2441 Feliciana Street is in Florida Area, zoned HU-RD2 (Older neighborhoods, two-family homes mixed with single-family homes). The city has 4 permits on record here; the most recent, an electrical service / circuit / feeder permit, was filed in December 2008. 4 are still open. A demolition permit was filed in March 2007. There was 1 past code enforcement case, the latest in June 2016, all closed. On this block in the past year: 6 requests to 311 and 15 calls to police.
- Zoning
- HU-RD2
- Historic district
- None
- Council district
- D
- Ward
- 9
- Lot size
- 3,531 sq ft
- Parcel
- 41069174
Everything on record here
5 records, newest first · 4 open
-
Code enforcement Case 16-05666-MPM Closed
The property was inspected on 07/15/2016 with a finding of "Violation: No WIP". The file was subsequently closed.
- Inspection: Inspection Violation: No WIP
- Violation: 157 Sanitation
- Violation: 159 Sidewalks
- Violation: 160 Weeds and Plant Growth
- Violation: 161 Rodent Harborage
- Inspection: Reinspection Violation: No WIP
The city links this case to permit 07BLD-02234.
-
Permit Electrical Service / Circuit / Feeder Application Acceptance - Approved
REWIRE
- Permit
- 08ELC-25874
- Type
- Electrical Service / Circuit / Feeder
- Work
- Service-Circuits-Feeders
- Estimated cost (applicant’s figure)
- $0
- Fees
- $140
- Contractor
- Galcan Electric LLC
- Days from application to issue
- 10
-
Permit Demolition Inspection - Completed No Requirements
DEMOLITION OF HURRICANE DAMEAGE SINGLE RESIDENTIAL UNIT. THE CONTRACTOR TO REMOVE AND DISPOSE OF ALL DEBRIS WITHIN 72 HOURS AND HAVE FINAL INSPECTION OF THE SITE. A LICENSED PLUMBER MUST SECURE A SEPARATE PERMIT FROM THE SEWAGE AND WATER BOARD TO CAP OFF SEWER LINES AND REMOVE WATER METER PRIOR TO DEMOLITION.
- Permit
- 07BLD-02375
- Type
- Demolition
- Work
- Demolition
- Estimated cost (applicant’s figure)
- $10,000
- Fees
- $125
- Days from application to issue
- 5
-
Permit Demolition Inspection - Completed No Requirements
DEMOLITION OF HURRICANE DAMEAGE SINGLE RESIDENTIAL UNIT. THE CONTRACTOR TO REMOVE AND DISPOSE OF ALL DEBRIS WITHIN 72 HOURS AND HAVE FINAL INSPECTION OF THE SITE. A LICENSED PLUMBER MUST SECURE A SEPARATE PERMIT FROM THE SEWAGE AND WATER BOARD TO CAP OFF SEWER LINES AND REMOVE WATER METER PRIOR TO DEMOLITION. 6062-64 NORTH DORGENOIS
- Permit
- 07BLD-02234
- Type
- Demolition
- Work
- Demolition
- Estimated cost (applicant’s figure)
- $10,000
- Fees
- $125
- Days from application to issue
- 5
-
Permit Demolition Application Acceptance - Approved No Review
Demolish Structure to grade. All permits issued for demolition require the Contractor to remove and dispose of all debris within 72 hours and to have a final inspection of the site. Proof of proper disposal of the debris required at the time of final inspection.
- Permit
- 06BLD-10817
- Type
- Demolition
- Work
- Demolition
- Estimated cost (applicant’s figure)
- $10,000
- Fees
- $125