5700 Franklin Avenue is in Milneburg, zoned S-RS (Newer neighborhoods, single-family homes). The city has 8 permits on record here; the most recent, a mechanical fuel gas permit, was filed in July 2021. 2 are still open. A demolition permit was filed in December 2007. There is 1 open code enforcement case. On this block in the past year: 5 requests to 311 and 16 calls to police.
- Zoning
- S-RS
- Historic district
- None
- Council district
- D
- Ward
- 8
- Lot size
- 5,508 sq ft
- Parcel
- 41073484
Everything on record here
17 records, newest first · 3 open
-
Permit Mechanical Fuel Gas Permit Finaled
New gas line. New tankless water heater
- Permit
- 21-19012-FGAS
- Type
- Mechanical Fuel Gas
- Work
- Mechanical Fuel Gas
- Estimated cost (applicant’s figure)
- $1,900
- Fees
- $40
- Days from application to issue
- 6
- Expires
- Jan 7, 2022
- Application submitted
- Application review
- Permit approved
- Issue date
- First inspection
-
Permit Mechanical HVAC Permit Finaled
Install 5 ton HVAC system with 15KW heat strip and condenser
- Permit
- 21-15085-HVAC
- Type
- Mechanical HVAC
- Work
- Mechanical HVAC
- Estimated cost (applicant’s figure)
- $8,000
- Fees
- $76
- Days from application to issue
- 0
- Expires
- Nov 25, 2021
- Application submitted
- Application review
- Permit approved
- Issue date
- First inspection
-
Permit Electrical Service / Circuit / Feeder Permit Finaled
Rough-In/Rewire; New 200 amp panel, New Feeder, New Service, Trim-Trim(Receptacles, Switches, Plate Covers, Fixtures)
- Permit
- 21-15081-SERV
- Type
- Electrical Service / Circuit / Feeder
- Work
- Electrical Service / Circuit / Feeder
- Estimated cost (applicant’s figure)
- $12,000
- Fees
- $166
- Contractor
- Troy D Porter
- Days from application to issue
- 0
- Expires
- Nov 25, 2021
- Application submitted
- Application review
- Permit approved
- Issue date
- First inspection
-
Permit Construction Loop Permit Finaled
Temp Pole
- Permit
- 21-07176-LOOP
- Type
- Construction Loop
- Work
- Construction Loop
- Estimated cost (applicant’s figure)
- $850
- Fees
- $40
- Contractor
- Troy D Porter
- Days from application to issue
- 0
- Expires
- Sep 12, 2021
- Application submitted
- Application review
- Permit approved
- Issue date
- First inspection
-
Permit Driveway/ Curb Cut and Restoration Other
Install new driveway
- Permit
- 19-37804-RDRV
- Type
- Driveway/ Curb Cut and Restoration
- Work
- Driveway/ Curb Cut and Restoration
- Estimated cost (applicant’s figure)
- $0
- Fees
- $100
-
Permit New Construction Occupancy
New Construction 2111 Sqft Single family dwelling
- Permit
- 19-25993-NEWC
- Type
- New Construction
- Work
- New Construction
- Estimated cost (applicant’s figure)
- $163,695
- Fees
- $1,044
- Days from application to issue
- 557
- Expires
- Aug 23, 2021
- Application submitted
- Application review
- Zoning review
- Plan review
- Permit approved
- Issue date
- First inspection
-
Code enforcement Case 16-01489-MPM Judgment
A hearing was held on 08/04/2016 with a result of "Guilty".
- Inspection
- Title Research
- Hearing
- Judgment
- In Compliance
- Inspection: Inspection Violation: No WIP
- Violation: 157 Sanitation
- Violation: 160 Weeds and Plant Growth
- Inspection: Posting of Hearing Notice Violation: No WIP
- Hearing: Initial Hearing Guilty
- Inspection: Posting of Judgment Violation: WIP
The city links this case to permit 21-19012-FGAS.
-
Code enforcement Case 16-01357-MPM Closed
The property was inspected on 03/08/2016 with a finding of "Violation: No WIP". The file was subsequently closed.
- Violation: 159 Sidewalks
- Violation: 160 Weeds and Plant Growth
The city links this case to permit 21-19012-FGAS.
-
Code enforcement Case 12-09455-PNBL Closed
The property was inspected on 07/29/2011 with a finding of "In Compliance". The file was subsequently closed.
- Inspection: Inspection In Compliance
The city links this case to permit 21-19012-FGAS.
-
Code enforcement Case HCES-11-06348 Closed
The case was filed on 07/29/2011 but has since been closed without further action.
The city links this case to permit 21-19012-FGAS.
-
Code enforcement Case ENVHADJ-10-02927 Closed
A hearing was held on 01/14/2011 with a result of "Found Guilty". The case was subsequently closed.
- Inspection: Inspection Vacant Lot
- Hearing: Initial Hearing Found Guilty
The city links this case to permit 21-19012-FGAS.
-
Code enforcement Case ENVHADJ-09-02902 Closed
A hearing was held on 12/15/2009 with a result of "Found Guilty". The case was subsequently closed.
- Hearing: Initial Hearing Found Guilty
The city links this case to permit 21-19012-FGAS.
-
Code enforcement Case ENVHADJ-982327 Closed
A hearing was held on 04/10/2009 with a result of "Found Guilty". The case was subsequently closed.
- Inspection: Inspection Complete
- Hearing: Initial Hearing Found Guilty
The city links this case to permit 21-19012-FGAS.
-
Code enforcement Case ENVHADJ-20042648SN Closed
A hearing was held on 04/10/2009 with a result of "Found Guilty". The case was subsequently closed.
- Inspection: Inspection Complete
- Hearing: Initial Hearing Found Guilty
The city links this case to permit 21-19012-FGAS.
-
Code enforcement Case ENVHADJ-2004406SN Closed
A hearing was held on 04/10/2009 with a result of "Found Guilty". The case was subsequently closed.
- Inspection: Inspection Complete
- Hearing: Initial Hearing Found Guilty
The city links this case to permit 21-19012-FGAS.
-
Permit Demolition Certificate of Occupancy - Issued No Meter
DEMOLISH TO GRADE. CONTRACTOR SHALL REMOVE AND DISPOSE OF ALL DEBRIS WITHIN 72 HOURS OF COMPLETION. PROOF OF DISPOSAL REQUIRED AT TIME OF FINAL INSPECTION. SEPARTE PERMIT REQUIRED FROM SEWAGE AND WATER BOARD TO CAP SEWER LINES AND REMOVE WATER METERS DECLAIRED PUBLIC HEALTH THREAT
- Permit
- 07BLD-12411
- Type
- Demolition
- Work
- Demolition
- Estimated cost (applicant’s figure)
- $10,000
- Fees
- $125
- Contractor
- Drc Emergency Servces,Llc, Drc Emergency Servces,Llc
- Days from application to issue
- 5
-
Permit Demolition Application Acceptance - Approved No Review
DEMOLISH SINGLE FAMILY HOUSE TO GRADE. CONTRACTOR SHALL REMOVE AND DISPOSE OF ALL DEBRIW WITHIN 72 HOURS OF COMPLETION. PROOF OF DISPOSAL REQUIRED AT TIME OF FINAL INSPECTION. SEPARATE PERMIT REQUIRED FROM SEWAGE AND WATER BOARD TO CAP SEWER LINES AND REMOVE WATER METERS.
- Permit
- 07BLD-07362
- Type
- Demolition
- Work
- Demolition
- Estimated cost (applicant’s figure)
- $10,000
- Fees
- $125
- Days from application to issue
- 5