Bywater
2335 Mazant Street is in Bywater, zoned HU-RD2 (Older neighborhoods, two-family homes mixed with single-family homes). The city has 3 permits on record here; the most recent, an electrical repair / replacement / addition permit, was filed in December 2012. 3 are still open. A demolition permit was filed in June 2009. There is 1 open code enforcement case. On this block in the past year: 5 requests to 311 and 10 calls to police.
- Zoning
- HU-RD2
- Historic district
- None
- Council district
- D
- Ward
- 9
- Lot size
- 3,178 sq ft
- Parcel
- 41068229
Everything on record here
5 records, newest first · 4 open
-
Code enforcement Case 26-04460-MPM Hearing
The file has been processed and reviewed by a title examiner and is awaiting scheduling for a hearing.
- Inspection
- Title Research
- Hearing
- Judgment
- In Compliance
- Violation: 157 Sanitation
- Violation: 164 Motor Vehicles
- Inspection: Inspection Violation: No WIP
- Inspection: Posting of Notice of Noncompliance Complete
The city links this case to permit 12-32846-ERPR.
-
Code enforcement Case 19-06377-MPM Closed
The property was inspected on 06/11/2019 with a finding of "Violation: No WIP". The file was subsequently closed.
- Inspection: Inspection Violation: No WIP
- Violation: 160 Weeds and Plant Growth
- Violation: 164 Motor Vehicles
The city links this case to permit 12-32846-ERPR.
-
Permit Electrical Repair / Replacement / Addition Permit Issued
LOWERING SERVICE- 12-31977
- Permit
- 12-32846-ERPR
- Type
- Electrical Repair / Replacement / Addition
- Work
- Electrical Repair / Replacement / Addition
- Estimated cost (applicant’s figure)
- $0
- Fees
- $40
- Contractor
- Matthew L Eskins
- Days from application to issue
- 0
- Expires
- Jun 10, 2013
Placed here by its map location from “2337 Mazant St”.
-
Permit Demolition Application Acceptance - Approved No Review
PERMIT ISSUED TO DEMOLISH SLAB ONLY.
- Permit
- 09BLD-03630
- Type
- Demolition
- Work
- Demolition
- Estimated cost (applicant’s figure)
- $5,000
- Fees
- $100
- Contractor
- Camp Dresser & Mckee
- Days from application to issue
- 8
-
Permit Demolition Certificate of Occupancy - Issued No Meter
Demolish Structure to grade. All permits issued for demolition require the Contractor to remove and dispose of all debris within 72 hours and to have a final inspection of the site. Proof of proper disposal of the debris required at the time of final inspection.
- Permit
- 06BLD-10095
- Type
- Demolition
- Work
- Demolition
- Estimated cost (applicant’s figure)
- $10,000
- Fees
- $125