1800 Amelia Street is in Milan, zoned HU-RD2 (Older neighborhoods, two-family homes mixed with single-family homes). It is in the Uptown historic district under partial HDLC control, where demolition needs HDLC review. The city has 6 permits on record here; the most recent, a renovation (non-structural) permit, was filed in March 2015. 4 are still open. There were 15 past code enforcement cases, the latest in April 2025, all closed. On this block in the past year: 4 requests to 311 and 1 call to police.
- Zoning
- HU-RD2
- Historic district
- Uptown (Partial control)
- National Register
- Uptown New Orleans Historic District
- Council district
- B
- Ward
- 12
- Lot size
- 4,828 sq ft
- Parcel
- 41052238
Everything on record here
21 records, newest first · 4 open
-
Code enforcement Case 25-04624-MPM Closed
The property was inspected on 05/11/2025 with a finding of "Violation: WIP". The file was subsequently closed.
- Inspection: Inspection Violation: WIP
The city links this case to permit 15-06335-RNVN.
-
Code enforcement Case 23-06381-MPM Closed
The property was inspected on 11/06/2023 with a finding of "Violation: No WIP". The file was subsequently closed.
- Inspection: Inspection Violation: No WIP
- Violation: 157 Sanitation
- Violation: 171 Weatherboards
- Violation: 172 Roofs
The city links this case to permit 15-06335-RNVN.
-
Code enforcement Case 18-03974-MPM Closed
The property was inspected on 06/14/2018 with a finding of "No Violation". The file was subsequently closed.
- Inspection: Inspection No Violation
The city links this case to permit 15-06335-RNVN.
-
Permit Renovation (Non-Structural) Permit Cancelled
Renovation
- Permit
- 15-06335-RNVN
- Type
- Renovation (Non-Structural)
- Work
- Renovation (Non-Structural)
- Estimated cost (applicant’s figure)
- $5,000
- Fees
- $85
-
Code enforcement Case 14-06307-MPM Closed
The property was inspected on 07/28/2014 with a finding of "Violation: No WIP". The file was subsequently closed.
- Inspection: Inspection Violation: No WIP
- Violation: 159 Sidewalks
- Violation: 160 Weeds and Plant Growth
- Violation: 168 Premises Identification
-
Permit Construction Loop Permit Issued
TEMP POLE- 12-26615
- Permit
- 13-05788-LOOP
- Type
- Construction Loop
- Work
- Construction Loop
- Estimated cost (applicant’s figure)
- $0
- Fees
- $40
- Contractor
- Casper Phillip Gelbke III
- Days from application to issue
- 0
- Expires
- Aug 25, 2013
-
Permit Renovation (Structural) Permit Issued
STRUCTURAL REPAIRS TO EXISTING VACANT COMMERCIAL STRUCTURE AS PER PLANS. REPAIRS INCLUDE STABILIZE AND REPAIR, FRAMING, ELECTRICAL, PLUMBING, CONCRETE, DRYWALL, SIDING, FENCE, LEVELING, WINDOWS, DOORS, STAIRS, PORCH, DECKING, AS PER PLANS..3701-03B ARONNE sT.
- Permit
- 12-26615-RNVS
- Type
- Renovation (Structural)
- Work
- Renovation (Structural)
- Estimated cost (applicant’s figure)
- $0
- Fees
- $110
- Days from application to issue
- 0
- Expires
- Apr 8, 2013
-
Code enforcement Case 12-07317-PNBL Closed
A hearing was held on 04/09/2013 with a result of "In Compliance Fees Due".
- Inspection: Inspection Violation: No WIP
- Inspection: Posting of Hearing Notice Violation: No WIP
- Hearing: Initial Hearing Reset: Work In Progress
- Inspection: Reinspection Violation: WIP
- Hearing: Reset Hearing Reset: Work In Progress
- Hearing: Reset Hearing Reset: Not Re-Inspected
- Inspection: Reinspection No Violation
- Hearing: Reset Hearing In Compliance Fees Due
The city links this case to permit E03003983.
-
Code enforcement Case ENVHADJ-97512 Closed
A hearing was held on 04/10/2009 with a result of "Found Guilty". The case was subsequently closed.
- Inspection: Inspection Complete
- Hearing: Initial Hearing Found Guilty
-
Code enforcement Case ENVHADJ-983548 Closed
A hearing was held on 04/10/2009 with a result of "Found Guilty". The case was subsequently closed.
- Inspection: Inspection Complete
- Hearing: Initial Hearing Found Guilty
-
Code enforcement Case ENVHADJ-994581SN Closed
A hearing was held on 04/10/2009 with a result of "Found Guilty". The case was subsequently closed.
- Inspection: Inspection Complete
- Hearing: Initial Hearing Found Guilty
-
Code enforcement Case ENVHADJ-20002233HB Closed
A hearing was held on 04/10/2009 with a result of "Found Guilty". The case was subsequently closed.
- Inspection: Inspection Complete
- Hearing: Initial Hearing Found Guilty
-
Code enforcement Case ENVHADJ-20003316EH Closed
A hearing was held on 04/10/2009 with a result of "Found Guilty". The case was subsequently closed.
- Inspection: Inspection Complete
- Hearing: Initial Hearing Found Guilty
-
Code enforcement Case ENVHADJ-20013731EH Closed
A hearing was held on 04/10/2009 with a result of "Found Guilty". The case was subsequently closed.
- Inspection: Inspection Complete
- Hearing: Initial Hearing Found Guilty
-
Code enforcement Case ENVHADJ-20053099SN Closed
A hearing was held on 04/10/2009 with a result of "Found Guilty". The case was subsequently closed.
- Inspection: Inspection Complete
- Hearing: Initial Hearing Found Guilty
-
Code enforcement Case ENVHADJ-961925 Closed
A hearing was held on 04/10/2009 with a result of "Found Guilty". The case was subsequently closed.
- Inspection: Inspection Complete
- Hearing: Initial Hearing Found Guilty
-
Code enforcement Case HCEVU-09-00221 Closed
The case was filed on 04/01/2009 but has since been closed without further action.
-
Code enforcement Case HCEC-09-00222 Closed
The property was inspected on 04/01/2009 with a finding of "Violation Unoccupied". The file was subsequently closed.
- Inspection: Inspection Violation Unoccupied
-
Permit Electrical
ELECTRICAL REWIRING MIXED OCCUPANCY BUDDY CAMBAS
- Permit
- E03003983
- Type
- Electrical
- Days from application to issue
- 0
-
Permit Electrical
ELECTRICAL VACANCY REPAIRS MIXED OCCUPANCY BUDDY CAMBAS
- Permit
- E03003984
- Type
- Electrical
- Days from application to issue
- 0
-
Permit Building
CHANGE OF USE DOUBLE RESIDENCE CONVERT MULTIFAMILY DWELLING UNIT INTO A DOUBLE, SHEETROCK, ROOF & WINDOW REPAIRS, REPLACE DOORS. 2-KITCHENS TO REMAIN IN BUILDING.ELECTRIC & PLUMB.
- Permit
- B03001739
- Type
- Building
- Days from application to issue
- 0