Bywater
1530 Poland Avenue is in Bywater, zoned HU-B1 (Older neighborhoods, businesses serving nearby residents). The city has 5 permits on record here; the most recent, a residential permit, was filed in August 2011. 5 are still open. A building here was demolished under the FEMA program, completed in August 2011. There is 1 open code enforcement case. On this block in the past year: 5 requests to 311 and 13 calls to police.
- Zoning
- HU-B1
- Historic district
- None
- Council district
- D
- Ward
- 9
- Lot size
- 3,910 sq ft
- Parcel
- 41061292
Everything on record here
11 records, newest first · 6 open
-
Code enforcement Case 19-06427-MPM Closed
The property was inspected on 06/12/2019 with a finding of "Violation: No WIP". The file was subsequently closed.
- Inspection: Inspection Violation: No WIP
- Violation: 157 Sanitation
- Violation: 160 Weeds and Plant Growth
- Violation: 161 Rodent Harborage
- Violation: 164 Motor Vehicles
The city links this case to permit 11BLD-05664.
-
Code enforcement Case 14-11042-MPM Judgment
A hearing was held on 11/01/2016 with a result of "Guilty".
- Inspection
- Title Research
- Hearing
- Judgment
- In Compliance
- Inspection: Inspection Violation: No WIP
- Violation: 157 Sanitation
- Violation: 160 Weeds and Plant Growth
- Violation: 161 Rodent Harborage
- Inspection: Posting of Hearing Notice Violation: No WIP
- Hearing: Initial Hearing Guilty
- Inspection: Posting of Judgment Violation: No WIP
The city links this case to permit 04MCH-05774.
-
Demolition FEMA demolition Completed
- Program
- FEMA
- Units
- 2
- Started
- Aug 20, 2011
- Completed
- Aug 22, 2011
Source: data.nola.gov BlightStatus demolitions (2009–2019, no longer updated)
-
Permit Residential Permit Issuance Active
Demolish double family house to grade. Contractor shall remove and dispose of all debris within 72 hours of completion. proof of disposal required at time fo final inspection. Separate permit required from sewerage and water board to cap sewer lines and
- Permit
- 11BLD-05664
- Type
- Residential
- Work
- Demolition
- Estimated cost (applicant’s figure)
- $10,000
- Fees
- $145
-
Code enforcement Case HCEVU-10-00495 Closed
A hearing was held on 12/15/2010 with a result of "Guilty Public Nuisance Blight".
- Inspection: Inspection Violation Unoccupied
- Hearing: Initial Hearing Guilty Public Nuisance Blight
The city links this case to permit 11BLD-05664.
-
Code enforcement Case HCES-10-00352 Closed
The case was filed on 04/21/2010 but has since been closed without further action.
The city links this case to permit 11BLD-05664.
-
Code enforcement Case HCES-09-00442 Closed
The property was inspected on 09/14/2009 with a finding of "Violation Unoccupied". The file was subsequently closed.
- Inspection: Inspection Violation Unoccupied
The city links this case to permit 04MCH-05774.
-
Permit Residential Permit Issuance Active
DEMOLISH TWO FAMILY HOUSE TO GRADE. CONTRACTOR SHALL REMOVE AND DISPOSE OF ALL DEBRIS WITHIN 72 HOURS OF COMPLETION. PROOF OF DISPOSAL REQUIRED AT TIME OF FINAL INSPECTION. SEPARATE PERMIT REQUIRED FROM SEWERAGE AND WATER BOARD TO CAP SEWER LINES AND REM
- Permit
- 08BLD-07026
- Type
- Residential
- Work
- Demolition
- Estimated cost (applicant’s figure)
- $10,000
- Fees
- $125
-
Permit General Mechanical Inspection - Completed
OUT OVER SIX MONTHS. RONNIE CROSBY ($)
- Permit
- 04MCH-05774
- Type
- General Mechanical
- Work
- General Mechanical
- Estimated cost (applicant’s figure)
- $0
- Fees
- $30
- Contractor
- G And R Plumbing
- Days from application to issue
- 5
-
Permit Electrical Repair / Replacement / Addition Inspection - Completed
SIX MONTH VACANCY
- Permit
- 04ELC-06278
- Type
- Electrical Repair / Replacement / Addition
- Work
- Repair-Replacement-Addition
- Estimated cost (applicant’s figure)
- $0
- Fees
- $30
- Contractor
- E-1 Elec
- Days from application to issue
- 10
-
Permit Electrical Repair / Replacement / Addition Inspection - Completed
SIX MONTH VACANCY
- Permit
- 04ELC-06279
- Type
- Electrical Repair / Replacement / Addition
- Work
- Repair-Replacement-Addition
- Estimated cost (applicant’s figure)
- $0
- Fees
- $30
- Contractor
- E-1 Elec
- Days from application to issue
- 14