Seventh Ward
1239 Annette Street is in Seventh Ward, zoned HMR-2 (Historic Marigny, Tremé and Bywater homes, with smaller lots allowed). The city has 5 permits on record here; the most recent, a change of address permit, was filed in April 2018. 4 are still open. A demolition permit was filed in April 2008. There were 12 past code enforcement cases, the latest in December 2021, all closed. On this block in the past year: 5 requests to 311 and 18 calls to police.
- Zoning
- HMR-2
- Historic district
- None
- National Register
- New Marigny Historic District
- Council district
- C
- Ward
- 7
- Lot size
- 2,944 sq ft
- Parcel
- 41067749
Everything on record here
17 records, newest first · 4 open
-
Code enforcement Case 21-08852-MPM Closed
The property was inspected on 01/13/2022 with a finding of "No Violation". The file was subsequently closed.
- Inspection: Inspection No Violation
The city links this case to permit 18-13658-ECOA.
-
Permit Change of Address Permit Issued
Retire 1712 Marais St. Address of Record: 1239-1241 Annette Street
- Permit
- 18-13658-ECOA
- Type
- Change of Address
- Work
- Change of Address
- Estimated cost (applicant’s figure)
- $0
- Fees
- $0
- Days from application to issue
- 0
- Expires
- Oct 24, 2018
- Application submitted
- Permit approved
- Issue date
Placed here by an address range from “1239-1241 Annette St”.
-
Code enforcement Case 17-10640-MPM Closed
The property was inspected on 09/13/2017 with a finding of "No Violation". The file was subsequently closed.
- Inspection: Inspection No Violation
The city links this case to permit 18-13658-ECOA.
-
Code enforcement Case 16-10774-MPM Closed
The case was filed on 10/04/2016 but has since been closed without further action.
The city links this case to permit 18-13658-ECOA.
-
Code enforcement Case 13-05825-PNBL Closed
A hearing was held on 04/24/2014 with a result of "Guilty".
- Inspection: Inspection Violation: No WIP
- Violation: 157 Sanitation
- Violation: 160 Weeds and Plant Growth
- Inspection: Posting of Hearing Notice Violation: No WIP
- Hearing: Initial Hearing Guilty
- Inspection: Posting of Judgment Violation: WIP
The city links this case to permit 18-13658-ECOA.
-
Code enforcement Case ENVHADJ-10-00579 Closed
A hearing was held on 04/26/2010 with a result of "Found Guilty". The case was subsequently closed.
- Inspection: Inspection Vacant Lot
- Hearing: Initial Hearing Found Guilty
-
Code enforcement Case ENVHADJ-99597 Closed
A hearing was held on 04/10/2009 with a result of "Found Guilty". The case was subsequently closed.
- Inspection: Inspection Complete
- Hearing: Initial Hearing Found Guilty
The city links this case to permit 18-13658-ECOA.
-
Code enforcement Case ENVHADJ-20005103EH Closed
A hearing was held on 04/10/2009 with a result of "Found Guilty". The case was subsequently closed.
- Inspection: Inspection Complete
- Hearing: Initial Hearing Found Guilty
-
Code enforcement Case ENVHADJ-20011985EH Closed
A hearing was held on 04/10/2009 with a result of "Found Guilty". The case was subsequently closed.
- Inspection: Inspection Complete
- Hearing: Initial Hearing Found Guilty
The city links this case to permit 18-13658-ECOA.
-
Code enforcement Case ENVHADJ-20034134SN Closed
A hearing was held on 04/10/2009 with a result of "Found Guilty". The case was subsequently closed.
- Inspection: Inspection Complete
- Hearing: Initial Hearing Found Guilty
The city links this case to permit 18-13658-ECOA.
-
Code enforcement Case ENVHADJ-2004219EH Closed
A hearing was held on 04/10/2009 with a result of "Found Guilty". The case was subsequently closed.
- Inspection: Inspection Complete
- Hearing: Initial Hearing Found Guilty
The city links this case to permit 18-13658-ECOA.
-
Code enforcement Case ENVHADJ-20042767SN Closed
A hearing was held on 04/10/2009 with a result of "Found Guilty". The case was subsequently closed.
- Inspection: Inspection Complete
- Hearing: Initial Hearing Found Guilty
-
Code enforcement Case ENVHADJ-2009504P Closed
A hearing was held on 04/10/2009 with a result of "Found Guilty". The case was subsequently closed.
- Inspection: Inspection Complete
- Hearing: Initial Hearing Found Guilty
-
Permit Demolition Inspection - Completed
DEMOLISH TWO-FAMILY HOUSE TO GRADE. CONTRACTOR SHALL REMOVE AND DISPOSE OF ALL DEBRIS WITHIN 72 HOURS OF COMPLETION. PROOF OF DISPOSAL REQUIRED AT TIME OF FINAL INSPECTION. SEPARTE PERMIT REQUIRED FROM SEWAGE AND WATER BOARD TO CAP SEWER LINES AND REMOVE WATER METERS. 1239-41 ANNETTE ST IMMINENT DANGER
- Permit
- 08BLD-02977
- Type
- Demolition
- Work
- Demolition
- Estimated cost (applicant’s figure)
- $10,000
- Fees
- $125
- Contractor
- Drc Emergency Servces,Llc
- Days from application to issue
- 7
-
Permit Mechanical
INSTALL MECHANICAL EQUIPMENT DOUBLE RESIDENCE OUT OVER SIX MONTHS GARY 250-1156 120,000 BTUS
- Permit
- M01006235
- Type
- Mechanical
- Days from application to issue
- 0
-
Permit Electrical
ELECTRICAL VACANCY REPAIRS SINGLE-FAMILY DWELLING VACANT
- Permit
- E01006397
- Type
- Electrical
- Days from application to issue
- 0
-
Permit Building
BUILDING RENOVATIONS DOUBLE RESIDENCE FIX WINDOWS,CHANGE EXTERIOR DOORS,BATH- ROOM AND KITCHEN FLOORS, & WTHRBRDS WHEREVER NECESSARY. (1239-41 ANNETTE ST. AKA 1712 MARAIS)
- Permit
- B01001779
- Type
- Building
- Days from application to issue
- 0