5317 Camp Street is in Uptown, zoned HU-RD2 (Older neighborhoods, two-family homes mixed with single-family homes). It is in the Uptown historic district under partial HDLC control, where demolition needs HDLC review. The city has 2 permits on record here; the most recent, an HDLC COA permit, was filed in September 2026. 1 is still open. On this block in the past year: 15 requests to 311 and 10 calls to police.
- Zoning
- HU-RD2
- Historic district
- Uptown (Partial control)
- National Register
- Uptown New Orleans Historic District
- Council district
- B
- Ward
- 13
- Lot size
- 3,714 sq ft
- Parcel
- 41054286
Everything on record here
2 records, newest first · 1 open
-
Permit HDLC COA Permit Cancelled
reroof
- Permit
- 26-25739-HDLC
- Type
- HDLC COA
- Work
- HDLC COA
- Estimated cost (applicant’s figure)
- $0
- Fees
- $0
- Days from application to issue
- 0
- Expires
- Mar 2, 2027
- Permit Case Created Complete
- Sub-Permit not required Complete
-
Permit Residential Re-Roofing Permit Issued
REROOF OF SINGLE FAMILY DWELLING PLEASE NOTE: Re-roofing permits DO NOT require an inspection from Safety and Permits, instead please upload the following photos to this permit PHOTOS REQUIRED 4 geotagged photos (one from each side) showing: -Removal of existing roof material -Installation of water intrusion resistant underlayment -Installation of the drip-edge and flashing -Installation of shingles or metal panels Once all applicable photos have been uploaded to the permit, please email requesting permit closure. http://onestopapp.nola.gov/
- Permit
- 26-25739-ROOF
- Type
- Residential Re-Roofing
- Work
- Residential Re-Roofing
- Estimated cost (applicant’s figure)
- $0
- Fees
- $60
- Contractor
- ARC Roofing LLC
- Days from application to issue
- 29
- Expires
- Mar 30, 2027
- Building - ReRoofing Paid
- Removal of Existing Roofing Material
- Installation of water Intrusion Resistant Underlay
- Installation of Drip-edge and Flashing
- Installation of Shingles or Metal Panels
- Application Submitted Complete
- Application submitted
- Application Review Complete
- Permit Approved Complete
- Sub-Permits Issued Complete
- Permit Intake Complete
- Application review
- Permit approved
- Permit Issued Complete
- Issue date