Milan

2022 Foucher Street is in Milan, zoned HU-RD2 (Older neighborhoods, two-family homes mixed with single-family homes). It is in the Uptown historic district under partial HDLC control, where demolition needs HDLC review. The city has 10 permits on record here; the most recent, a mechanical fuel gas permit, was filed in August 2015. 6 are still open. A demolition permit was filed in March 2007. A building here was demolished under the FEMA program, completed in September 2011. There were 28 past code enforcement cases, the latest in October 2014, all closed. On this block in the past year: 9 requests to 311 and 5 calls to police.

Zoning
HU-RD2
Historic district
Uptown (Partial control)
National Register
Uptown New Orleans Historic District
Council district
B
Ward
12
Lot size
3,820 sq ft
Parcel
41052179

Everything on record here

39 records, newest first · 6 open

  1. Permit Mechanical Fuel Gas Permit Finaled

    rll-gcarlton-232-3347-gas-line-1-wh-ck-5632

    Permit
    15-25621-FGAS
    Type
    Mechanical Fuel Gas
    Work
    Mechanical Fuel Gas
    Estimated cost (applicant’s figure)
    $0
    Fees
    $35
    Contractor
    Bradley Carlton
    Days from application to issue
    0
    Expires
    Feb 26, 2016

    See this permit on One Stop

  2. Permit Electrical Service / Circuit / Feeder Permit Finaled

    wire new construction 14-33191-NEWC

    Permit
    15-03053-SERV
    Type
    Electrical Service / Circuit / Feeder
    Work
    Electrical Service / Circuit / Feeder
    Estimated cost (applicant’s figure)
    $0
    Fees
    $148
    Contractor
    Robert Brian Mills
    Days from application to issue
    0
    Expires
    Jul 30, 2015

    See this permit on One Stop

  3. Permit General Mechanical Permit Finaled

    rll-m-rivera-554-3582-1-ac-1-waf-ck-1703

    Permit
    15-02178-MECH
    Type
    General Mechanical
    Work
    General Mechanical
    Estimated cost (applicant’s figure)
    $0
    Fees
    $68
    Contractor
    Miguel Rivera
    Days from application to issue
    0
    Expires
    Jul 23, 2015

    See this permit on One Stop

  4. Permit Construction Loop Permit Issued

    temp pole 14-33191-NEWC

    Permit
    14-35316-LOOP
    Type
    Construction Loop
    Work
    Construction Loop
    Estimated cost (applicant’s figure)
    $0
    Fees
    $40
    Contractor
    Robert Brian Mills
    Days from application to issue
    0
    Expires
    May 12, 2015

    See this permit on One Stop

  5. Permit New Construction Occupancy

    New construction of a single-story 2,116 sq. ft. single family structure as per plans.

    Permit
    14-33191-NEWC
    Type
    New Construction
    Work
    New Construction
    Estimated cost (applicant’s figure)
    $150,000
    Fees
    $960
    Contractor
    Rodney Ratliff, Pentek Design Build, LLC
    Days from application to issue
    17
    Expires
    May 10, 2015

    See this permit on One Stop

  6. Code enforcement Case 14-09195-MPM Closed

    The property was inspected on 09/30/2014 with a finding of "Violation: No WIP". The file was subsequently closed.

    1. Inspection: Inspection Violation: No WIP
    2. Violation: 157 Sanitation
    3. Violation: 159 Sidewalks
    4. Violation: 160 Weeds and Plant Growth
    5. Violation: 161 Rodent Harborage

    The city links this case to permit 07BLD-02231.

  7. Code enforcement Case 14-06017-MPM Closed

    A hearing was held on 08/05/2014 with a result of "Guilty: Abated".

    1. Inspection: Inspection Violation: No WIP
    2. Violation: 157 Sanitation
    3. Violation: 159 Sidewalks
    4. Violation: 160 Weeds and Plant Growth
    5. Inspection: Posting of Hearing Notice Violation: WIP
    6. Hearing: Initial Hearing Guilty: Abated

    The city links this case to permit 15-25621-FGAS.

  8. Code enforcement Case 13-08941-MPM Closed

    A hearing was held on 12/05/2013 with a result of "Guilty: Public Nuisance Blight".

    1. Inspection: Inspection Violation: No WIP
    2. Violation: 157 Sanitation
    3. Violation: 159 Sidewalks
    4. Violation: 160 Weeds and Plant Growth
    5. Violation: 161 Rodent Harborage
    6. Inspection: Posting of Hearing Notice Violation: No WIP
    7. Hearing: Initial Hearing Guilty: Public Nuisance Blight
    8. Inspection: Posting of Judgment Violation: No WIP

    The city links this case to permit 15-25621-FGAS.

  9. Code enforcement Case 12-08815-PNBL Closed

    The property was inspected on 09/21/2012 with a finding of "Violation: No WIP". The file was subsequently closed.

    1. Inspection: Inspection Violation: No WIP
    2. Violation: 28-33 Duty to Mow Grass
    3. Violation: 28-20 Rodent Harborage
    4. Violation: 28-33 Duty to Remove Trash and Debris

    The city links this case to permit 15-25621-FGAS.

  10. Code enforcement Case CEHB-11-6543 Closed

    The property was inspected on 08/23/2011 with a finding of "Violation Unoccupied". The file was subsequently closed.

    1. Inspection: Inspection Violation Unoccupied
    2. Inspection: Inspection Violation Posted No WIP

    The city links this case to permit 15-25621-FGAS.

  11. Permit Residential Certificate Issued No Meter

    Demolish double family house to grade. Contractor shall remove and dispose of all debris within 72 hours of completion. Proof of disposal required at time of final inspection. Separate permit require from sewerage and water board to cap sewer lines and r

    Permit
    11BLD-07191
    Type
    Residential
    Work
    Demolition
    Estimated cost (applicant’s figure)
    $10,000
    Fees
    $145
  12. Demolition FEMA demolition Completed
    Program
    FEMA
    Units
    2
    Started
    Sep 24, 2011
    Completed
    Sep 26, 2011

    Source: data.nola.gov BlightStatus demolitions (2009–2019, no longer updated)

  13. Code enforcement Case HCES-11-06899 Closed

    The case was filed on 08/23/2011 but has since been closed without further action.

    The city links this case to permit 15-25621-FGAS.

  14. Code enforcement Case HCEVU-11-01512 Closed

    The property was inspected on 03/09/2011 with a finding of "Violation Unoccupied". The file was subsequently closed.

    1. Inspection: Inspection Violation Unoccupied
    2. Inspection: Inspection Violation Posted No WIP

    The city links this case to permit 15-25621-FGAS.

  15. Code enforcement Case HCEC-11-00600 Closed

    The case was filed on 03/04/2011 but has since been closed without further action.

    The city links this case to permit 15-25621-FGAS.

  16. Code enforcement Case ENVHADJ-10-01166 Closed

    A hearing was held on 05/03/2010 with a result of "Found Guilty". The case was subsequently closed.

    1. Inspection: Inspection Violation Unoccupied - Bldg
    2. Hearing: Initial Hearing Found Guilty

    The city links this case to permit 15-25621-FGAS.

  17. Code enforcement Case ENVHADJ-991650SN Closed

    A hearing was held on 04/10/2009 with a result of "Found Guilty". The case was subsequently closed.

    1. Inspection: Inspection Complete
    2. Hearing: Initial Hearing Found Guilty

    The city links this case to permit 07BLD-02231.

  18. Code enforcement Case ENVHADJ-20011518SN Closed

    A hearing was held on 04/10/2009 with a result of "Found Guilty". The case was subsequently closed.

    1. Inspection: Inspection Complete
    2. Hearing: Initial Hearing Found Guilty

    The city links this case to permit 07BLD-02231.

  19. Code enforcement Case ENVHADJ-20015859HB Closed

    A hearing was held on 04/10/2009 with a result of "Found Guilty". The case was subsequently closed.

    1. Inspection: Inspection Complete
    2. Hearing: Initial Hearing Found Guilty

    The city links this case to permit 07BLD-02231.

  20. Code enforcement Case ENVHADJ-20043016SN Closed

    A hearing was held on 04/10/2009 with a result of "Found Guilty". The case was subsequently closed.

    1. Inspection: Inspection Complete
    2. Hearing: Initial Hearing Found Guilty

    The city links this case to permit 07BLD-02231.

  21. Code enforcement Case ENVHADJ-20052953SN Closed

    A hearing was held on 04/10/2009 with a result of "Found Guilty". The case was subsequently closed.

    1. Inspection: Inspection Complete
    2. Hearing: Initial Hearing Found Guilty

    The city links this case to permit 07BLD-02231.

  22. Code enforcement Case ENVHADJ-2008718EH Closed

    A hearing was held on 04/10/2009 with a result of "Found Guilty". The case was subsequently closed.

    1. Inspection: Inspection Complete
    2. Hearing: Initial Hearing Found Guilty

    The city links this case to permit 07BLD-02231.

  23. Code enforcement Case ENVHADJ-941811 Closed

    A hearing was held on 04/10/2009 with a result of "Found Guilty". The case was subsequently closed.

    1. Inspection: Inspection Complete
    2. Hearing: Initial Hearing Found Guilty

    The city links this case to permit 07BLD-02231.

  24. Code enforcement Case HCEVU-09-00247 Closed

    The property was inspected on 04/06/2009 with a finding of "Violation Unoccupied". The file was subsequently closed.

    1. Inspection: Inspection Violation Unoccupied

    The city links this case to permit 15-25621-FGAS.

  25. Code enforcement Case HCEC-09-00253 Closed

    The property was inspected on 04/06/2009 with a finding of "Violation Unoccupied". The file was subsequently closed.

    The city links this case to permit 15-25621-FGAS.

  26. Code enforcement Case HCEVU-09-00238 Closed

    The property was inspected on 04/06/2009 with a finding of "Violation Unoccupied". The file was subsequently closed.

    The city links this case to permit 15-25621-FGAS.

  27. Code enforcement Case HCEVU-09-00237 Closed

    The property was inspected on 04/06/2009 with a finding of "Violation Unoccupied". The file was subsequently closed.

    The city links this case to permit 15-25621-FGAS.

  28. Code enforcement Case HCEC-09-00243 Closed

    The property was inspected on 04/06/2009 with a finding of "Violation Unoccupied". The file was subsequently closed.

    The city links this case to permit 15-25621-FGAS.

  29. Code enforcement Case HCEVU-09-00236 Closed

    The property was inspected on 04/06/2009 with a finding of "Violation Unoccupied". The file was subsequently closed.

    The city links this case to permit 15-25621-FGAS.

  30. Code enforcement Case HCEC-09-00242 Closed

    The property was inspected on 04/06/2009 with a finding of "Violation Unoccupied". The file was subsequently closed.

    The city links this case to permit 15-25621-FGAS.

  31. Code enforcement Case HCEVU-09-00235 Closed

    The property was inspected on 04/06/2009 with a finding of "Violation Unoccupied". The file was subsequently closed.

    The city links this case to permit 15-25621-FGAS.

  32. Code enforcement Case HCEC-09-00241 Closed

    The property was inspected on 04/06/2009 with a finding of "Violation Unoccupied". The file was subsequently closed.

    The city links this case to permit 15-25621-FGAS.

  33. Code enforcement Case HCEVU-09-00234 Closed

    The case was filed on 04/06/2009 but has since been closed without further action.

    The city links this case to permit 15-25621-FGAS.

  34. Code enforcement Case HCEC-09-00240 Closed

    The property was inspected on 04/06/2009 with a finding of "Violation Unoccupied". The file was subsequently closed.

    The city links this case to permit 15-25621-FGAS.

  35. Code enforcement Case HCEC-09-00239 Closed

    The property was inspected on 04/06/2009 with a finding of "Violation Unoccupied". The file was subsequently closed.

    The city links this case to permit 15-25621-FGAS.

  36. Permit Demolition Inspection - Completed No Requirements

    DEMOLITION OF HURRICANE DAMEAGE SINGLE RESIDENTIAL UNIT. THE CONTRACTOR TO REMOVE AND DISPOSE OF ALL DEBRIS WITHIN 72 HOURS AND HAVE FINAL INSPECTION OF THE SITE. A LICENSED PLUMBER MUST SECURE A SEPARATE PERMIT FROM THE SEWAGE AND WATER BOARD TO CAP OFF SEWER LINES AND REMOVE WATER METER PRIOR TO DEMOLITION. 2022 FOUCHER ONLY

    Permit
    07BLD-02231
    Type
    Demolition
    Estimated cost (applicant’s figure)
    $10,000
    Fees
    $125

    Placed here by a close spelling of the street from “2022 S Foucher St”.

  37. Permit Residential APPROVAL

    katrina repairs.

    Permit
    ACCELA-80936
    Type
    Residential
    Work
    Repair
    Estimated cost (applicant’s figure)
    $40,000
  38. Permit Building

    CHANGE OF USE DOUBLE RESIDENCE CONVERT FROM DOUBLE TO SINGLE, SHEETROCK 2 WINDOWS, REMOVE 1 KITCHEN.

    Permit
    B03004316
    Type
    Building
    Days from application to issue
    0
  39. Permit Electrical

    GENERAL REPAIRS SINGLE-FAMILY DWELLING C. J. DAVIS

    Permit
    E01002661
    Type
    Electrical
    Days from application to issue
    0