2613 Fourth Street is in Central City, zoned HU-RD2 (Older neighborhoods, two-family homes mixed with single-family homes). The city has 6 permits on record here; the most recent, a general mechanical permit, was filed in September 2009. 6 are still open. There were 3 past code enforcement cases, the latest in April 2009, all closed. On this block in the past year: 1 request to 311 and 5 calls to police.
- Zoning
- HU-RD2
- Historic district
- None
- National Register
- Central City Historic District
- Council district
- B
- Ward
- 11
- Lot size
- 2,501 sq ft
- Parcel
- 41040222
Everything on record here
9 records, newest first · 6 open
-
Permit General Mechanical Application Acceptance - Approved
INSTALL ELEC WAF AND 3-TON A\C. ROBERT GOODWIN (#6068)
- Permit
- 09MCH-08939
- Type
- General Mechanical
- Work
- General Mechanical
- Estimated cost (applicant’s figure)
- $0
- Fees
- $62
- Contractor
- Rob's A/C & Heating
- Days from application to issue
- 5
-
Permit Construction Loop Application Acceptance - Approved
TEMP POLE
- Permit
- 09ELC-11453
- Type
- Construction Loop
- Work
- Construction Loop
- Estimated cost (applicant’s figure)
- $0
- Fees
- $30
- Contractor
- G J Services
- Days from application to issue
- 10
-
Permit Electrical Service / Circuit / Feeder Application Acceptance - Approved
NEW CONSTRUCTION- RELEASED FROM BUILDING AND SENT TO ENTERGY 01/12/2010.
- Permit
- 09ELC-11454
- Type
- Electrical Service / Circuit / Feeder
- Work
- Service-Circuits-Feeders
- Estimated cost (applicant’s figure)
- $0
- Fees
- $174
- Contractor
- G J Services
- Days from application to issue
- 10
-
Permit New Construction Certificate of Occupancy - Issued w/Meter
New construction of two-story, single-family dwelling (1518 sqft) as per plans. FY Setback= 3'4"
- Permit
- 09BLD-03073
- Type
- New Construction
- Work
- New
- Estimated cost (applicant’s figure)
- $73,320
- Fees
- $494
- Contractor
- Mark Schroeder
- Days from application to issue
- 12
-
Code enforcement Case ENVHADJ-994012 Closed
A hearing was held on 04/10/2009 with a result of "Found Guilty". The case was subsequently closed.
- Inspection: Inspection Complete
- Hearing: Initial Hearing Found Guilty
The city links this case to permit 09MCH-08939.
-
Code enforcement Case ENVHADJ-9996HB Closed
A hearing was held on 04/10/2009 with a result of "Found Guilty". The case was subsequently closed.
- Inspection: Inspection Complete
- Hearing: Initial Hearing Found Guilty
The city links this case to permit 09MCH-08939.
-
Code enforcement Case ENVHADJ-20003021EH Closed
A hearing was held on 04/10/2009 with a result of "Found Guilty". The case was subsequently closed.
- Inspection: Inspection Complete
- Hearing: Initial Hearing Found Guilty
The city links this case to permit 09MCH-08939.
-
Permit Building
BUILDING DEMOLITION AND DEBRIS REMOVAL DOUBLE RESIDENCE DEMOLISH VACANT DOUBLE TO GRADE. DECLARED PUBLIC NUISANCE BY THE DIVISION OF HOUSING AND NEIGHBORHOOD DEVELOPMENT. DOF'S APPROVAL.
- Permit
- B01004193
- Type
- Building
-
Permit Building
BUILDING DEMOLITION AND DEBRIS REMOVAL VACANT LOT DEMOLISH VACANT DOUBLE TO GRADE. DECLARED PUBLIC NUISANCE BY THE DIVISION OF HOUSING AND NEIGHBORHOOD DEVELOPMENT. DOF'S APPOVAL.
- Permit
- B01004195
- Type
- Building
- Days from application to issue
- 0