Irish Channel
605 Toledano Street is in Irish Channel, zoned HU-MU (Older neighborhoods, walkable mix of shops with homes above). It is in the Irish Channel historic district under full HDLC control, so most exterior changes need approval first. The city has 5 permits on record here; the most recent, a renovation (non-structural) permit, was filed in June 2019. 4 are still open. There were 20 past code enforcement cases, the latest in April 2009, all closed. On this block in the past year: 1 request to 311 and 0 calls to police.
- Zoning
- HU-MU
- Historic district
- Irish Channel (Full control)
- National Register
- Irish Channel Area Architectural District
- Council district
- B
- Ward
- 11
- Lot size
- 8,809 sq ft
- Parcel
- 41041602
Everything on record here
25 records, newest first · 4 open
-
Permit Renovation (Non-Structural) Other
Non structural renovation to a commercial structure. Scope of work includes building partition to separate warehouse. Install sheet rock paint/prime and minor electrical
- Permit
- 19-18698-RNVN
- Type
- Renovation (Non-Structural)
- Work
- Renovation (Non-Structural)
- Estimated cost (applicant’s figure)
- $20,000
- Fees
- $160
- Days from application to issue
- 41
- Expires
- Jan 22, 2020
- Application submitted
- Application review
- Zoning review
- Plan review
- Permit approved
- Issue date
- First inspection
-
Code enforcement Case ENVHADJ-20016011SZ Closed
A hearing was held on 04/10/2009 with a result of "Found Guilty". The case was subsequently closed.
- Inspection: Inspection Complete
- Hearing: Initial Hearing Found Guilty
The city links this case to permit 06COM-02308.
-
Code enforcement Case ENVHADJ-20021920F Closed
A hearing was held on 04/10/2009 with a result of "Found Guilty". The case was subsequently closed.
- Inspection: Inspection Complete
- Hearing: Initial Hearing Found Guilty
The city links this case to permit 06COM-02308.
-
Code enforcement Case ENVHADJ-20021921F Closed
A hearing was held on 04/10/2009 with a result of "Found Guilty". The case was subsequently closed.
- Inspection: Inspection Complete
- Hearing: Initial Hearing Found Guilty
The city links this case to permit 06COM-02308.
-
Code enforcement Case ENVHADJ-20021922F Closed
A hearing was held on 04/10/2009 with a result of "Found Guilty". The case was subsequently closed.
- Inspection: Inspection Complete
- Hearing: Initial Hearing Found Guilty
The city links this case to permit 06COM-02308.
-
Code enforcement Case ENVHADJ-20021923F Closed
A hearing was held on 04/10/2009 with a result of "Found Guilty". The case was subsequently closed.
- Inspection: Inspection Complete
- Hearing: Initial Hearing Found Guilty
The city links this case to permit 06COM-02308.
-
Code enforcement Case ENVHADJ-20022141F Closed
A hearing was held on 04/10/2009 with a result of "Found Guilty". The case was subsequently closed.
- Inspection: Inspection Complete
- Hearing: Initial Hearing Found Guilty
The city links this case to permit 06COM-02308.
-
Code enforcement Case ENVHADJ-20022142F Closed
A hearing was held on 04/10/2009 with a result of "Found Guilty". The case was subsequently closed.
- Inspection: Inspection Complete
- Hearing: Initial Hearing Found Guilty
The city links this case to permit 06COM-02308.
-
Code enforcement Case ENVHADJ-20022143F Closed
A hearing was held on 04/10/2009 with a result of "Found Guilty". The case was subsequently closed.
- Inspection: Inspection Complete
- Hearing: Initial Hearing Found Guilty
The city links this case to permit 06COM-02308.
-
Code enforcement Case ENVHADJ-20022144F Closed
A hearing was held on 04/10/2009 with a result of "Found Guilty". The case was subsequently closed.
- Inspection: Inspection Complete
- Hearing: Initial Hearing Found Guilty
The city links this case to permit 06COM-02308.
-
Code enforcement Case ENVHADJ-20023171F Closed
A hearing was held on 04/10/2009 with a result of "Found Guilty". The case was subsequently closed.
- Inspection: Inspection Complete
- Hearing: Initial Hearing Found Guilty
The city links this case to permit 06COM-02308.
-
Code enforcement Case ENVHADJ-20023172F Closed
A hearing was held on 04/10/2009 with a result of "Found Guilty". The case was subsequently closed.
- Inspection: Inspection Complete
- Hearing: Initial Hearing Found Guilty
The city links this case to permit 06COM-02308.
-
Code enforcement Case ENVHADJ-20023173F Closed
A hearing was held on 04/10/2009 with a result of "Found Guilty". The case was subsequently closed.
- Inspection: Inspection Complete
- Hearing: Initial Hearing Found Guilty
The city links this case to permit 06COM-02308.
-
Code enforcement Case ENVHADJ-20023174F Closed
A hearing was held on 04/10/2009 with a result of "Found Guilty". The case was subsequently closed.
- Inspection: Inspection Complete
- Hearing: Initial Hearing Found Guilty
The city links this case to permit 06COM-02308.
-
Code enforcement Case ENVHADJ-20023175F Closed
A hearing was held on 04/10/2009 with a result of "Found Guilty". The case was subsequently closed.
- Inspection: Inspection Complete
- Hearing: Initial Hearing Found Guilty
The city links this case to permit 06COM-02308.
-
Code enforcement Case ENVHADJ-20023176F Closed
A hearing was held on 04/10/2009 with a result of "Found Guilty". The case was subsequently closed.
- Inspection: Inspection Complete
- Hearing: Initial Hearing Found Guilty
The city links this case to permit 06COM-02308.
-
Code enforcement Case ENVHADJ-20023177F Closed
A hearing was held on 04/10/2009 with a result of "Found Guilty". The case was subsequently closed.
- Inspection: Inspection Complete
- Hearing: Initial Hearing Found Guilty
The city links this case to permit 06COM-02308.
-
Code enforcement Case ENVHADJ-20023178F Closed
A hearing was held on 04/10/2009 with a result of "Found Guilty". The case was subsequently closed.
- Inspection: Inspection Complete
- Hearing: Initial Hearing Found Guilty
The city links this case to permit 06COM-02308.
-
Code enforcement Case ENVHADJ-20023179F Closed
A hearing was held on 04/10/2009 with a result of "Found Guilty". The case was subsequently closed.
- Inspection: Inspection Complete
- Hearing: Initial Hearing Found Guilty
The city links this case to permit 06COM-02308.
-
Code enforcement Case ENVHADJ-20023180F Closed
A hearing was held on 04/10/2009 with a result of "Found Guilty". The case was subsequently closed.
- Inspection: Inspection Complete
- Hearing: Initial Hearing Found Guilty
The city links this case to permit 06COM-02308.
-
Code enforcement Case ENVHADJ-2002438F Closed
A hearing was held on 04/10/2009 with a result of "Found Guilty". The case was subsequently closed.
- Inspection: Inspection Complete
- Hearing: Initial Hearing Found Guilty
The city links this case to permit 06COM-02308.
-
Permit Renovation (Non-Structural) Application Acceptance - Approved No Review
REPAIR HURRICANE DAMAGE TO ROOF OF EXISTING MIXED USE BUILDING
- Permit
- 06COM-02308
- Type
- Renovation (Non-Structural)
- Work
- NA
- Estimated cost (applicant’s figure)
- $47,000
- Fees
- $285
- Days from application to issue
- 6
-
Permit Electrical Application Approved
- Permit
- 04ELC-01956
- Type
- Electrical
- Work
- Repair-Replacement-Addition
- Estimated cost (applicant’s figure)
- $0
- Fees
- $30
-
Permit Electrical Application Approved
- Permit
- 04ELC-00855
- Type
- Electrical
- Work
- Service-Circuits-Feeders
- Estimated cost (applicant’s figure)
- $0
- Fees
- $90
-
Permit Electrical Application Approved
- Permit
- 04ELC-00586
- Type
- Electrical
- Work
- Service-Circuits-Feeders
- Estimated cost (applicant’s figure)
- $0
- Fees
- $90