Uptown

1500 Leontine Street is in Uptown, zoned HU-RD2 (Older neighborhoods, two-family homes mixed with single-family homes). It is in the Uptown historic district under partial HDLC control, where demolition needs HDLC review. The city has 3 permits on record here; the most recent, a mechanical fuel gas permit, was filed in June 2020. On this block in the past year: 1 request to 311 and 0 calls to police.

Zoning
HU-RD2
Historic district
Uptown (Partial control)
National Register
Uptown New Orleans Historic District
Council district
B
Ward
13
Lot size
6,752 sq ft
Parcel
41054842

Everything on record here

3 records, newest first

  1. Permit Mechanical Fuel Gas Permit Finaled

    Ran 22’ of 1” gas pipe to generator.

    Permit
    20-30843-FGAS
    Type
    Mechanical Fuel Gas
    Work
    Mechanical Fuel Gas
    Estimated cost (applicant’s figure)
    $1,200
    Fees
    $50
    Days from application to issue
    1
    Expires
    Dec 11, 2020
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  2. Permit Permanent Generator Permit Issued

    20-27460-ACCS - INSTALLATION OF 22KW GENERATOR - LOAD SHEET & CONTRACT ATTACHED

    Permit
    20-28713-EGEN
    Type
    Permanent Generator
    Work
    Permanent Generator
    Estimated cost (applicant’s figure)
    $6,740
    Fees
    $76
    Contractor
    Brandon Augustus Francois
    Days from application to issue
    15
    Expires
    Dec 3, 2020
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  3. Permit Accessory Structure Other

    INSTALLATION OF 22KW GENERATOR WITH ELECTRICAL SYSTEM ALTERATOINS AND GAS LINE EXTENSION. ATTACHED SIGNED CONTRACT / SITE PLAN / GENERATOR SPECS ***Must be raised above BFE

    Permit
    20-27460-ACCS
    Type
    Accessory Structure
    Work
    Accessory Structure
    Estimated cost (applicant’s figure)
    $14,000
    Fees
    $130
    Days from application to issue
    12
    Expires
    Nov 18, 2020
    1. Application submitted
    2. Application review
    3. Zoning review
    4. Plan review
    5. Permit approved
    6. Issue date

    See this permit on One Stop