East Riverside

709 Milan Street is in East Riverside, zoned HU-RD2 (Older neighborhoods, two-family homes mixed with single-family homes). It is in the Uptown historic district under partial HDLC control, where demolition needs HDLC review. The city has 10 permits on record here; the most recent, a mechanical fuel gas permit, was filed in June 2024. 1 is still open. A demolition permit was filed in November 2022. On this block in the past year: 3 requests to 311 and 5 calls to police.

Zoning
HU-RD2
Historic district
Uptown (Partial control)
National Register
Uptown New Orleans Historic District
Council district
B
Ward
12
Lot size
3,464 sq ft
Parcel
41046202

Everything on record here

10 records, newest first · 1 open

  1. Permit Mechanical Fuel Gas Permit Finaled

    Six month vacancy, check to be certain of no leaks, get inspection preformed by City of New Orleans. Added Water Heater

    Permit
    24-18655-FGAS
    Type
    Mechanical Fuel Gas
    Work
    Mechanical Fuel Gas
    Estimated cost (applicant’s figure)
    $375
    Fees
    $50
    Contractor
    Lawrence Lucas, Sr
    Days from application to issue
    2
    Expires
    Dec 19, 2024
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  2. Permit Renovation (Structural) Permit Cancelled

    My renovation is completed at 709 Milan St. I need a extension for my Final Inspection. My permit#22-07154-RNVS/Ref# HYGSVX!

    Permit
    24-15369-RNVS
    Type
    Renovation (Structural)
    Work
    Renovation (Structural)
    Estimated cost (applicant’s figure)
    $38,000
    Fees
    $310
    Contractor
    Robertson Cassandra
    1. Application submitted

    See this permit on One Stop

  3. Permit Construction Loop Permit Finaled

    PULL PERMIT FOR CONSTRUCTION LOOP.

    Permit
    23-04077-LOOP
    Type
    Construction Loop
    Work
    Construction Loop
    Estimated cost (applicant’s figure)
    $750
    Fees
    $40
    Contractor
    K. P Electric LLC
    Days from application to issue
    1
    Expires
    Aug 10, 2023
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  4. Permit Electrical Service / Circuit / Feeder Permit Finaled

    TOTAL RE-WIRE OF SINGLE DWELLING

    Permit
    23-04076-SERV
    Type
    Electrical Service / Circuit / Feeder
    Work
    Electrical Service / Circuit / Feeder
    Estimated cost (applicant’s figure)
    $6,500
    Fees
    $154
    Contractor
    Kevin M Pettis
    Days from application to issue
    1
    Expires
    Aug 10, 2023
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  5. Permit HDLC COA Other

    Demolition of existing Non-Contributing rated one-story rear accessory structure under 1,000 SF to grade (after-the-fact).

    Permit
    22-24400-HDLC
    Type
    HDLC COA
    Work
    HDLC COA
    Estimated cost (applicant’s figure)
    $0
    Fees
    $0
    Days from application to issue
    0
    Expires
    Mar 14, 2023

    See this permit on One Stop

  6. Permit HDLC COA Permit Finaled

    Retention of demolition of more than 50% of the exterior walls of an existing Contributing rated two-story, single-family residential building without a Certificate of Appropriateness.

    Permit
    22-07154-HDLC
    Type
    HDLC COA
    Work
    HDLC COA
    Estimated cost (applicant’s figure)
    $0
    Fees
    $3,500
    Days from application to issue
    52
    Expires
    May 4, 2023

    See this permit on One Stop

  7. Permit Demolition Inspection Phase

    Demolition of existing Non-Contributing rated one-story rear accessory structure (after-the-fact)

    Permit
    22-24400-DEMO
    Type
    Demolition
    Work
    Demolition
    Estimated cost (applicant’s figure)
    $0
    Fees
    $885
    Contractor
    J Walker Construction LLC
    Days from application to issue
    86
    Expires
    May 7, 2023
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date

    See this permit on One Stop

  8. Permit Renovation (Structural) Occupancy

    Remove the entire camelback structure of the house and renovate existing and rebuild camelback. . Current renovations are allowed under Permit No: 20-40251-RNVS. (11/18/22: Note SOW includes concrete slab work at rear of the structure. See shts A-2 and A-3)

    Permit
    22-07154-RNVS
    Type
    Renovation (Structural)
    Work
    Renovation (Structural)
    Estimated cost (applicant’s figure)
    $38,000
    Fees
    $310
    Days from application to issue
    244
    Expires
    May 9, 2023
    1. Application submitted
    2. Application review
    3. Zoning review
    4. Plan review
    5. Permit approved
    6. Issue date
    7. First inspection

    See this permit on One Stop

  9. Permit Mechanical HVAC Permit Finaled

    Installation of a new 4 ton Air Handler w 15 kw heater including ductwork

    Permit
    21-20854-HVAC
    Type
    Mechanical HVAC
    Work
    Mechanical HVAC
    Estimated cost (applicant’s figure)
    $7,200
    Fees
    $68
    Days from application to issue
    290
    Expires
    Nov 5, 2022
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  10. Permit Renovation (Structural) Permit Issued

    The removal of drywall, flooring, cabinets, doors and siding to be replaced the removal of electrical wiring, plumbing and A/C to be replaced the removal of sills and floor joist and replaced. Extend permit 180 days to 11-26-22

    Permit
    20-40251-RNVS
    Type
    Renovation (Structural)
    Work
    Renovation (Structural)
    Estimated cost (applicant’s figure)
    $38,817
    Fees
    $320
    Contractor
    Kevin M Pettis, Roosevelt Nunnery, Rooter King Sewer and Drain Service, Inc.
    Days from application to issue
    448
    Expires
    Jun 1, 2022
    1. Application submitted
    2. Application review
    3. Zoning review
    4. Plan review
    5. Permit approved
    6. Issue date

    See this permit on One Stop