1330 Louisiana Avenue is in Touro, zoned HU-RD1 (Older neighborhoods, two-family homes on smaller lots). It is in the Garden District historic district under partial HDLC control, where demolition needs HDLC review. The city has 4 permits on record here; the most recent, a mechanical fuel gas permit, was filed in September 2026. 1 is still open. On this block in the past year: 6 requests to 311 and 2 calls to police.
- Zoning
- HU-RD1
- Historic district
- Garden District (Partial control)
- National Register
- The Garden District
- Council district
- B
- Ward
- 12
- Lot size
- 5,833 sq ft
- Parcel
- 41047322
Everything on record here
4 records, newest first · 1 open
-
Permit Mechanical Fuel Gas Other
Install a new 22 kW natural gas standby generator with a 200-amp automatic transfer switch. Generator will be installed on an aluminum stand with concrete footers. Provide and install electrical wiring in PVC conduit and a properly sized natural gas line routed through the crawlspace to the generator. Includes required gas utility modifications, load management, vent sealing, CO detectors, whole-home surge protection, and generator commissioning.
- Permit
- 26-26491-FGAS
- Type
- Mechanical Fuel Gas
- Work
- Mechanical Fuel Gas
- Estimated cost (applicant’s figure)
- $17,266
- Fees
- $80
- Contractor
- Jeremiah Alexander Johnson
- Days from application to issue
- 1
- Expires
- Mar 10, 2027
- Mechanical Special Inspection Paid
- Gas Line and Outlets Paid
- Mechanical Special Equipment Paid
- Special Equipment
- Rough Mech Gas Res
- Special Mechanical
- Application Submitted Complete
- Application submitted
- Application Review Complete
- Permit Approved Complete
- Permit Issued Complete
- Mechanical Permit Review Complete
- Zoning Complete
- Application review
- Permit approved
- Issue date
- Inspections Finaled Complete
- Gas Line Passed
- First inspection
- Certificate of Completion Complete
- Meter Release - Gas Complete
- Mechanical Permit Review Complete
-
Permit Permanent Generator Other
Install a new 22 kW natural gas standby generator with a 200-amp automatic transfer switch. Generator will be installed on an aluminum stand with concrete footers. Provide and install electrical wiring in PVC conduit and a properly sized natural gas line routed through the crawlspace to the generator. Includes required gas utility modifications, load management, vent sealing, CO detectors, whole-home surge protection, and generator commissioning.
- Permit
- 26-26473-EGEN
- Type
- Permanent Generator
- Work
- Permanent Generator
- Estimated cost (applicant’s figure)
- $17,266
- Fees
- $103
- Contractor
- Jeremiah Alexander Johnson
- Days from application to issue
- 5
- Expires
- Mar 14, 2027
- Electrical Paid
- Preliminary
- Application Submitted Complete
- Application submitted
- Zoning Complete
- Application Review Complete
- Permit Approved Complete
- Permit Issued Complete
- Electrical Complete
- Application review
- Permit approved
- Issue date
- Final Electric Passed
- First inspection
- Certificate of Completion Complete
-
Permit Mechanical HVAC Permit Finaled
REPLACE TWO 3.5 TON SYSTEMS
- Permit
- 19-13283-HVAC
- Type
- Mechanical HVAC
- Work
- Mechanical HVAC
- Estimated cost (applicant’s figure)
- $18,601
- Fees
- $111
- Contractor
- Jude G. Raspino Jr.
- Days from application to issue
- 1
- Expires
- Oct 30, 2019
- Application submitted
- Application review
- Permit approved
- Issue date
- First inspection
-
Permit Electrical Repair / Replacement / Addition Permit Issued
200AMP PANEL
- Permit
- 14-22000-ERPR
- Type
- Electrical Repair / Replacement / Addition
- Work
- Electrical Repair / Replacement / Addition
- Estimated cost (applicant’s figure)
- $0
- Fees
- $100
- Contractor
- Salvadore J. Ditta
- Days from application to issue
- 0