East Riverside

3817 Annunciation Street is in East Riverside, zoned HU-RD2 (Older neighborhoods, two-family homes mixed with single-family homes). It is in the Uptown historic district under partial HDLC control, where demolition needs HDLC review. The city has 9 permits on record here; the most recent, an accessory structure permit, was filed in September 2024. 1 is still open. A demolition permit was filed in March 2022. There were 2 past code enforcement cases, the latest in July 2024, all closed. On this block in the past year: 6 requests to 311 and 23 calls to police.

Zoning
HU-RD2
Historic district
Uptown (Partial control)
National Register
Uptown New Orleans Historic District
Council district
B
Ward
12
Lot size
3,471 sq ft
Parcel
41047485

Everything on record here

11 records, newest first · 1 open

  1. Permit Accessory Structure Application Accepted

    Building An arbor for roses 10’ high x 7’ wide.

    Permit
    24-21111-ACCS
    Type
    Accessory Structure
    Work
    Accessory Structure
    Estimated cost (applicant’s figure)
    $0
    Fees
    $120
    1. Application submitted

    See this permit on One Stop

  2. Code enforcement Case 24-07643-MPM Closed

    The property was inspected on 08/23/2024 with a finding of "No Violation". The file was subsequently closed.

    1. Inspection: Inspection No Violation

    The city links this case to permit 24-21111-ACCS.

  3. Permit Driveway/ Curb Cut and Restoration Other

    New Driveway for a single family home.

    Permit
    23-31612-RDRV
    Type
    Driveway/ Curb Cut and Restoration
    Work
    Driveway/ Curb Cut and Restoration
    Estimated cost (applicant’s figure)
    $0
    Fees
    $100
    Contractor
    JLV Construction, LLC

    See this permit on One Stop

  4. Permit Mechanical Fuel Gas Permit Finaled

    install new gas line to supply stove water heater dryer and furnace and will install 30 gallon water heater gas

    Permit
    23-25646-FGAS
    Type
    Mechanical Fuel Gas
    Work
    Mechanical Fuel Gas
    Estimated cost (applicant’s figure)
    $4,656
    Fees
    $35
    Days from application to issue
    1
    Expires
    Mar 18, 2024
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  5. Permit Mechanical HVAC Permit Finaled

    installation of two air handlers and two condenser.

    Permit
    23-19549-HVAC
    Type
    Mechanical HVAC
    Work
    Mechanical HVAC
    Estimated cost (applicant’s figure)
    $14,600
    Fees
    $100
    Contractor
    Gregory J Hackenberg
    Days from application to issue
    6
    Expires
    Jan 25, 2024
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  6. Permit Electrical Service / Circuit / Feeder Permit Finaled

    service/circuits

    Permit
    23-16788-SERV
    Type
    Electrical Service / Circuit / Feeder
    Work
    Electrical Service / Circuit / Feeder
    Estimated cost (applicant’s figure)
    $17,000
    Fees
    $145
    Contractor
    Jesse Earl Carr Jr
    Days from application to issue
    6
    Expires
    Dec 27, 2023
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  7. Permit Construction Loop Permit Finaled

    construction loop

    Permit
    23-16785-LOOP
    Type
    Construction Loop
    Work
    Construction Loop
    Estimated cost (applicant’s figure)
    $500
    Fees
    $40
    Contractor
    Jesse Earl Carr Jr
    Days from application to issue
    6
    Expires
    Dec 27, 2023
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  8. Permit New Construction Occupancy

    New single family home on a vacant lot

    Permit
    22-23190-NEWC
    Type
    New Construction
    Work
    New Construction
    Estimated cost (applicant’s figure)
    $310,717
    Fees
    $1,926
    Contractor
    Villeda Jose
    Days from application to issue
    248
    Expires
    Oct 7, 2023
    1. Application submitted
    2. Zoning review
    3. Application review
    4. Plan review
    5. Permit approved
    6. Issue date
    7. First inspection

    See this permit on One Stop

  9. Code enforcement Case 22-00702-MPM Closed

    A hearing was held on 08/01/2022 with a result of "Guilty: Abated".

    1. Inspection: Inspection Violation: No WIP
    2. Violation: 157 Sanitation
    3. Violation: 160 Weeds and Plant Growth
    4. Violation: 161 Rodent Harborage
    5. Violation: 167 Exterior Surfaces
    6. Violation: 167 Siding and Masonry
    7. Violation: 169 Columns
    8. Violation: 169 Studs
    9. Violation: 169 Structure
    10. Violation: 171 Exterior Walls
    11. Violation: 172 Roofs
    12. Violation: 174 Decorative Features
    13. Inspection: Posting of Hearing Notice No Violation
    14. Hearing: Initial Hearing Guilty: Abated

    The city links this case to permit 24-21111-ACCS.

  10. Permit HDLC COA Permit Finaled

    Demolition of existing non-contributing one-story, two-family residential building to grade.

    Permit
    22-00174-HDLC
    Type
    HDLC COA
    Work
    HDLC COA
    Estimated cost (applicant’s figure)
    $0
    Fees
    $0
    Days from application to issue
    45
    Expires
    Sep 11, 2022

    See this permit on One Stop

  11. Permit Demolition Permit Finaled

    Demolition Permit: This structure received significant damage in Hurricane Ida. It has a hole in the roof and both sidewalls and continues to deteriorate with exposure to rain. It also lost a front column. It has been vacant since May 2021. We have received advice from our general contractor that this structure could be in imminent danger of collapse.

    Permit
    22-00174-DEMO
    Type
    Demolition
    Work
    Demolition
    Estimated cost (applicant’s figure)
    $7,800
    Fees
    $203
    Contractor
    JLV Construction
    Days from application to issue
    49
    Expires
    Sep 11, 2022
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop