Lake Terrace & Oaks
6654 Marigny Street is in Lake Terrace & Oaks, zoned S-LRS2 (Lake area single-family homes). The city has 4 permits on record here; the most recent, a driveway/ curb cut and restoration permit, was filed in January 2026. 2 are still open. On this block in the past year: 2 requests to 311 and 0 calls to police.
- Zoning
- S-LRS2
- Historic district
- None
- Council district
- D
- Ward
- 8
- Lot size
- 9,305 sq ft
- Parcel
- 41072992
Everything on record here
4 records, newest first · 2 open
-
Permit Driveway/ Curb Cut and Restoration In Review
Rip and replace 645 sq ft of concrete driveway to include apron/sidewalk area.
- Permit
- 26-01142-RDRV
- Type
- Driveway/ Curb Cut and Restoration
- Work
- Driveway/ Curb Cut and Restoration
- Estimated cost (applicant’s figure)
- $0
- Fees
- $100
- Contractor
- Frontline Concrete Solutions LLC
-
Permit Permanent Generator Other
Installation of a 26kw Whole Home Generator & 200 Amp Transfer switch
- Permit
- 25-24025-EGEN
- Type
- Permanent Generator
- Work
- Permanent Generator
- Estimated cost (applicant’s figure)
- $16,503
- Fees
- $103
- Contractor
- Craig S Jacomine II
- Days from application to issue
- 4
- Expires
- Feb 11, 2026
- Application submitted
- Application review
- Permit approved
- Issue date
- First inspection
-
Permit Mechanical Fuel Gas Other
Gas line for generator
- Permit
- 25-23401-FGAS
- Type
- Mechanical Fuel Gas
- Work
- Mechanical Fuel Gas
- Estimated cost (applicant’s figure)
- $1,500
- Fees
- $80
- Contractor
- Pipes R Us Plumbing Inc
- Days from application to issue
- 5
- Expires
- Feb 6, 2026
- Application submitted
- Application review
- Permit approved
- Issue date
- First inspection
-
Permit Accessory Structure Permit Issued
Installation of a 26 kw Whole Home Generator & 200 Amp Transfer Switch
- Permit
- 25-22991-ACCS
- Type
- Accessory Structure
- Work
- Accessory Structure
- Estimated cost (applicant’s figure)
- $16,503
- Fees
- $205
- Contractor
- Craig S Jacomine II
- Days from application to issue
- 3
- Expires
- Feb 1, 2026
- Application submitted
- Application review
- Zoning review
- Plan review
- Permit approved
- Issue date
- First inspection