2608 Dauphine Street is in Bywater, zoned HMR-3 (Marigny, Tremé and Bywater single- and two-family homes, with some small multi-family buildings). It is in the Faubourg Marigny historic district under full HDLC control, so most exterior changes need approval first. The city has 16 permits on record here; the most recent, a mechanical fuel gas permit, was filed in September 2023. 2 are still open. A demolition permit was filed in March 2023. There were 2 past code enforcement cases, the latest in July 2009, all closed. On this block in the past year: 13 requests to 311 and 6 calls to police.

Zoning
HMR-3
Historic district
Faubourg Marigny (Full control)
National Register
Faubourg Marigny Historic District
Council district
C
Ward
9
Lot size
2,730 sq ft
Parcel
41063744

Everything on record here

18 records, newest first · 2 open

  1. Permit Mechanical Fuel Gas Permit Finaled

    Running a gas line to a generator

    Permit
    23-26377-FGAS
    Type
    Mechanical Fuel Gas
    Work
    Mechanical Fuel Gas
    Estimated cost (applicant’s figure)
    $2,300
    Fees
    $80
    Days from application to issue
    9
    Expires
    Apr 5, 2024
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  2. Permit Permanent Generator Permit Finaled

    WHOLE HOME FIXED GENERATOR INSTALLATION

    Permit
    23-21956-EGEN
    Type
    Permanent Generator
    Work
    Permanent Generator
    Estimated cost (applicant’s figure)
    $8,500
    Fees
    $106
    Contractor
    Brandon Augustus Francois
    Days from application to issue
    5
    Expires
    Feb 14, 2024
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  3. Permit HDLC COA Permit Cancelled

    WHOLE HOME FIXED GENERATOR INSTALLATION

    Permit
    23-19882-HDLC
    Type
    HDLC COA
    Work
    HDLC COA
    Estimated cost (applicant’s figure)
    $0
    Fees
    $0
    Days from application to issue
    0
    Expires
    Jan 24, 2024

    See this permit on One Stop

  4. Permit Accessory Structure Permit Issued

    WHOLE HOME FIXED GENERATOR INSTALLATION No digging

    Permit
    23-19882-ACCS
    Type
    Accessory Structure
    Work
    Accessory Structure
    Estimated cost (applicant’s figure)
    $15,800
    Fees
    $300
    Days from application to issue
    11
    Expires
    Feb 2, 2024
    1. Application submitted
    2. Application review
    3. Zoning review
    4. Plan review
    5. Permit approved
    6. Issue date

    See this permit on One Stop

  5. Permit Street Cut Other

    Install new gas service for customer.

    Permit
    23-05943-RSTC
    Type
    Street Cut
    Work
    Street Cut
    Estimated cost (applicant’s figure)
    $0
    Fees
    $0
    Days from application to issue
    0
    Expires
    Sep 6, 2023

    See this permit on One Stop

  6. Permit Mechanical Fuel Gas Permit Finaled

    install new gas line to supply stove water heater dryer and furnace and will install 30 gallon water heater

    Permit
    23-04674-FGAS
    Type
    Mechanical Fuel Gas
    Work
    Mechanical Fuel Gas
    Estimated cost (applicant’s figure)
    $2,546
    Fees
    $35
    Days from application to issue
    15
    Expires
    Sep 3, 2023
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  7. Permit Change of Address Permit Issued

    Owner Initiated KEEP 2610 Dauphine St RETIRE 2608 Dauphine St

    Permit
    22-23623-ECOA
    Type
    Change of Address
    Work
    Change of Address
    Estimated cost (applicant’s figure)
    $0
    Fees
    $0
    Days from application to issue
    0
    Expires
    Feb 8, 2023
    1. Application submitted
    2. Permit approved
    3. Issue date

    See this permit on One Stop

    Placed here by an address range from “2608-2610 Dauphine St”.

  8. Permit Mechanical HVAC Permit Finaled

    Installation of two air conditioning and heating systems, 2-ton TEMPSTAR heat pumps, Venting bathrooms and dryer

    Permit
    22-15834-HVAC
    Type
    Mechanical HVAC
    Work
    Mechanical HVAC
    Estimated cost (applicant’s figure)
    $14,000
    Fees
    $100
    Days from application to issue
    274
    Expires
    Aug 23, 2023
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  9. Permit Electrical Service / Circuit / Feeder Permit Finaled

    Wiring two-story single-family home according to plans with 200 amp service

    Permit
    22-15732-SERV
    Type
    Electrical Service / Circuit / Feeder
    Work
    Electrical Service / Circuit / Feeder
    Estimated cost (applicant’s figure)
    $14,000
    Fees
    $100
    Contractor
    Reinaldo Lopez
    Days from application to issue
    8
    Expires
    Dec 2, 2022
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  10. Permit Construction Loop Permit Finaled

    Temporary Pole.

    Permit
    21-15742-LOOP
    Type
    Construction Loop
    Work
    Construction Loop
    Estimated cost (applicant’s figure)
    $300
    Fees
    $40
    Contractor
    Reinaldo Lopez
    Days from application to issue
    8
    Expires
    Dec 9, 2021
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  11. Permit Interior Demolition Inspection Phase

    Interior demolition of double. No use & Occupancy. Renovation requires a separate permit. No exterior work allowed under this permit.

    Permit
    21-14364-DEMI
    Type
    Interior Demolition
    Work
    Interior Demolition
    Estimated cost (applicant’s figure)
    $10,000
    Fees
    $110
    Days from application to issue
    1
    Expires
    Nov 19, 2021
    1. Application submitted
    2. Application review
    3. Zoning review
    4. Permit approved
    5. Issue date
    6. First inspection

    See this permit on One Stop

  12. Permit HDLC COA Permit Finaled

    Renovation of existing contributing one-story, two-family residential building including construction of new rear addition.

    Permit
    21-13311-HDLC
    Type
    HDLC COA
    Work
    HDLC COA
    Estimated cost (applicant’s figure)
    $0
    Fees
    $50
    Days from application to issue
    88
    Expires
    Feb 6, 2022

    See this permit on One Stop

  13. Permit Renovation (Structural) Occupancy

    Interior Renovation and Addition of an Existing Single Family Home. Scope of work: Electrical, plumbing, flooring, roofing, framing, HVAC, insulation, sheetrock

    Permit
    21-13311-RNVS
    Type
    Renovation (Structural)
    Work
    Renovation (Structural)
    Estimated cost (applicant’s figure)
    $300,000
    Fees
    $2,790
    Contractor
    Ogar Construction LLC
    Days from application to issue
    105
    Expires
    Feb 20, 2022
    1. Application submitted
    2. Application review
    3. Zoning review
    4. Plan review
    5. Permit approved
    6. Issue date
    7. First inspection

    See this permit on One Stop

  14. Permit HDLC COA Permit Finaled

    Demolition of existing contributing one-story residential rear accessory structure to grade.

    Permit
    21-04209-HDLC
    Type
    HDLC COA
    Work
    HDLC COA
    Estimated cost (applicant’s figure)
    $0
    Fees
    $0
    Days from application to issue
    170
    Expires
    Feb 6, 2022

    See this permit on One Stop

  15. Permit Demolition Permit Finaled

    Demolition of deteriorated backyard accessory structure (shed). Existing single-family residence to remain.

    Permit
    21-04209-DEMO
    Type
    Demolition
    Work
    Demolition
    Estimated cost (applicant’s figure)
    $0
    Fees
    $188
    Contractor
    All Seasons Heating & Air Cond
    Days from application to issue
    752
    Expires
    Sep 6, 2023
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  16. Code enforcement Case HCEVU-09-00409 Closed

    The case was filed on 07/06/2009 but has since been closed without further action.

    The city links this case to permit 22-23623-ECOA.

  17. Code enforcement Case HCEC-09-00442 Closed

    The property was inspected on 07/06/2009 with a finding of "Violation Unoccupied". The file was subsequently closed.

    1. Inspection: Initial Inspection Violation Unoccupied

    The city links this case to permit 22-23623-ECOA.

  18. Permit Construction Loop Inspection - Completed

    const loop

    Permit
    05ELC-00835
    Type
    Construction Loop
    Work
    Construction Loop
    Estimated cost (applicant’s figure)
    $0
    Fees
    $30
    Contractor
    Landix Elect.
    Days from application to issue
    10