Irish Channel

618 Harmony Street is in Irish Channel, zoned HU-RD2 (Older neighborhoods, two-family homes mixed with single-family homes). It is in the Irish Channel historic district under full HDLC control, so most exterior changes need approval first. The city has 7 permits on record here; the most recent, an HDLC COA permit, was filed in May 2017. 6 are still open. A demolition permit was filed in October 2004. There were 15 past code enforcement cases, the latest in April 2009, all closed. On this block in the past year: 5 requests to 311 and 0 calls to police.

Zoning
HU-RD2
Historic district
Irish Channel (Full control)
National Register
Irish Channel Area Architectural District
Council district
B
Ward
11
Lot size
1,064 sq ft
Parcel
41041041

Everything on record here

22 records, newest first · 6 open

  1. Permit HDLC COA Permit Finaled

    Retention of multiple deviations from approved plans for the new construction of a two story, residential building.

    Permit
    17-17621-HDLC
    Type
    HDLC COA
    Work
    HDLC COA
    Estimated cost (applicant’s figure)
    $0
    Fees
    $300
    Days from application to issue
    92
    Expires
    Feb 18, 2018

    See this permit on One Stop

  2. Permit Electrical Repair / Replacement / Addition Permit Issuance - Active

    VACANCY

    Permit
    10ELC-11509
    Type
    Electrical Repair / Replacement / Addition
    Work
    Repair-Replacement-Addition
    Estimated cost (applicant’s figure)
    $0
    Fees
    $40
    Contractor
    Cleveland A Francois Jr.
    Days from application to issue
    0
  3. Code enforcement Case ENVHADJ-981075 Closed

    A hearing was held on 04/10/2009 with a result of "Found Guilty". The case was subsequently closed.

    1. Inspection: Inspection Complete
    2. Hearing: Initial Hearing Found Guilty

    The city links this case to permit 17-17621-HDLC.

  4. Code enforcement Case ENVHADJ-2001226HB Closed

    A hearing was held on 04/10/2009 with a result of "Found Guilty". The case was subsequently closed.

    1. Inspection: Inspection Complete
    2. Hearing: Initial Hearing Found Guilty

    The city links this case to permit 17-17621-HDLC.

  5. Code enforcement Case ENVHADJ-2006215HD Closed

    A hearing was held on 04/10/2009 with a result of "Found Guilty". The case was subsequently closed.

    1. Inspection: Inspection Complete
    2. Hearing: Initial Hearing Found Guilty

    The city links this case to permit 17-17621-HDLC.

  6. Code enforcement Case ENVHADJ-2006216HD Closed

    A hearing was held on 04/10/2009 with a result of "Found Guilty". The case was subsequently closed.

    1. Inspection: Inspection Complete
    2. Hearing: Initial Hearing Found Guilty

    The city links this case to permit 17-17621-HDLC.

  7. Code enforcement Case ENVHADJ-200770HD Closed

    A hearing was held on 04/10/2009 with a result of "Found Guilty". The case was subsequently closed.

    1. Inspection: Inspection Complete
    2. Hearing: Initial Hearing Found Guilty

    The city links this case to permit 17-17621-HDLC.

  8. Code enforcement Case ENVHADJ-200771HD Closed

    A hearing was held on 04/10/2009 with a result of "Found Guilty". The case was subsequently closed.

    1. Inspection: Inspection Complete
    2. Hearing: Initial Hearing Found Guilty

    The city links this case to permit 17-17621-HDLC.

  9. Code enforcement Case ENVHADJ-200772HD Closed

    A hearing was held on 04/10/2009 with a result of "Found Guilty". The case was subsequently closed.

    1. Inspection: Inspection Complete
    2. Hearing: Initial Hearing Found Guilty

    The city links this case to permit 17-17621-HDLC.

  10. Code enforcement Case ENVHADJ-200773HD Closed

    A hearing was held on 04/10/2009 with a result of "Found Guilty". The case was subsequently closed.

    1. Inspection: Inspection Complete
    2. Hearing: Initial Hearing Found Guilty

    The city links this case to permit 17-17621-HDLC.

  11. Code enforcement Case ENVHADJ-200774HD Closed

    The property was inspected on 12/06/2006 with a finding of "Complete". The file was subsequently closed.

    1. Inspection: Inspection Complete

    The city links this case to permit 17-17621-HDLC.

  12. Code enforcement Case ENVHADJ-20081038HD Closed

    A hearing was held on 09/29/2009 with a result of "Dismissed". The case was subsequently closed.

    1. Inspection: Inspection Complete
    2. Hearing: Initial Hearing Dismissed

    The city links this case to permit 17-17621-HDLC.

  13. Code enforcement Case ENVHADJ-20081039HD Closed

    A hearing was held on 04/10/2009 with a result of "Found Guilty". The case was subsequently closed.

    1. Inspection: Inspection Complete
    2. Hearing: Initial Hearing Found Guilty

    The city links this case to permit 17-17621-HDLC.

  14. Code enforcement Case ENVHADJ-20081040HD Closed

    A hearing was held on 04/10/2009 with a result of "Found Guilty". The case was subsequently closed.

    1. Inspection: Inspection Complete
    2. Hearing: Initial Hearing Found Guilty

    The city links this case to permit 17-17621-HDLC.

  15. Code enforcement Case ENVHADJ-20081041HD Closed

    A hearing was held on 04/10/2009 with a result of "Found Guilty". The case was subsequently closed.

    1. Inspection: Inspection Complete
    2. Hearing: Initial Hearing Found Guilty

    The city links this case to permit 17-17621-HDLC.

  16. Code enforcement Case ENVHADJ-20081042HD Closed

    A hearing was held on 04/10/2009 with a result of "Found Guilty". The case was subsequently closed.

    1. Inspection: Inspection Complete
    2. Hearing: Initial Hearing Found Guilty

    The city links this case to permit 17-17621-HDLC.

  17. Code enforcement Case ENVHADJ-20081043HD Closed

    A hearing was held on 04/10/2009 with a result of "Found Guilty". The case was subsequently closed.

    1. Inspection: Inspection Complete
    2. Hearing: Initial Hearing Found Guilty

    The city links this case to permit 17-17621-HDLC.

  18. Permit Electrical Repair / Replacement / Addition Application Acceptance - Approved

    RECONNECT

    Permit
    06ELC-14507
    Type
    Electrical Repair / Replacement / Addition
    Work
    Repair-Replacement-Addition
    Estimated cost (applicant’s figure)
    $0
    Fees
    $30
    Contractor
    Pannell's Assoc Electric, Inc
    Days from application to issue
    10
  19. Permit Electrical Service / Circuit / Feeder Application Acceptance - Approved

    REWIRE

    Permit
    05ELC-06873
    Type
    Electrical Service / Circuit / Feeder
    Work
    Service-Circuits-Feeders
    Estimated cost (applicant’s figure)
    $0
    Fees
    $90
    Contractor
    K. Blazio Electric
    Days from application to issue
    10
  20. Permit Construction Loop Application Acceptance - Approved

    REWIRE

    Permit
    05ELC-05810
    Type
    Construction Loop
    Work
    Construction Loop
    Estimated cost (applicant’s figure)
    $0
    Fees
    $30
    Contractor
    K. Blazio Electric
    Days from application to issue
    11
  21. Permit New Construction Certificate of Occupancy - Issued No Meter

    NEW CONSTRUCTION OF A 2-STY SINGLE FAMILY DWLLING AS PER PLANS, HDLC C OF A #I382, AND BZA DOCKET #36-05 FOR THE REAR YARD, AGGREGATE SIDE YARD, AND OFF-STREET PARKING.

    Permit
    05BLD-01192
    Type
    New Construction
    Work
    New
    Estimated cost (applicant’s figure)
    $72,000
    Fees
    $723
    Contractor
    Great South Engineers, Inc.
    Days from application to issue
    12
  22. Permit Demolition Inspection - Completed No Requirements

    Demolition to grade of a 1 story single family residence as per owner's request and HDLC C of A#:I382.Inside of the HCDRC District.

    Permit
    04BLD-02591
    Type
    Demolition
    Work
    Demolition
    Estimated cost (applicant’s figure)
    $3,500
    Fees
    $143
    Days from application to issue
    7