Audubon
513 Audubon Street is in Audubon, zoned HU-RS (Older neighborhoods, single-family homes). It is in the Uptown historic district under partial HDLC control, where demolition needs HDLC review. The city has 2 permits on record here; the most recent, a lead-based paint form permit, was filed in December 2013. 1 is still open. There is 1 open code enforcement case. On this block in the past year: 10 requests to 311 and 6 calls to police.
- Zoning
- HU-RS
- Historic district
- Uptown (Partial control)
- National Register
- Uptown New Orleans Historic District
- Council district
- A
- Ward
- 14
- Lot size
- 7,870 sq ft
- Parcel
- 41043860
Everything on record here
6 records, newest first · 2 open
-
Code enforcement Case 26-09942-MPM Hearing
The file has been processed and reviewed by a title examiner and is awaiting scheduling for a hearing.
- Inspection
- Title Research
- Hearing
- Judgment
- In Compliance
- Violation: 157 Sanitation
- Violation: 160 Weeds and Plant Growth
- Violation: 161 Rodent Harborage
- Violation: 172 Gutters and Downspouts
- Violation: 176 Decks Porches and Balconies
- Inspection: Inspection Violation: No WIP
- Violation: 167 Exterior Surfaces
- Violation: 172 Roofs
- Violation: 177 Chimneys and Towers
The city links this case to permit 13-48105-LEAD.
-
Code enforcement Case 14-10155-MPM Closed
The property was inspected on 01/12/2015 with a finding of "No Violation". The file was subsequently closed.
- Inspection: Inspection No Violation
The city links this case to permit 13-48105-LEAD.
-
Permit Lead-Based Paint Form Permit Finaled
properly and and prepare building to receave paint. contain and dispose of all dust and paint chips properly
- Permit
- 13-48105-LEAD
- Type
- Lead-Based Paint Form
- Work
- Lead-Based Paint Form
- Estimated cost (applicant’s figure)
- $0
- Fees
- $0
- Days from application to issue
- 0
- Expires
- Jun 18, 2014
-
Code enforcement Case 13-04719-PNBL Closed
A hearing was held on 03/10/2014 with a result of "Guilty".
- Inspection: Inspection Violation: No WIP
- Violation: 160 Weeds and Plant Growth
- Violation: 161 Rodent Harborage
- Violation: 167 Paint or Protective Treatment
- Inspection: Posting of Hearing Notice Violation: No WIP
- Hearing: Initial Hearing Reset: Work In Progress
- Inspection: Reinspection Violation: WIP
- Hearing: Reset Hearing Reset: Work In Progress
- Inspection: Reinspection Violation: WIP
- Hearing: Reset Hearing Guilty
The city links this case to permit 13-48105-LEAD.
-
Code enforcement Case ENVHADJ-2008196EH Closed
A hearing was held on 04/10/2009 with a result of "Found Guilty". The case was subsequently closed.
- Inspection: Inspection Complete
- Hearing: Initial Hearing Found Guilty
The city links this case to permit 13-48105-LEAD.
-
Permit General Mechanical Inspection - Completed
RLL-C-BOURGEOIS-486-5731-RECONNECT-CK-53287
- Permit
- 08MCH-06381
- Type
- General Mechanical
- Work
- General Mechanical
- Estimated cost (applicant’s figure)
- $0
- Fees
- $30
- Contractor
- Al Bourgeois Plg&Htg
- Days from application to issue
- 5