Bywater

5 Independence Street is in Bywater, zoned HMR-3 (Marigny, Tremé and Bywater single- and two-family homes, with some small multi-family buildings). It is in the Bywater historic district under full HDLC control, so most exterior changes need approval first. The city has 11 permits on record here; the most recent, a mechanical HVAC permit, was filed in December 2023. 3 are still open. On this block in the past year: 1 request to 311 and 0 calls to police.

Zoning
HMR-3
Historic district
Bywater (Full control)
National Register
Bywater Historic District
Council district
C
Ward
9
Lot size
6,487 sq ft
Parcel
41072160

Everything on record here

11 records, newest first · 3 open

  1. Permit Mechanical HVAC Permit Finaled

    Install 1 new 2 ton electric HVAC system.

    Permit
    23-34072-HVAC
    Type
    Mechanical HVAC
    Work
    Mechanical HVAC
    Estimated cost (applicant’s figure)
    $9,300
    Fees
    $65
    Days from application to issue
    2
    Expires
    Jun 15, 2024
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  2. Permit Plumbing Permit Permit Finaled

    Bathroom addition

    Permit
    23-33238-PLMB
    Type
    Plumbing Permit
    Work
    Plumbing Permit
    Estimated cost (applicant’s figure)
    $0
    Fees
    $100
    Contractor
    Dale W Powell
    Days from application to issue
    1
    Expires
    Jun 5, 2024

    See this permit on One Stop

  3. Permit Electrical Repair / Replacement / Addition Permit Issued

    Wire addition upstairs. Add lights and outlet. add one circuit. Upgrade sub panel to get more space. Same amperage

    Permit
    23-30123-ERPR
    Type
    Electrical Repair / Replacement / Addition
    Work
    Electrical Repair / Replacement / Addition
    Estimated cost (applicant’s figure)
    $6,670
    Fees
    $73
    Contractor
    Thao Tuan Dang
    Days from application to issue
    4
    Expires
    May 5, 2024
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date

    See this permit on One Stop

  4. Permit Permanent Generator Permit Finaled

    install transfer switch

    Permit
    23-28563-EGEN
    Type
    Permanent Generator
    Work
    Permanent Generator
    Estimated cost (applicant’s figure)
    $19,143
    Fees
    $103
    Contractor
    Craig Stevenson Jacomine Sr
    Days from application to issue
    2
    Expires
    Apr 19, 2024
    1. First inspection
    2. Application submitted
    3. Application review
    4. Permit approved
    5. Issue date

    See this permit on One Stop

  5. Permit Change of Address Permit Issued

    23-18654-RNVS Two-Family KEEP 831 Independence St KEEP 829 Independence St RETIRE 835 Independence St

    Permit
    23-27431-ECOA
    Type
    Change of Address
    Work
    Change of Address
    Estimated cost (applicant’s figure)
    $0
    Fees
    $0
    Days from application to issue
    0
    Expires
    Apr 6, 2024
    1. Application submitted
    2. Permit approved
    3. Issue date

    See this permit on One Stop

    Placed here by an address range from “829-835 Independence St”.

  6. Permit Permanent Generator Permit Finaled

    Install generator and transfer switch

    Permit
    23-25297-EGEN
    Type
    Permanent Generator
    Work
    Permanent Generator
    Estimated cost (applicant’s figure)
    $19,143
    Fees
    $103
    Contractor
    Craig Stevenson Jacomine Sr
    Days from application to issue
    13
    Expires
    Mar 26, 2024
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  7. Permit Mechanical Fuel Gas Permit Finaled

    RUN GAS LINE FOR GENERATOR

    Permit
    23-24645-FGAS
    Type
    Mechanical Fuel Gas
    Work
    Mechanical Fuel Gas
    Estimated cost (applicant’s figure)
    $1,500
    Fees
    $50
    Days from application to issue
    33
    Expires
    Apr 9, 2024
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  8. Permit HDLC COA Permit Finaled

    Install generator and transfer switch

    Permit
    23-21554-HDLC
    Type
    HDLC COA
    Work
    HDLC COA
    Estimated cost (applicant’s figure)
    $0
    Fees
    $0
    Days from application to issue
    0
    Expires
    Feb 9, 2024

    See this permit on One Stop

  9. Permit Accessory Structure Permit Issued

    Install generator and transfer switch No digging

    Permit
    23-21554-ACCS
    Type
    Accessory Structure
    Work
    Accessory Structure
    Estimated cost (applicant’s figure)
    $19,143
    Fees
    $330
    Contractor
    Craig Stevenson Jacomine Sr
    Days from application to issue
    30
    Expires
    Mar 6, 2024
    1. Application submitted
    2. Zoning review
    3. Application review
    4. Plan review
    5. Permit approved
    6. Issue date

    See this permit on One Stop

  10. Permit HDLC COA Permit Finaled

    New construction of a camelback addition at a Contributing, one-story, two-family residential building.

    Permit
    23-18654-HDLC
    Type
    HDLC COA
    Work
    HDLC COA
    Estimated cost (applicant’s figure)
    $0
    Fees
    $0
    Days from application to issue
    69
    Expires
    Mar 18, 2024

    See this permit on One Stop

  11. Permit Renovation (Structural) Permit Issued

    RENOVATION AND CAMELBACK ADDITION TO AN EXISTING TWO-FAMILY DWELLING. SCOPE OF WORK INCLUDES, REMOVAL OF INTERIORS AND EXTERIOR FINISHES AS REQUIRED FOR EXTENTS OF NEW CAMELBACK. NEW CONSTRUCTION OF A 2ND FLOOR CAMELBACK WITH FRAMING, INTERIOR & EXTERIOR FINISHES, MECHAINCAL, ELECTRICAL, AND PLUMBING. LANDSCAPING TO BE PORVIDED BY OTHERS.

    Permit
    23-18654-RNVS
    Type
    Renovation (Structural)
    Work
    Renovation (Structural)
    Estimated cost (applicant’s figure)
    $156,660
    Fees
    $1,503
    Days from application to issue
    105
    Expires
    Apr 23, 2024
    1. Application submitted
    2. Application review
    3. Zoning review
    4. Plan review
    5. Permit approved
    6. Issue date
    7. First inspection

    See this permit on One Stop

    Placed here by an address range from “829-831 Independence St”.