permit Finaled
Total Rewire. Install boxes wiring switches and outlets. Install GFI in kitchen and bathroom areas. Install smoke alarms. Install A/ C disconnect.
- Permit
- 21-26798-SERV
- Type
- Electrical Service / Circuit / Feeder
- Work
- Electrical Service / Circuit / Feeder
- Estimated cost (applicant’s figure)
- $8,500
- Fees
- $924
- Contractor
- Jose Arriago-Moreno Jose Jose Juan
- Days from application to issue
- 40
- Expires
- May 2, 2022
- Application submitted
- Application review
- Permit approved
- First inspection
- Issue date
-
Permit Mechanical HVAC Permit Cancelled
install 2 new 2.5 ton a/c and 2 new 7 kw electric heaters
- Permit
- 21-26788-HVAC
- Type
- Mechanical HVAC
- Work
- Mechanical HVAC
- Estimated cost (applicant’s figure)
- $195,620
- Fees
- $100
- Days from application to issue
- 14
- Expires
- Apr 7, 2022
- Application submitted
- Application review
- Permit approved
- Issue date
-
Permit Mechanical Fuel Gas Permit Cancelled
new gas line and tankless water heater
- Permit
- 21-25779-FGAS
- Type
- Mechanical Fuel Gas
- Work
- Mechanical Fuel Gas
- Estimated cost (applicant’s figure)
- $195,620
- Fees
- $40
- Days from application to issue
- 1
- Expires
- Mar 15, 2022
- Application submitted
- Application review
- Permit approved
- Issue date
-
Permit Construction Loop Permit Finaled
Temp Pole
- Permit
- 21-24894-LOOP
- Type
- Construction Loop
- Work
- Construction Loop
- Estimated cost (applicant’s figure)
- $250
- Fees
- $40
- Contractor
- Clarence Stewart Jr
- Days from application to issue
- 33
- Expires
- Mar 27, 2022
- Application submitted
- Application review
- Permit approved
- Issue date
- First inspection
-
Permit Change of Address Permit Issued
21-18485-NEWC Single family RETIRE 2611 Fourth St KEEP 2609 Fourth St
- Permit
- 21-18851-ECOA
- Type
- Change of Address
- Work
- Change of Address
- Estimated cost (applicant’s figure)
- $0
- Fees
- $0
- Days from application to issue
- 0
- Expires
- Dec 29, 2021
- Application submitted
- Permit approved
- Issue date
Placed here by an address range from “2609-2611 Fourth St”.
-
Permit New Construction Occupancy
New construction of a 2 story, 1600 sq. ft. single family residence as per plans
- Permit
- 21-18485-NEWC
- Type
- New Construction
- Work
- New Construction
- Estimated cost (applicant’s figure)
- $195,620
- Fees
- $1,236
- Contractor
- Keith J Marrero,Architect, Dragan Segvic LLC
- Days from application to issue
- 34
- Expires
- Jan 30, 2022
- Application submitted
- Application review
- Zoning review
- Plan review
- Permit approved
- Issue date
- First inspection
-
Code enforcement Case 13-08396-MPM Closed
A hearing was held on 05/08/2014 with a result of "Dismissed Wrong Location". The case was subsequently closed.
- Inspection: Inspection Violation: No WIP
- Violation: 160 Weeds and Plant Growth
- Inspection: Posting of Hearing Notice No Violation
- Hearing: Initial Hearing Dismissed Wrong Location
The city links this case to permit 22-18263-FGAS.
-
Code enforcement Case HCEC-11-01882 Closed
The case was filed on 05/11/2011 but has since been closed without further action.
- Inspection: Inspection Existing Case
The city links this case to permit 22-18263-FGAS.
-
Code enforcement Case ENVHADJ-10-00508 Closed
A hearing was held on 02/07/2011 with a result of "Found Guilty". The case was subsequently closed.
- Inspection: Inspection Violation Unoccupied - Bldg
- Hearing: Initial Hearing Found Guilty
The city links this case to permit 22-18263-FGAS.
-
Permit Residential
HURRICANE DAMAGE REPAIR AND CONVERT TO A SINGLE. ONE KITCHEN TO REMAIN.
- Permit
- 07BLD-04334
- Type
- Residential
- Work
- Change of Use
- Estimated cost (applicant’s figure)
- $20,000
- Fees
- $150