Bywater
825 Independence Street is in Bywater, zoned HMR-3 (Marigny, Tremé and Bywater single- and two-family homes, with some small multi-family buildings). It is in the Bywater historic district under full HDLC control, so most exterior changes need approval first. The city has 9 permits on record here; the most recent, an HDLC COA permit, was filed in March 2020. 4 are still open. On this block in the past year: 2 requests to 311 and 1 call to police.
- Zoning
- HMR-3
- Historic district
- Bywater (Full control)
- National Register
- Bywater Historic District
- Council district
- C
- Ward
- 9
- Lot size
- 3,039 sq ft
- Parcel
- 41064202
Everything on record here
9 records, newest first · 4 open
-
Permit HDLC COA Permit Issued
Gutters Originally issued as 20-HDLC-53
- Permit
- 20-20894-HDLC
- Type
- HDLC COA
- Work
- HDLC COA
- Estimated cost (applicant’s figure)
- $0
- Fees
- $0
- Days from application to issue
- 0
- Expires
- Sep 4, 2020
-
Permit Mechanical Fuel Gas Permit Finaled
Rework existing gas system
- Permit
- 20-03439-FGAS
- Type
- Mechanical Fuel Gas
- Work
- Mechanical Fuel Gas
- Estimated cost (applicant’s figure)
- $0
- Fees
- $65
- Contractor
- Kerry Dixon
- Days from application to issue
- 0
- Expires
- Aug 10, 2020
- Issue date
- Application submitted
- Application review
- Permit approved
-
Permit Mechanical HVAC Permit Issued
SYSTEM REPLACEMENT ON RENOVATED HOUSE
- Permit
- 20-01983-HVAC
- Type
- Mechanical HVAC
- Work
- Mechanical HVAC
- Estimated cost (applicant’s figure)
- $0
- Fees
- $85
- Contractor
- Jerry Raymond Carroll Jr
- Days from application to issue
- 0
- Expires
- Jul 24, 2020
- Issue date
- Application submitted
- Application review
- Permit approved
-
Permit Electrical Repair / Replacement / Addition Permit Issued
Rewire residence
- Permit
- 20-00459-ERPR
- Type
- Electrical Repair / Replacement / Addition
- Work
- Electrical Repair / Replacement / Addition
- Estimated cost (applicant’s figure)
- $0
- Fees
- $70
- Contractor
- Todd Dolce Electric
- Days from application to issue
- 0
- Expires
- Jul 8, 2020
- Issue date
- First inspection
- Application submitted
- Application review
- Permit approved
-
Permit HDLC COA Permit Cancelled
Remove one historic wood window at front room of building.
- Permit
- 19-25804-HDLC
- Type
- HDLC COA
- Work
- HDLC COA
- Estimated cost (applicant’s figure)
- $0
- Fees
- $0
-
Permit HDLC COA Permit Issued
Convert 825-27 to a single family residence with 1-kitchen and 1-meter to remain. Repairs include
- Permit
- 19-23460-HDLC
- Type
- HDLC COA
- Work
- HDLC COA
- Estimated cost (applicant’s figure)
- $0
- Fees
- $0
- Days from application to issue
- 30
- Expires
- Feb 28, 2020
-
Permit Renovation (Structural) Permit Issued
Convert 825-27 to a single family residence with 1-kitchen and 1-meter to remain. Repairs include framing (reinforcing existing beam), plumbing, electrical, HVAC, sheetrock and trim, cabinets and tile, painting, counter tops, siding, windows (no new openings).
- Permit
- 19-23460-RNVS
- Type
- Renovation (Structural)
- Work
- Renovation (Structural)
- Estimated cost (applicant’s figure)
- $90,000
- Fees
- $900
- Contractor
- Landrem Construction, Inc
- Days from application to issue
- 40
- Expires
- Mar 4, 2020
- Application submitted
- Application review
- Zoning review
- Plan review
- Permit approved
- Issue date
- First inspection
-
Permit Change of Address Permit Issued
Keep: 827 Independence St. Remove: 825 Independence St. Related Permit: 19-23560-RNVS.
- Permit
- 19-23467-ECOA
- Type
- Change of Address
- Work
- Change of Address
- Estimated cost (applicant’s figure)
- $0
- Fees
- $0
- Days from application to issue
- 1
- Expires
- Jan 26, 2020
- Application submitted
- Permit approved
- Issue date
Placed here by an address range from “825-827 Independence St”.
-
Permit Interior Demolition Inspection Phase
interior demo.
- Permit
- 19-15914-DEMI
- Type
- Interior Demolition
- Work
- Interior Demolition
- Estimated cost (applicant’s figure)
- $1,500
- Fees
- $70
- Days from application to issue
- 0
- Expires
- Nov 16, 2019
- Application submitted
- Application review
- Zoning review
- Permit approved
- Issue date
- First inspection