603 Eleonore Street is in West Riverside, zoned HU-RD2 (Older neighborhoods, two-family homes mixed with single-family homes). It is in the Uptown historic district under partial HDLC control, where demolition needs HDLC review. The city has 3 permits on record here; the most recent, a permanent generator permit, was filed in September 2023. 1 is still open. On this block in the past year: 7 requests to 311 and 4 calls to police.
- Zoning
- HU-RD2
- Historic district
- Uptown (Partial control)
- National Register
- Uptown New Orleans Historic District
- Council district
- A
- Ward
- 14
- Lot size
- 3,143 sq ft
- Parcel
- 41058127
Everything on record here
3 records, newest first · 1 open
-
Permit Permanent Generator Permit Finaled
Installing a 24kW Generac Generator and a 200 amp transfer switch for emergency backup power.
- Permit
- 23-24838-EGEN
- Type
- Permanent Generator
- Work
- Permanent Generator
- Estimated cost (applicant’s figure)
- $18,400
- Fees
- $103
- Contractor
- Jeremiah Alexander Johnson
- Days from application to issue
- 10
- Expires
- Mar 18, 2024
- Application submitted
- Application review
- Permit approved
- Issue date
- First inspection
-
Permit Mechanical Fuel Gas Permit Finaled
Installing a 24kW Generac Generator and a 200 amp transfer switch for emergency backup power.
- Permit
- 23-24827-FGAS
- Type
- Mechanical Fuel Gas
- Work
- Mechanical Fuel Gas
- Estimated cost (applicant’s figure)
- $18,400
- Fees
- $80
- Contractor
- Ready Power LLC
- Days from application to issue
- 3
- Expires
- Mar 11, 2024
- Application submitted
- Application review
- Permit approved
- Issue date
- First inspection
-
Permit Accessory Structure Permit Issued
Installing a 24kW Generac generator and a 200 amp transfer switch for emergency backup power.
- Permit
- 23-23424-ACCS
- Type
- Accessory Structure
- Work
- Accessory Structure
- Estimated cost (applicant’s figure)
- $18,400
- Fees
- $215
- Contractor
- Ready Power LLC
- Days from application to issue
- 14
- Expires
- Mar 7, 2024
- Application submitted
- Zoning review
- Application review
- Plan review
- Permit approved
- Issue date
- First inspection