4524 Camp Street is in Uptown, zoned HU-RD2 (Older neighborhoods, two-family homes mixed with single-family homes). It is in the Uptown historic district under partial HDLC control, where demolition needs HDLC review. The city has 15 permits on record here; the most recent, a sidewalk repair permit, was filed in May 2024. 5 are still open. On this block in the past year: 18 requests to 311 and 11 calls to police.

Zoning
HU-RD2
Historic district
Uptown (Partial control)
National Register
Uptown New Orleans Historic District
Council district
B
Ward
13
Lot size
3,518 sq ft
Parcel
41054422

Everything on record here

15 records, newest first · 5 open

  1. Permit Sidewalk Repair Other

    Repairing the unlevel sidewalk; replacing the existing dry laid bricks with permeable pavers. The pavers will be the same permeable pavers we installed at Dooky Chase's sidewalk.

    Permit
    24-16724-RSWR
    Type
    Sidewalk Repair
    Work
    Sidewalk Repair
    Estimated cost (applicant’s figure)
    $0
    Fees
    $20
    Days from application to issue
    28
    Expires
    Dec 26, 2024

    See this permit on One Stop

  2. Permit Street Cut In Review

    Need to trench between sidewalk and roadway to install a 2" rigid pole for an EV charger.

    Permit
    24-04123-RSTC
    Type
    Street Cut
    Work
    Street Cut
    Estimated cost (applicant’s figure)
    $0
    Fees
    $152
    Contractor
    Frischhertz Electric Co

    See this permit on One Stop

  3. Permit Electric Vehicle Charger: Installation Permit Issued

    Installation of a 48 amp EV charger on a 2" rigid pipe mounted in the grass between sidewalk and at least 18" from roadway.

    Permit
    23-33040-EVIN
    Type
    Electric Vehicle Charger: Installation
    Work
    Electric Vehicle Charger: Installation
    Estimated cost (applicant’s figure)
    $3,350
    Fees
    $190
    Contractor
    Stephen T Frischhertz
    Days from application to issue
    60
    Expires
    Jul 30, 2024
    1. Application submitted
    2. Application review
    3. Zoning review
    4. Plan review
    5. Permit approved
    6. Issue date
    7. First inspection

    See this permit on One Stop

  4. Permit Electric Vehicle Charger: Electrical Permit Issued

    Installation of EV charger between sidewalk and roadway for on street parking owner use.

    Permit
    23-32816-EVCH
    Type
    Electric Vehicle Charger: Electrical
    Work
    Electric Vehicle Charger: Electrical
    Estimated cost (applicant’s figure)
    $3,350
    Fees
    $91
    Contractor
    Jonathan Stephen Frischhertz
    Days from application to issue
    95
    Expires
    Sep 4, 2024
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date

    See this permit on One Stop

  5. Permit Accessory Structure Occupancy

    Installing 1 Enphase Encharge battery to connect to existing solar system

    Permit
    21-26310-ACCS
    Type
    Accessory Structure
    Work
    Accessory Structure
    Estimated cost (applicant’s figure)
    $15,250
    Fees
    $140
    Contractor
    Marc Jones Construction LLC
    Days from application to issue
    18
    Expires
    Apr 8, 2022
    1. Application submitted
    2. Application review
    3. Zoning review
    4. Plan review
    5. Permit approved
    6. Issue date
    7. First inspection

    See this permit on One Stop

  6. Permit Permanent Generator Permit Finaled

    Installing 1 Enphase Encharge battery to existing solar system on home.

    Permit
    21-24252-EGEN
    Type
    Permanent Generator
    Work
    Permanent Generator
    Estimated cost (applicant’s figure)
    $15,250
    Fees
    $61
    Contractor
    Philip Albert Maguire
    Days from application to issue
    68
    Expires
    Apr 25, 2022
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  7. Permit Electrical Service / Circuit / Feeder Permit Issued

    New installation 200-amps 22-circuits new services panel New can meter New pole and wheather heads new grounds New blue boxes for outlets and switches new smoke detector New can lights new fan for bathroom new ceiling fans New #6,8,10,12 and 14 wires all New construction Electrical

    Permit
    18-31897-SERV
    Type
    Electrical Service / Circuit / Feeder
    Work
    Electrical Service / Circuit / Feeder
    Estimated cost (applicant’s figure)
    $7,000
    Fees
    $166
    Contractor
    Miguel Rivera
    Days from application to issue
    0
    Expires
    Mar 26, 2019
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  8. Permit Mechanical Fuel Gas Permit Finaled

    Gas filing for reno

    Permit
    18-31849-FGAS
    Type
    Mechanical Fuel Gas
    Work
    Mechanical Fuel Gas
    Estimated cost (applicant’s figure)
    $3,000
    Fees
    $40
    Days from application to issue
    0
    Expires
    Mar 26, 2019
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  9. Permit Change of Address Permit Issued

    18-26827-RNVN, Single family Retire 4524 Camp St Address of Record: 4526 Camp Street

    Permit
    18-27916-ECOA
    Type
    Change of Address
    Work
    Change of Address
    Estimated cost (applicant’s figure)
    $0
    Fees
    $0
    Days from application to issue
    0
    Expires
    Feb 23, 2019
    1. Application submitted
    2. Permit approved
    3. Issue date

    See this permit on One Stop

  10. Permit Renovation (Non-Structural) Occupancy

    Interior renovation of a single family home as per plans.

    Permit
    18-26827-RNVN
    Type
    Renovation (Non-Structural)
    Work
    Renovation (Non-Structural)
    Estimated cost (applicant’s figure)
    $266,880
    Fees
    $1,395
    Days from application to issue
    9
    Expires
    Feb 23, 2019
    1. Application submitted
    2. Application review
    3. Zoning review
    4. Plan review
    5. Permit approved
    6. Issue date
    7. First inspection

    See this permit on One Stop

    Placed here by an address range from “4524 Camp St, 4526 Camp St”.

  11. Permit Solar Permit Issued

    SOLAR PANELS- 13-34503

    Permit
    13-34710-SOLR
    Type
    Solar
    Work
    Solar
    Estimated cost (applicant’s figure)
    $0
    Fees
    $52
    Contractor
    Philip Albert Maguire
    Days from application to issue
    0
    Expires
    Feb 16, 2014

    See this permit on One Stop

  12. Permit Renovation (Non-Structural) Occupancy

    Installation 27 LG 260 watt solar panels on the roof of a single family dwelling as per sketch.

    Permit
    13-34503-RNVN
    Type
    Renovation (Non-Structural)
    Work
    Renovation (Non-Structural)
    Estimated cost (applicant’s figure)
    $25,000
    Fees
    $185
    Contractor
    Marc Jones Construction LLC
    Days from application to issue
    0
    Expires
    Feb 15, 2014

    See this permit on One Stop

  13. Permit Electrical Service / Circuit / Feeder Application Acceptance - Approved

    UPGRADE

    Permit
    09ELC-09502
    Type
    Electrical Service / Circuit / Feeder
    Work
    Service-Circuits-Feeders
    Estimated cost (applicant’s figure)
    $0
    Fees
    $75
    Contractor
    Aars Electrical Service LLC
    Days from application to issue
    10
  14. Permit Electrical Service / Circuit / Feeder Application Acceptance - Approved

    ADDITION

    Permit
    09ELC-05812
    Type
    Electrical Service / Circuit / Feeder
    Work
    Service-Circuits-Feeders
    Estimated cost (applicant’s figure)
    $0
    Fees
    $84
    Contractor
    Aars Electrical Service LLC
    Days from application to issue
    10
  15. Permit Renovation (Non-Structural) Application Acceptance - Approved No Review

    TEAR DOWN DAMAGED ATTACHED SHED,REMODEL BATHROOM

    Permit
    09BLD-01194
    Type
    Renovation (Non-Structural)
    Work
    Renovation (Non-Structural)
    Estimated cost (applicant’s figure)
    $38,500
    Fees
    $245
    Days from application to issue
    5