Marigny

2112 Saint Claude Avenue is in Marigny, zoned HMC-2 (Marigny, Tremé and Bywater busier commercial streets). It is in the Faubourg Marigny historic district under full HDLC control, so most exterior changes need approval first. The city has 6 permits on record here; the most recent, a mechanical HVAC permit, was filed in October 2024. 2 are still open. There was 1 past code enforcement case, the latest in August 2023, all closed. On this block in the past year: 1 request to 311 and 1 call to police.

Zoning
HMC-2
Historic district
Faubourg Marigny (Full control)
National Register
Faubourg Marigny Historic District
Council district
C
Ward
7
Lot size
2,025 sq ft
Parcel
41069267

Everything on record here

7 records, newest first · 2 open

  1. Permit Mechanical HVAC Permit Finaled

    Installation of one 5 ton Condensing Unit at original location in back of building, braising to one 5 ton electric air handler located in original ceiling crawlspace. New thermostat wire to be installed, drainage to roughed in plumbing, minor duct modification, connection of safety switches, installation of new disconnect and low voltage wiring

    Permit
    24-30245-HVAC
    Type
    Mechanical HVAC
    Work
    Mechanical HVAC
    Estimated cost (applicant’s figure)
    $1,200
    Fees
    $71
    Contractor
    Phillip Joseph Honadle
    Days from application to issue
    32
    Expires
    May 4, 2025
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  2. Code enforcement Case 23-04922-MPM Closed

    The property was inspected on 02/09/2024 with a finding of "Violation: WIP". The file was subsequently closed.

    1. Violation: 165 Defacement of Property
    2. Violation: 167 Exterior Surfaces
    3. Violation: 167 Paint or Protective Treatment
    4. Violation: 171 Weatherboards
    5. Inspection: Inspection Violation: WIP

    The city links this case to permit 24-30245-HVAC.

  3. Permit Electrical Repair / Replacement / Addition Permit Finaled

    repair fire damaged wiring

    Permit
    23-19707-ERPR
    Type
    Electrical Repair / Replacement / Addition
    Work
    Electrical Repair / Replacement / Addition
    Estimated cost (applicant’s figure)
    $3,800
    Fees
    $130
    Contractor
    J Rosevally J J Anthony
    Days from application to issue
    98
    Expires
    Apr 26, 2024
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date

    See this permit on One Stop

  4. Permit HDLC COA Permit Finaled

    Secure building, clean debris, repair roof and siding to secure fthe building, gut interior per sketch

    Permit
    19-38786-HDLC
    Type
    HDLC COA
    Work
    HDLC COA
    Estimated cost (applicant’s figure)
    $0
    Fees
    $50
    Days from application to issue
    5
    Expires
    Jun 11, 2020

    See this permit on One Stop

  5. Permit Renovation (Structural) Other

    Secure building, clean debris, repair roof and siding to secure fthe building, gut interior per sketch No electrical, no mechanical, no plumbing. Emergency release to begin. Must follow up with fire report, SFM, plan. 2-28-23 Permit scope is changing to be FOR OCCUPANCY as a bar. Permit extended (2) 180 day periods until January 5, 2025

    Permit
    19-38786-RNVS
    Type
    Renovation (Structural)
    Work
    Renovation (Structural)
    Estimated cost (applicant’s figure)
    $38,590
    Fees
    $603
    Days from application to issue
    1307
    Expires
    Jan 5, 2024
    1. Application submitted
    2. Application review
    3. Zoning review
    4. Plan review
    5. Permit approved
    6. Issue date

    See this permit on One Stop

  6. Permit Electrical

    ELECTRICAL VACANCY REPAIRS SINGLE-FAMILY DWELLING VACANCY

    Permit
    E01005873
    Type
    Electrical
    Days from application to issue
    0
  7. Permit Building

    CERT. OF OCCUPANCY-NO WORK TO BE DONE BAR/COCKTAIL TO USE & OCCUPY THE BUILDING AS A BAR AS PER PAUL MAY.

    Permit
    B01003741
    Type
    Building